GovChime
Notice ID: 5639bd86e1d00689304534ae5768053aSolicitation

RECOVERYARRA Project No. 28.002TAS::14 0681::TAS Drought Relief - Construction of New Wells

Archived on May 1, 2011. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
7:00 AM UTC+02:00
Posted
June 24, 2010
Notice type
Solicitation
Agency
Department of the InteriorBUREAU OF RECLAMATION

Notice details

Office
DENVER FED CENTER
PSC
Y: CONSTRUCT OF STRUCTURES/FACILITIES
Last updated
Dec 5, 2025

Identifiers

Solicitation number
R10PS20R80
Notice ID
5639bd86e1d00689304534ae5768053a

Description

RECOVERYTitle: Drought Relief - Construction of New Wells PSC: Y299Place of Performance: San Joaquin, Stanislaus, Merced, Fresno, and Kings Counties, CaliforniaSolicitation Number R10PS20R80 TAS::14 0681::TASARRA Project No. 28.002 The Bureau of Reclamation intends to issue a Request for Proposals for a firm fixed price construction contract for new wells. The work is located in the following counties within California: San Joaquin, Stanislaus, Merced, Fresno, and Kings. The applicable North American Industry Classification System (NAICS) Code is 237990 and the related small business size standard is $33.5 Million. The solicitation will include HUBZone Price Evaluation Preference procedures as described in Federal Acquisition Regulation (FAR) 19.1307. The principal components of work are as follows: A. Drill test holes at proposed well sitesB. Take geologic samples during drilling to produce lithologic profile of the holeC. Perform electrical logs on the test hole and produce a resistivity profile of the holeD. Determine the best levels within the hole to place screened casing intervals, and submit recommendations for well installation to Reclamation for approvalE. Furnish and install well components including casing, screen, filter pack, and all other necessary componentsF. Develop and test each well and submit recommendations for pump selection to ReclamationG. Furnish and install components to complete wells, including pump/motor systems, column piping, pressure sensors, well heads, and cast-in-place concrete padsH. Furnish and install new control panelsI. Provide all conduits, cabling, and wiring to complete all power, control, and ground installation at each wellJ. Furnish new flow meters to districts/ownersK. Coordinate with local utilities to bring power to well site The estimated cost of this project is between $10,000,000 and $25,000,000. This procurement will require 100% performance and payment bonds. Solicitation R10PS20R80 will be posted at http://ideasec.nbc.gov on or around May 17, 2010. The estimated date for receipt of bids is June 15, 2010. The solicitation and specifications will need to be downloaded at the above site. No paper copy of this solicitation will be distributed. There are no drawings associated with this requirement. Central Contractor Registration (CCR) and Annual Representations and Certifications, as required by FAR 4.11 and 4.12, apply to this procurement. Prospective contractors must be registered prior to award. Lack of registration in the CCR database will make an offeror ineligible for award. Information on CCR registration can be obtained via the Internet at http://www.ccr.gov. Information on annual Representations and Certifications can be obtained via the Internet at http://orca.bpn.gov. Questions concerning this solicitation should be directed to Brenda Davis by email at bdavis@usbr.gov. Please be advised that the Awardee will be subject to Section 1512(c) of the Recovery Act, which requires that each contractor report on its Recovery Act funds under the awarded contract. These reports will be made available to the public.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Brenda L. Davis Contract Specialist 9169785143 bdavis@usbr.gov; Point of Contact above, or if none listed, contact the IDEAS EC HELP DESK for assistance

Documents

No documents available.

Lifecycle

Solicitation:R10PS20R80
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. 3×
    Pre-SolicitationMay 1, 2010

    RECOVERYARRA Project No. 28.002TAS::14 0681::TAS Drought Relief - Construction of New Wells

    Notice 3253665d13395a7ae5dfd677cb909de9 on SAM.gov

  2. SolicitationCurrentJun 24, 2010

    RECOVERYARRA Project No. 28.002TAS::14 0681::TAS Drought Relief - Construction of New Wells

    Notice 5639bd86e1d00689304534ae5768053a on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

R10PS20R80

Archive Date

May 1, 2011