GovChime
Archived

ODF-T FY26 Sac Access Roadwork

Overview

Response deadline
12:00 PM CST
Posted
November 19, 2025
Notice type
Presolicitation
Set-aside
No Set aside used
NAICS
237310: Highway, Street, and Bridge Construction
Agency
Department of WarDepartment of the Army

Notice details

Office
US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION NORTHWESTERN.ENDIST KANSAS CITY.W071 ENDIST KANSAS CITY
Place of performance
Osceola, Missouri, 64776
Last updated
Nov 6, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
PANNWD-25-P-0000027109
Notice ID
2ff1207b375d45d5bc77ce6d0acfbc7b

Description

Harry S. Truman Lake Project Sac Access Roadwork

 The U.S. Army Corps of Engineers (USACE), Harry S Truman Dam & Reservoir, has a need for roadway and parking lot rehabilitation of public use areas. Contractor must include in their pricing all plant, labor, equipment, and all materials (not listed as Government Furnished) necessary for a complete installation. Optional CLINs may or may not be exercised as part of the Contract. The standard workday is 7:00 am to 4:30 pm Monday thru Friday, excluding Federal holidays. Work hours may be adjusted with approval of Contracting Officer. Any request for variation from these hours must be coordinated with the Contracting Officer at a minimum of 72 hours in advance. The Contractor shall comply with all applicable environmental Federal, State, and local laws and regulations. The Contractor shall be responsible for any delays resulting from failure to comply with environmental laws and regulations. During Construction, the Contractor shall be responsible for identifying, implementing, and submitting for approval any additional requirements for environmental compliance. A detailed Statement of Work will be provided with the Solicitation. The estimated period of performance for completion of the awarded contract is 270 calendar days from the Notice to Proceed (NTP). The estimated magnitude of this project, including all option contract line items (CLINs), is between $100,000 and $250,000. This  will be conducted as a full and open competition procurement. The applicable North American Industry Classification System (NAICS) Code is 237310 for Highway, Street, and Bridge Construction. The solicitation is expected to be available not less than 15 days of this notice, but within the next 60 days, and proposals are expected to be due at least 30 days after solicitation release date unless solicitation amendments extend the due date and time. The due date and time will be specified in the solicitation. Currently, no Pre-Solicitation Conference is planned for this solicitation. If the Government does elect to hold a Pre-Solicitation Conference, the Pre-Solicitation Announcement will be modified accordingly. There will be a site visit planned for this solicitation. The details to attend the site visit will be included in the solicitation. Bid Bonds will be required in the amount of 20% of the bid price or $3,000,000, whichever is less. Payment and Performance Bonds will be required for the full amount (100%) of the awarded contract before NTP can be issued. The contact information to submit technical inquiries and questions relating to the solicitation will be provided on the solicitation when it is made available. If you have questions about Government procurements in general or need assistance in the preparation of proposals, assistance may be available through the APEX Accelerators program (formerly known as the Procurement Technical Assistance Program). This program was originally authorized by Congress in 1985 to expand the number of businesses capable of participating in the Government marketplace. To find an APEX Accelerator near you, go to https://www.apexaccelerators.us/#/. (You may need to scroll down the page on the Apex Accelerator website to access the search function.) This is a free service by a nonprofit paid for by the U.S. Government. Interested offerors must have an active registration in the System for Award Management (SAM) database prior to submitting proposals. Firms can register through the https://www.sam.gov/SAM/ website to create or update their SAM.gov accounts. Quotes from contractors without an active SAM registration will NOT be considered for award. If the offeror is a Joint Venture (JV), the JV entity must have a valid SAM registration in the SAM database representing the JV as one business/firm/entity. SAM.gov registration is free of charge. For assistance with SAM.gov registration, please visit https://www.aptac-us.org/sam-registration/.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

No documents available.

Lifecycle

  1. 1
    Version 1PresolicitationArchived

    ODF-T FY26 Sac Access Roadwork

    Notice e6eb29d9fcb44a5dbc08ea9f94f64a3f on SAM.gov

  2. 3
    Version 3PresolicitationArchivedCurrent

    ODF-T FY26 Sac Access Roadwork

    Notice 2ff1207b375d45d5bc77ce6d0acfbc7b on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
This Sources Sought / Market Research Capabilities Questionnaire is issued to identify and assess potential industry capabilities, small-business participation, and acquisition-strategy considerations for a potential design-build construction project involving Active Vehicle Barrier Control System (AVBCS), guard booth, and associated access control point (ACP) infrastructure improvements at Shop Gate and Adams Gate, Fort Lee, Virginia. This notice is issued for planning and market-research purposes only. It is not a solicitation, request for proposal, request for quotation, or commitment by the Government to award a contract. This notice does not restrict the Government as to the ultimate acquisition approach. The Government will not reimburse respondents for costs associated with preparing or submitting a response. Responses are not offers and cannot be accepted by the Government to form a binding contract. The Government does not intend to rank submittals, provide individualized feedback, or return responses. Responses will be used to assess industry capability, small-business participation, acquisition strategy, scope packaging, potential sources, construction phasing, and schedule and supply-chain risk. This notice does not constitute a request for pricing.
-Market Research11/18/2026
***************************************************************************************** SOLICITATION AMENDMENT: W912P526QA037-0001 extends the offer due date to Tuesday, 15 September 2026 by 1:00 PM CT and various other changes. Refer to the attached amendment and the Procurement Integrated Enterprise Environment (PIEE) Solicitation Module for complete details. Attachments revised and added by amendment W912P526QA037-0001 are available in PIEE. PURPOSE: The Nashville District (LRN), U.S. Army Corps of Engineers (USACE), is issuing a Request for Quote (RFQ) for a Firm Fixed-Price Construction Contract utilizing the procedures at Revolutionary Federal Acquisition Regulation Overhaul (RFO) Part 12. DESCRIPTION: The Contractor will be responsible for the following activities/items under the proposed contract: This project is performed at the Cadiz Recreation Area and Canal Campgrounds at Lake Barkley located near Cadiz, KY. The project generally consists of paving and storm drain improvements within Canal Campground and Cadiz Recreational areas which includes, but may not be limited to, asphalt milling and overlay, full depth replacement of pavement, striping, asphalt curbing, asphalt speed bumps, and (11) culvert replacements. The option items generally includes, but may not be limited to, gravel shoulder, pavement extensions, slurry seal roads and parking lots, campsite paving, striping, and concrete ditch extensions. Location: Cadiz Recreation Area, Lake Barkley, near Cadiz, KY, and Canal Campground, Lake Barkley, near Grand Rivers, KY. Disclosure of Magnitude of the Proposed Construction Project: Between $1,000,000 and $3,500,000 NAICS CODE and SBA SIZE STANDARD: 237310 - Highway, Street, and Bridge Construction; Size Standard $45.0 Million SET-ASIDE TYPE: 100% Small Business DELIVERY DATE: 280 calendar days after issuance of Notice to Proceed (NTP) Drawings and Specifications: The technical plans and specifications are available at PIEE Solicitation Module. Questions: Questions shall be submitted via Projnet Bidder Inquiry using the quick key listed in the solicitation. Pre-Bid Site Visit: The pre-quote site visit has been scheduled for Wednesday, 26 August 2026 at 9:30AM Central Time (CT). The site visit request forms are attached. There will only be one site visit. Offerors should inspect the job site prior to submitting a quote. Offerors should take such other steps as may be reasonably necessary to ascertain the nature and location of work and the general and local conditions that can affect the work or the cost thereof. Failure to do so will not relieve offerors from the responsibility of for properly estimating the difficulty or cost of successfully performing the work. The Government assumes no responsibility for any understanding or representations concerning conditions made by any of its officers, agents or employees, unless included in the solicitation, the specifications or related documents. REGISTRATION: Only registered persons will be permitted to attend the pre-bid site visit. In addition to the information below, please also provide your firm's name, firm's CAGE and/or Unique Entity Identifier (UEI), and name and position title of primary point-of-contact and their telephone number and email address. Please provide this information via email to Richard (Brent) Hester at richard.b.hester@usace.army.mil and Andrew Roth at andrew.r.roth@usace.army.mil. Contractors and/or potential contractors wishing to attend a pre-bid meeting held at or in LRN restricted/controlled areas (such as a Power Plant or Navigation Lock) shall submit a Nashville District (LRN) Security Access Form to the Contract Specialist five (5) days prior to the site visit. If submitting the document in less than five days, the Offeror may not receive approval for participation. The Contract Specialist will notify the Contractor if the request is approval or denied. Any pre-quote meeting which will cover anything other than public domain information shall be limited to US Citizens, except under unique circumstances. The Security Access Form and guidance is available at https://www.lrn.usace.army.mil/Business-With-Us/Contracting. U.S. CITIZENS: The Offeror shall submit a Nashville District Corps of Engineers U.S. Citizen Security Request Form to the LRN Point of Contact, Contract Specialist Richard (Brent) Hester via email (richard.b.hester@usace.army.mil) no later than five calendar days prior to the site visit. If submitting the document in less than five days, the Offeror may not receive approval for participation. The LRN POC will notify the individual(s) if the request is approved or denied. The Security Access Form and guidance is available as a pdf attachment on sam.gov with this pre-solicitation and is titled U.S. Citizen Security Request Form. FOREIGN NATIONALS (FNs): All non-U.S. Citizens, including permanent residents wishing to attend the site visit must be approved in advance. FNs wishing to attend a site visit shall submit a completed Nashville District Corps of Engineers Foreign National Security Request Form and legible color copies of two of the following documents: Passport (unexpired or expired), Certificate of U.S. Citizenship (INS Form N-560 04 N-561), Certificate of Naturalization (INS Form N-550 or N-570), unexpired foreign Passport with 1-551 stamp or attached INS Form 1-94 indicating unexpired employment authorization, an Alien Registration Receipt Card with photo (INS Form 1-151 or 1-551), unexpired Temporary Resident Card (INS Form 1-688), unexpired Employment Authorization Card (INS Form 1-688A), unexpired Reentry Permit (INS Form 1-327), unexpired Refugee Travel Document (INS Form 1-571), or unexpired Employment Authorization Documentation issued by the INS which contains a photograph (INS Form I-688B) to the LRN Point of Contact, Contract Specialist Richard (Brent) Hester, who will forward the documents to the LRN-SM mailbox (dll-celmsm@usace.army.mil) for approval. These documents must be submitted no less than five (5) days prior to the site visit. FN requests require approval at the Headquarters U.S. Army Corps of Engineers (HQUSACE) level. Exceptions will be considered on a case-by-case basis but will be limited. The form is available as a pdf attachment on sam.gov with this presolicitation and is titled Foreign National Security Request Form. SYSTEM FOR AWARD MANAGEMENT (SAM): Offerors are required to be registered in the System for Award Management (SAM) database (https://sam.gov) and PIEE at the time a bid is submitted in order to comply with the annual representations and certifications requirements. Registration for PIEE is required as this is the only place bids shall be submitted. Quotes must be submitted in PIEE Solicitation Module. Please see the link below to submit quotes. ADDITIONAL INFOMRATION: Specific information pertaining to this procurement will be available in the solicitation. The solicitation documents will be posted on the SAM.gov website, https://sam.gov and PIEE Solicitation Module. It is and will continue to be the responsibility of all potential offerors to monitor the SAM.gov website for any amendments, updates, responses to questions and answers, etc. as the Government will not be maintaining a mailing list. Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under commercial construction contracts can be found by going to https://www.usace.army.mil/Business-With-Us/Partnering/ then clicking on "View FFP Contract Changes Playbook Here".
-Solicitation09/15/2026
AREQ III MATOC VENDOR ONLY. SEE ATTACHMENT FOR DETAILS.
-Combined Synopsis08/21/2026
***Amendment 0006 The purpose of this amendment is to incorporate tax exemption language. All other terms and changes remain unchanged. ***Amendment 0005 The purpose of this amendment is to remove FAR clause 52.236-16 and replace it with FAR 52.236-16 Alternate 1. This amendment also incorporates updated drawing sheets GI002 and CG203. All other terms and conditions remain unchanged. ***Amendment 0004 This amendment is issued to provide replies to ProjNet Bidder Inquiries as of 8 Aprio, and make all resulting changes. See attachments for full details of Amendment 0004. ***Amendment 0003 This amendment is issued to provide replies to ProjNet Bidder Inquiries, and make all resulting changes. ProjNet Bidder Inquiries is re-opened through 4:00pm CST, 3 April 2026. There are some attachments that must be requested in order to be provided via DoD SAFE. See attachments for full details of amendment 0003. ***Amendment 0002 This amendment is hereby issued to make administrative updates to the above-referenced solicitation in accordance with the Government Responses to ProjNet Bidder Inquiries as of 4 March 2026: ***Amendment 0001 This amendment is issued to make administrative updates to the solicitation. ***Proposal will be submitted via EMAIL Angie Grimes at angie.l.grimes@usace.army.mil and Whitney Dee at whitney.r.dee@usace.army.mil The U. S. Army Corps of Engineers, St. Louis District, is seeking a firm to furnishing all equipment, labor, operators, supervision/site superintendent, quality control, supplies, materials, and incidentals necessary to satisfactorily perform and provide construction activities of lock foundation and site preparation work. The lock foundation work establishes the lock wall and floor foundation. It consists of excavation and disposal of existing scour protection riprap that was part of previous scour hole emergency repair, dredging of sand fill, placement of sand fill in the proposed lock foundation, and placement of riprap berm. Work also includes the construction of a separator wall that will separate the river side riprap berm from the dredged sand that will be placed as foundation material for the future river wall monoliths and lock floor. The separate wall will be a sheet pile wall braced with piles. This effort also includes a deflector on the downstream side of the dam to route water flowing through the tainter gated dam adjacent to the river walls around the sheet pile separator wall. For the site preparation work, additional dredge borrow will be placed upland for a future staging and laydown area and a sanitary outfall pipe will be installed.
-Solicitation04/24/2026
The U.S. Army Corps of Engineers (USACE) is issuing this special notice to announce an upcoming competition for a design and construction solicitation for FY28 Horizontal Launch Infrastructure, SPOTFi (OTA) using Progressive Design-Build under 10 USC 2808a Other Transaction Authority for Construction. This notice is for informational and planning purposes to allow interested parties to prepare for and provide feedback prior to the official solicitation release.
-Special Notice11/24/2026

Additional Details

Solicitation Number

PANNWD-25-P-0000027109

Archive Date

Dec 19, 2025

Office Address

KANSAS CITY, MO, 64106-2896