Notice ID: 57f2f883620f3dc8067531e9594e3417Award NoticeAwarded
80--Pave entrance and Exit approaches at Badlands National Park
Awarded on September 23, 2008. Full description on SAM.gov.
Awarded tounder P130008A095 (source: SAM.gov award notice)• $31.0K
Overview
- Posted
- September 23, 2008
- Notice type
- Award Notice
- Agency
- Department of the InteriorNATIONAL PARK SERVICE
Notice details
- Office
- DSC CONTRACTING SERVICES DIVISION
- Place of performance
- Badlands National Park25216 Ben Reifel RoadInterior, SD 57750 57751 USA
- PSC
- 80: BRUSHES, PAINTS, SEALERS, ADHESIVES
- Last updated
- Sep 25, 2026
- Award date
- Sep 23, 2008
- Award amount (SAM.gov award notice)
- $31.0K
Identifiers
- Solicitation number
- Q130008A095
- Notice ID
- 57f2f883620f3dc8067531e9594e3417
- Award number (PIID)
- P130008A095
Description
The National Park Service has requirement for Paving of Entrance and Exit Approaches at Badlands National Park, Inteior, South Dakota.The project consists of the paving of the approaches in accordance with SDDOT Specifications. price should include mobilization, no prime or flush included, no traffic control, no subgrade prep, proof rooling, or final finish. areas must be ready to pave. Mobilization ACP 6 inch SDDOT E1 W/64-ww Compacted in 2 inch lifts, ACP 6" SDDOT Specs E1 WPG64-22. Place hot-mix asphalt to required grade, cross section, and thickness. Compacted thickness of each lift shall not exced 3 inches. Promptly correct surface irregularaties in paving course. Spread mix at a minimum temperature of 250 degrees F. Begin compaction as soonas placed hot-mix paving will bear roller weight without excessive displacement. compact hot-mix paving with hot, hand tampers or vibratory-plate compactors in areas inaccessible to rollers. Complete compaction before mix temperature colls to 185 degrees F. Complete breakddown or initial rolling immediately after rolling joints and outside edge. Examine surface immediately after breakdown rolling for indicated crown, grade, and smoothness. Bein immediate rolling after breakdown rolling while hot-mix asphalt is still hot enough to achieve specified density. Continue rolling until hot-mix asphalt course has been uniformly compacted to 92 percent of reference maximum theoretical density according to ASTM D2041. Finish roll paved surfaces to remove roller marks wwhile hot-mix asphalt is still warm. Remove and restore paved areas that are defective or contaminated. The magnitude of this project is under $25,000.00. NAICS Code: 237310, P&S Z222. This project is 100% set aside for small business. PAPER COPIES OF THIS SOLICITATION WILL NOT BE ISSUED AND TELEPHONE REQUESTS OR FAX REQUESTS FOR THE SOLICITATION WILL NOT BE ACCEPTED. This solicitation will be available ONLY!! at the DOI Webiste (http://ideasec.nbc.gov) O/A August 26,2008 and unless amendments are issued extending the solicitation, the offers are due in this office on September 9, 2008 by 4:30 PM MT. In order to download a copy of the solicitation vendors will be asked to register their company with the electronic commerce website. Be prepared with your company DUNS Number, available from Dun and Bradstreet at 1-888-546-0024 and your federal Tax Identification Number (TIN). All vendors should pre-register with ORCA and the CCR by logging into http://www.ccr.gov. Your point of contact for this project is Ronald Eilefson, Contracting Officer 605-574-3130. Email ron_eilefson@nps.gov. All responsible sources may submit an offer which if submitted in a timely manner, will be considered. The Government rserves the right to cancel this announcement and the resulting solicitation. This announcement does not constitute a solicitation.
Award Overview
Award Number
P130008A095
Award Amount (SAM.gov award notice)
$31.0K
Award Date
Sep 23, 2008
Awardee
Original Solicitation
Notice ID: 57f2f883620f3dc8067531e9594e3417
Posted Date: Sep 23, 2008
Original Response Deadline: Not specified
Contract Details
Contract data not yet available
Contract details typically appear within 2-4 weeks after award; DoD awards are published about 90 days after signature.
Contacts
Contracting Officer
Primary Contact
Ron Eilefson Lead Contract Specialist 6055743130 Ron_Eilefson@nps.gov; Point of Contact above, or if none listed, contact the IDEAS EC HELP DESK for assistance
Documents
No documents available.
Lifecycle
Solicitation:
Q130008A095- Pre-Solicitation
- Awarded
This opportunity has been awarded.
- 4×Pre-SolicitationAug 16, 2008
Z--Paving Entrance and Exit approaches at Badlands National Park.
- AwardedCurrentSep 23, 2008
80--Pave entrance and Exit approaches at Badlands National Park
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
Q130008A095
Archive Date
Sep 23, 2009
Office Address
Denver, CO, 80225