GovChime
Notice ID: 69f7268b4d7b4a2299f27c3f1f8fa703Sources SoughtArchived

Columbia & Lower Willamette Rivers Pipeline Dredging

Archived on February 7, 2026. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
3:00 PM PST
Posted
January 8, 2026
Notice type
Sources Sought
Set-aside
No Set aside used
NAICS
237990: Other Heavy and Civil Engineering Construction
Agency
Department of WarDepartment of the Army

Notice details

Office
US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION NORTHWESTERN.ENDIST PORTLAND.W071 ENDIST PORTLAND
Place of performance
Oregon, 97204
Last updated
Nov 4, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
PANNWD-26-P-0000-028896
Notice ID
69f7268b4d7b4a2299f27c3f1f8fa703

Description

This SOURCES SOUGHT ANNOUNCEMENT is for informational and market research purposes only. This notice does not constitute a commitment by the Government. All information submitted in response to this announcement is voluntary, and the Government will not pay for information requested nor will it compensate any respondent for any cost incurred in developing information provided to the Government.

The U.S. Army Corps of Engineers (USACE) is conducting market research to identify interested and qualified parties for pipeline dredging of the Columbia and Lower Willamette Rivers Navigation Project. The Government may use responses for information and planning purposes. Responses are requested regardless of business size.

NAICS: The proposed NAICS code for this procurement is 237990 – Dredging and Surface Cleanup Activities

Size Standard: The small business size standard for NAICS Code 237990, as defined by the Small Business Administration (SBA), is $37M in average annual receipts. Additionally, to be considered small for purposes of Government procurement, a firm or its similarly situated subcontractors must perform at least 40 percent of the volume dredged with their own equipment or equipment owned by another small dredging concern.

Anticipated Period of Performance: To begin dredging onsite 01 Oct 2027. A minimum 5-year contract duration is anticipated, with a preference for a duration exceeding 10 years, pending necessary approvals.

Requirement Background: For nearly 100 years the USACE has satisfied the dredging requirement for Columbia and Lower Willamette Rivers (C&LW) Navigation Project channel maintenance in part through partnerships and contracts with the Port of Portland, execution of contracts with the dredge industry, and utilization of USACE’s fleet. Improvements to the Columbia River navigation channel were most recently authorized by Congress in the Consolidated Appropriations Act of 2004, which includes the following: 

The Secretary of the Army, acting through the Chief of Engineers, is directed to proceed with the construction of the Columbia River Channel Improvements, Oregon and Washington, project in accordance with (IAW) the Report of the Chief of Engineers, dated 23 December 1999, and the economic justification and environmental features stated therein, as amended by the Final Supplemental Environmental Impact Statement dated 28 January 2003.  P.L. 108-199, SEC 123, 118 Stat. 3, 440. 

In the Report of the Chief of Engineers, dated 23 December 1999, the Chief of Engineers recommended the deepening of the Columbia River channel to 43ft and requested that a non-Federal sponsor assist the Government by making a suitable pipeline dredge available:

“The Federal Government should be authorized to allow the non-Federal sponsor to assist in the work of maintaining the main ship channel in the Columbia and Willamette Rivers by making available to the United States (U.S.) a suitable pipeline dredge in good operating condition, with full crew and equipment, without charge other than reimbursement for the full operating cost of the dredge on a basis approved by the Chief of Engineers.  The reimbursement to be afforded, subject to Government audit, would be based on the full operating cost of the Port of Portland’s dredge while performing maintenance dredging of the project.  This would include the proportionate cost of maintenance of the dredge based on the period of time the dredge is performing work for the U.S. that fiscal year (FY) or the actual FY appropriations identified for that portion of maintenance dredging that are made available, whichever is less.” Chief of Engineer’s Report, dated 23 December 1999 at 5-6.

USACE Portland District is currently executing this requirement through a cost (no-fee) single award task order contract (SATOC) issued to Port of Portland on a sole-source basis. More detailed cost information is publicly available at FPDS.gov. Reference Indefinite Delivery Vehicle “W9127N17D0002” or follow the link below:

https://www.fpds.gov/ezsearch/fpdsportal?indexName=awardfull&templateName=1.5.3&s=FPDS.GOV&q=w9127n17d0002&x=0&y=0

Future (C&LW) Navigation Project channel maintenance pipeline dredging need is forecasted to increase in volume according to the Draft Lower Columbia River Draft Integrated Dredged Material Management Plan and Environmental Impact Statement.

Requirement Summary: The purpose of this requirement is to maintain the C&LW Navigation Project, which includes a 43-foot deep, 600-foot-wide channel in the Columbia River between Vancouver, Washington and the Pacific Ocean, and a 40-foot-deep channel of variable width in the Willamette River downstream of Portland, Oregon. This deep draft channel is the largest component of the Columbia - Snake River inland navigation system. The requirement includes pipeline dredging operations and maintenance, material placement, placement site preparation and maintenance, and related activities in support of the C&LW Navigation Project. Average annual dredging of 2.5 to 4 million cubic yards of material from the Columbia River deep draft navigation channel between river mile 20+00 and river mile 105+25 and in-water material transfer sites is required. Dredging depth is between 20 feet and 48 feet Columbia River Datum (CRD). Most placement sites are only accessible from the river by vessel. The contractor will be required to provide all support vessels, barges and equipment including shore equipment and facilities, a dedicated hydro and land survey capability, floating and shore pipe, and dredge and placement (upland) crews.

Requirement Details, Constraints, and Challenges:

  1. Annual maintenance dredging is required from 1 June to at least 31 Dec.  Availability for out-of-season emergency dredging response is required. Therefore, the full pipeline dredging operation will need to remain proximal to the C&LW Navigation project year-round. Environmental work windows allow for dredging year-round to prevent shipping restrictions.
  2. The contractor’s equipment and operations must be capable of supporting an average daily dredging production rate between 18,000 and 25,000 cubic yards.  Typical dredge assignments are 400 feet wide.
  3. Dredging depths are between 20 feet and 48 feet below CRD. The average tidal range is between 8 feet at the Mouth of the Columbia River (extreme is 13 feet) and 3 feet at low river stages at Vancouver. Annual freshets have little effect on river level at the Mouth of the Columbia River, but average 12 feet above CRD at Vancouver.
  4. Material to be dredged is primarily sand, gravel, and pumice. Approximate wet densities of representative sediment samples range from 1,520 grams/liter to 2,350 grams/liter. Snags, logs, cobbles, boulders, wire rope, and miscellaneous debris are encountered.
  5. The operation must be capable of dredging during 6 feet per second river currents, 25 mph wind with 40 mph gusts and wind waves up to 5 ft in an exposed river estuary environment with tidal exchange and river flow. The instantaneous flow in the lower reaches of the river changes constantly due to ocean tide effects and can range from greater than 5 times the mean daily-average river discharge to negative values (upstream flow).
  6. Equipment must support pumping up to 2 miles from the dredge site, to include a minimum of 12,000 linear feet of conventional discharge pipeline, 8,000 feet of which must be readily deployable as "floating line". A submersible discharge pipeline unit of not less than 900 feet in length is required for dredging and placement locations on opposite sides of the shipping channel. A fill elevation of up to 70 feet above CRD is required.
  7. Placement area requirements include: deep water placement areas using an end scow fitted with a 20-foot downspout and diffuser, shallow water placement sites filled to designed intertidal fill elevations, shoreline placement along riverbanks, construction of new islands within the river system, and confined upland placement with return water using gravity-fed weirs or pumps until a site can be sloped for gravity flow of return water.
  8. The Portland District will issue a general plan for the work required for the season early in the calendar year, however, it will direct the dredge to mobilize to specific locations approximately every 2-3 weeks, based on channel conditions and coordinated dredged material transfer operations with other dredges.
  9. Environmental compliance requirements include spill protection and response, turbidity minimization and monitoring, bird monitoring, avoidance and dissuasion, and wetland and riparian vegetation protection.

Interested Parties: All interested parties who believe they can meet the requirements are invited to submit, in writing, complete information describing their interest and ability to meet all requirements stated above. Prior Government contract work is not required for submitting a response to this announcement. Please keep your response concise. A maximum of six (6) pages of information including the below content is requested:

  1. Firm's name, address, point of contact, phone number, and email address.
  2. CAGE code and Unique Entity ID (UEI) number.
  3. Business classification: Small Business (SB), Small Disadvantaged Business (SDB), Woman Owned Small Business (WOSB), Veteran Owned Small Business (VOSB), Service-Disabled Veteran Owned Small Business (SDVOSB), Historically Underutilized Business Zone Small Business (HUBZone), 8(a) Program, Other Than Small Business (Large Business).
  4. A written capability statement in sufficient detail to demonstrate the ability of the firm to provide pipeline dredging services able to meet USACE Portland District requirements in a satisfactory manner, to include identifying the specific dredge plant to be used and where it is currently located.

Submission Instructions: Responses to this notice must be submitted electronically (via email) with SUBJECT: “Sources Sought Response – C&LW Pipeline Dredging,” to Mr. Mitchell Johnson, Contracting Officer, at mitchell.j.johnson@usace.army.mil and Mr. Brandon Lasich, Contract Specialist, at brandon.m.lasich@usace.army.mil. Responses must be submitted before 3:00 pm Pacific Standard time on 23 Jan 2026.

Disclaimer and Important Notes:

  1. This notice does not obligate the Government to award a contract. No reimbursement will be made for any costs associated with providing information in response to this notice or any follow up information. The Government reserves the right to use information provided by respondents for any purpose deemed necessary and legally appropriate. Any organization responding to this notice should ensure that its response is complete and sufficiently detailed to allow the Government to determine the organization's capabilities to perform the work. Respondents are advised that the Government is under no obligation to acknowledge receipt of the information received or to provide feedback to respondents with respect to any information submitted.
  2. The requirements listed above are not all inclusive but should cover most expectations.
  3. All interested parties must be registered in the System for Award Management (SAM) at https://www.sam.gov to have size status considered.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

No documents available.

Lifecycle

  1. 3
    Version 3Sources SoughtArchivedCurrent

    Columbia & Lower Willamette Rivers Pipeline Dredging

    Notice 69f7268b4d7b4a2299f27c3f1f8fa703 on SAM.gov

  2. 6
    Version 6Special NoticeArchived

    Type changed from Sources Sought to Special Notice

    Notice of Intent to Sole Source to Port of Portland - Columbia & Lower Willamette Rivers Pipeline Dredging

    Notice 0c4526db53b14bedb5f34ae50ad90104 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
Sources Sought: USACE, Portland District: W9127N27BA002 Yaquina River Clamshell Dredging 2027 This announcement is a Sources Sought Synopsis (market survey). This is not a Request for Proposal (RFP). This announcement is not a commitment by the Government, implied or otherwise, to issue a solicitation or award a contract. The purpose of this Sources Sought is to determine interested parties, socioeconomic status availability, capabilities, and qualifications. The Government intends to use responses to this sources sought synopsis to make appropriate acquisition decisions for future dredge maintenance requirements. The U.S. Army Corps of Engineers (USACE) Portland District is requesting your help in identifying dredges with the capability and availability to respond to critical dredging work required for the Yaquina River Clamshell Dredging 2027 throughout the Yaquina River downstream of Toledo, OR via clamshell. The total approximate scope is 850,000 cubic yards depending on project needs and funding availability. The in-water work window is 01 July 2027 - 31 October 2027.SUBMISSION REQUIREMENTS FOR RESPONSES TO THIS SOURCES SOUGHT SYNOPSIS Vendors interested in this requirement(s) with Portland District must submit the documentation and meet the requirements identified below. A. General Submission Information: 1. Point of Contact name, email address, and phone number. 2. CAGE Code and Unique Entity ID number (All contractors are required to be registered in the DOD System for Award Management (SAM) via https://www.sam.gov). 3. In the event that the contractor is a small business under NAICS 237990 or that of a similar size standard, state the category of small business, such as 8(a), HUBZone, Veteran Owned Small Business, Woman Owned Small Business, or SDVOSB. 4. Statement of Capability (SOC) Statement of the contractors skills, knowledge, experience, and capability to perform the described work, such as documentation and examples of recent relevant experience and technical competence with dredging. INSTRUCTIONS Submit technical inquires and questions relating to this sources sought in writing via email to: Julia Carlton (Julia.b.carlton2.civ@usace.army.mil) Brandon Lasich (brandon.m.lasich@usace.army.mil)SMALL BUSINESS POINT OF CONTACT The point of contact for small business questions or assistance is the Portland District Deputy for Small Business: Michael Stearns Phone: 410-962-5674Email: Michael.d.stearns@usace.army.mil
82%
Market Research11/17/2026
Mermentau River Bar Channel Dredging, Mermentau River- Gulf of America, Maintenance Dredging, #26-1, Cameron Parish, LA (ED 26-007) The work consists of satisfactory removal of all material above elevation -17.0- ft MLG from C/L Station (-)16+00 (Mile 6.5) to C/L Station 250+00 (Mile 1.3), of Mermentau River from the limits as specified herein and successfully deposited on the Gulf Shoreline west of the Mermentau jetties, as shown on the plans. A BID OPENING DATE IS TO BE SET BY AMENDMENT.
74%
Solicitation10/01/2028
This solicitation is issued as unrestricted. The NAICS code for this procurement is 237990. The magnitude of construction is between $25,000,000 and $100,000,000. The work consists of removal of material from within the Calcasieu River Ship Channel and satisfactory disposal within the designated confined disposal facilities adjacent to the Calcasieu River and Pass; all as shown on the drawings. Removal of material from within Devil’s Elbow, is included as optional work. The work also includes retention dike construction, surveys, and optional ditching and draining of disposal areas, and all operations incidental thereto. ***BID OPENING TO BE ESTABLISHED BY AMENDMENT***
73%
Solicitation06/12/2028
The U.S. Army Corpos of Engineers (USACE), Norfolk District hosted a Virtual Industry Day event on 18 November 2025, from 10:00 a.m. to 11:00 a.m. for the dredging industry contractors interested in the aniticipated James River Maintenance Dredging IDIQ contract and seed project. Attached are the files for Attendance, Scope Presentation, and the Q&A session. POC: Susan Ellis, Contract Specialist at susan.k.ellis@usace.army.mil and Nikki Kirtsey, Contracting Officer at tiffany.n.kirtsey@usace.army.mil
73%
Special Notice11/24/2026
Update - BID OPEING LOG IN INSTRUCTIONS for August 19, 2026 **AM03 - Updates Section 00 70 00 to include Clause 52.217-5. Nothing else is changed by way of this amendment* AM02 - Updates to Sections 00 07 00, 00 73 46, 01 57 19 and revised plan drawings. AM01 - Extends the due date to 19 Aug 2026, 1300 Local time. Additionally, the wage rates are also updated. Dredging of Los Angeles River Estuary and Port of Long Beach (Los Angeles County, CA) Construction services consisting of dredging (estimated quantities: 400,000 cubic yards) and disposal of material from the federal navigation channels of San Pedro Bay, specifically the Approach Channel at the Port of Long Beach (POLB) and the Los Angeles River Estuary (LARE) leading to the Queensway Marina. Disposal of the dredged material will be at an EPA approved ocean disposal site (LA-2). POLB design channel depths are 76 ft MLLW, and LARE channel depths are as deep as 25 ft MLLW. Estimated Construction magnitude is Between $5,000,000 and $10,000,000 NAICS Code 237990 Size Determination Size Determination $45.0M Period of Performance/Calendar Days- *Reference DIV00 Section 00 73 00. BE ADVISED. Files labeled with FIO are FOR INFORMATION ONLY. They are not provided as a material part of this acquisition, but are only provided for information only.
72%
Solicitation08/19/2026

Additional Details

Solicitation Number

PANNWD-26-P-0000-028896

Archive Date

Feb 7, 2026

Office Address

PORTLAND, OR, 97204-3495