GovChime
Notice ID: a964f3adb73148d6ac252e46aa714cd1Sources SoughtArchived

Chief Joseph Dam (CJD) National Pollutant Discharge Elimination System (NPDES) Laboratory Services - Base plus 4 Option Years

Archived on April 7, 2026. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
11:00 AM PDT
Posted
March 13, 2026
Notice type
Sources Sought
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
541380: Testing Laboratories and Services
Agency
Department of WarDepartment of the Army

Notice details

Office
US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION NORTHWESTERN.ENDIST SEATTLE.W071 ENDIST SEATTLE
Place of performance
Bridgeport, Washington, 98813
Last updated
Nov 2, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
PANNWD26P0000029105
Notice ID
a964f3adb73148d6ac252e46aa714cd1

Description

THIS IS A SOURCES SOUGHT NOTICE.

This notice does not constitute a commitment by the government.

Market research is being conducted to determine interest and capability of potential sources for this requirement. Information gathered from the market will be vital in the information and set aside status of the solicitation. Please note: All contractors doing business with the Federal government must be registered in the System for Award and Management database.  This website is as follows:  www.saw.gov.  

The North American Industry Classification System (NAICS) Code is 541380 (Size Standard: $16.5M) and the PSC is B533 - Special Studies/ Analysis Water Quality.

Please respond by the closing date if you can do the following:

1.  Are you capable of satisfying this requirement?

2. Can your firm provide the supplies/ services in compliance with the specifications listed in the PWS/QASP?

3. Does your firm qualigy as a Small Business?

4. Is your company registered and active in the System for Award Management? If so, provide your UEI number and Cage Code.

SEE ATTACHED PWS and QASP for requirement detials. PROJECT OVERVIEW IS PROVIDED BELOW:

Overview:

The Chief Joseph Dam Project is a hydroelectric facility operated by the U.S. Army Corps of Engineers (USACE), Seattle District.  The dam is located on the Columbia River at HWY 17 & Pearl Hill  Rd, Bridgeport, WA 98813.

The Corps has been issued a National Pollutant Discharge Elimination System (NPDES) permit from the U.S.
Environmental Protection Agency (EPA) Region 10 for the Chief Joseph Dam Project. To ensure the protection of
water quality and human health, this NPDES permit establishes limits on the types and amounts of pollutants that can
be discharged from the Project and requires routine monitoring of discharge points. The Corps is seeking an accredited
laboratory for analytical services to demonstrate compliance with the NPDES permit limits for Oil and Grease. Corps
personnel will conduct all sampling and packaging, and schedule pickup of coolers for delivery of the samples to the
laboratory.

Laboratory Accreditation:

The laboratory shall be accredited in accordance with the National Environmental Laboratory Accreditation
Program (NELAP) or have a current laboratory accreditation with the Washington State Department of Ecology
Environmental Laboratory Accreditation Program for the analyte(s) required in the task(s). If the laboratory cannot
conduct a specific analytical process, they may contract with another laboratory to perform the analysis. All
contractors and subcontractors, if any, shall submit at least one of the above accreditations qualifications/certificates
when submitting their quote per FAR 52.212-2 Evaluation – Commercial Items

OF IMPORTANT NOTE:  The  laboratory must be located within 200 road miles of Bridgeport, WA.

Work Performance Period

The base year and option years are shown below. Option years may be exercised at the Government’s discretion.

Base year: 01 May 2026 – 30 April 2027
Option year 1: 01 May 2027 – 30 April 2028
Option year 2: 01 May 2028 – 30 April 2029
Option year 3: 01 May 2029 – 30 April 2030
Option year 4: 01 May 2030 – 30 April 2031

SEE ATTACHED PWS and QASP for further specific details and criteria. 

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

Files (1)

  • A.02 PWS & QASP - CJD NPDES Water Sampling Service - Base plus 4 OY.pdf

    397 KBAdded in Sources Sought version 3Posted
    Download

Lifecycle

  1. 3
    Version 3Sources SoughtArchivedCurrent

    Chief Joseph Dam (CJD) National Pollutant Discharge Elimination System (NPDES) Laboratory Services - Base plus 4 Option Years

    Notice a964f3adb73148d6ac252e46aa714cd1 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
Amendment 0002 is issued to extend the Request for Quotation due date from 6 November 2026 to 18 November 2026, 12:00 PM PST and revise the period of performance start dates. Amendment 0001 is issued to extend the Request for Quotation due date from 2 November 2026 to 6 November 2026, 12:00 PM PST. The U.S. Army Corps of Engineers (USACE) at the Libby Dam Project (17877 Hwy 37, Libby, MT 59923) is modernizing its Main Unit Governors by replacing existing pressure switches with pressure transducers on five (5) units. The objective of this contract is to procure specialized governor control programming, Programmable Logic Controller (PLC) / Human Machine Interface (HMI) development, and commissioning support from the contractor to accommodate this hardware change. This is a turnkey requirement; the Contractor assumes full responsibility for understanding the existing system logic and delivering a fully functional, updated programming solution with no technical assistance from the Government. Work shall be accomplished on a rolling outage basis as units become available, spanning from the Contract Award Date through August 30, 2027. Work will occur across remote and on-site location, structured as follows: Tasks 1 & 3 (Remote): Contractor's Facility. Task 2 (On-Site Commissioning): Libby Dam Project, 17155 HWY 37, Libby, MT 59923-9703 Quoters must submit a Firm-Fixed-Price (FFP) quote for all contract line item numbers (CLINs). Incomplete quotes will be ineligible for award. To be considered for award, interested parties must submit an email quote package directly adhering to the following rules: E-mail Address: Quotes must be emailed to the Contract Specialist, Londres Medranda, at londres.medranda@usace.army.mil SAM Registration: Offerors must have an active registration in the System for Award Management (SAM.gov) at the time of quote submission and maintain it through performance and final payment. Inquiries & Questions: Questions must be sent via email to the Contract Specialist no later than five (5) working days prior to the quote due date. This ensures sufficient time for the Government to publish amendments on SAM.gov.
-Solicitation11/18/2026
The U.S. Army Corps of Engineers - St. Paul District is seeking a contractor to perform groundwater monitoring services in support of the Grand Encampment Dredge Material Placement Site Unload project along the Zumbro River near Kellogg, MN in Wabasha County. This solicitation is 100% set-aside for small business under NAICS 541380 with a size standard of $19 million. The contractor will collect water samples from three monitoring wells and up to four government-selected residential wells before, during and after the active unloading of the site in Spring 2027. During the active unload phase samples will also be collected from the river upstream of the site and from standing water within the active dredged-material placement/infiltration pit. Water samples will be analyzed by an environmental analytical testing laboratory accredited under the Minnesota Environmental Laboratory Accreditation Program (MNELAP) for all specified methods and parameters. Pre-Placement (Phase 1) samples will be collected and tested approximately 90, 60 and 30 days prior to the start of the active hydraulic transfer of stockpiled dredge materials to the upland placement site. Samples will be collected and tested during Active Placement (Phase 2) approximately 3, 17, and 31 days after the transfer begins, with options for additional sample collection and testing at approximately 45, 59 and 73 days after start of transfer. Post-Placement (Phase 3) samples will be collected and tested approximately 30, 60 and 90 days after the completion of the materials transfer. The contractor will prepare a final sampling and analysis report, submitted within 50 days of testing completion. All questions should be submitted in writing via the PIEE module Q and A section. Offers should be submitted via the PIEE Module. Click the first link in the Attachments/Links section.
-Solicitation11/18/2026
Combined Synopsis/Solicitation W911N226QA061 has been awarded.
-AwardedOpen
This is a PRE-SOLICITATION NOTICE. It is NOT a request for quotes (RFQ), invitation for bids (IFB), or request for proposals (RFP). This notice is provided for information and planning purposes only. It does not obligate the Government to any contractual action, including issuing a solicitation or awarding a contract. This is a statement that the Government intends to issue a Request for Quotes (RFQ) solicitation in the near future. The U.S. Army Corps of Engineers - St. Paul District will issue a Request for Quotes (RFQ) solicitation for a contractor to perform groundwater monitoring services in support of the Grand Encampment Dredge Material Placement Site Unload project along the Zumbro River near Kellogg, MN in Wabasha County. This solicitation will be 100% set-aside for small business under NAICS 541380 with a size standard of $19 million. The contractor will collect water samples from three monitoring wells and up to four government-selected residential wells before, during and after the active unloading of the site in Spring 2027. During the active unload phase samples will also be collected from the river upstream of the site and from standing water within the active dredged-material placement/infiltration pit. Water samples will be analyzed by an environmental analytical testing laboratory accredited under the Minnesota Environmental Laboratory Accreditation Program (MNELAP) for all specified methods and parameters. Pre-Placement (Phase 1) samples will be collected and tested approximately 90, 60 and 30 days prior to the start of the active hydraulic transfer of stockpiled dredge materials to the upland placement site. Samples will be collected and tested during Active Placement (Phase 2) approximately 3, 17, and 31 days after the transfer begins, with options for additional sample collection and testing at approximately 45, 59 and 73 days after start of transfer. Post-Placement (Phase 3) samples will be collected and tested approximately 30, 60 and 90 days after the completion of the materials transfer. The contractor will prepare a final sampling and analysis report, submitted within 50 days of testing completion.
-Pre-SolicitationOpen
Final QUESTIN/ANSWERS Spreadsheet uploaded. _____________________________________________________________________________ QUESTIONS/ANSWERS POSTED. Solicitation extended to 10 Nov 2026, 10am(CT). ______________________________________________________________________________ Amendment 0001 - 1st paragraph page 1, changed quantity of 400 to 100 and 25 to 10. _______________________________________________________________________________ Requirement - Helium Inspection Services. Read all attachments. Please make certain Cage Code is current.
-Solicitation11/10/2026

Additional Details

Solicitation Number

PANNWD26P0000029105

Archive Date

Apr 7, 2026

Office Address

SEATTLE, WA, 98134-2329