Notice ID: b21f75bd70a9dd9fb7ef88a8924573eaSolicitation
Black Canyon Irrigation District Pumping Plant and Switchyard_Transformer Replacement
Archived on November 20, 2012. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 6:00 AM UTC+01:00
- Posted
- February 9, 2012
- Notice type
- Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- Agency
- Department of the InteriorBUREAU OF RECLAMATION
Notice details
- Office
- DENVER FED CENTER
- PSC
- 61: ELECTRIC WIRE, POWER DISTRIB EQPT
- Last updated
- Dec 5, 2025
Identifiers
- Solicitation number
- R12PS10006
- Notice ID
- b21f75bd70a9dd9fb7ef88a8924573ea
Description
ANNOUNCEMENT The Bureau of Reclamation, Pacific Northwest Region, has a requirement to purchase and replace a 69-kV oil-filled power transformer and associated features. The work shall be performed at Black Canyon Irrigation District Pumping Plant and Switchyard located approximately 8 miles west of Emmett, Idaho, in Gem County; Request for Proposal (RFP) R12PS10006). Directions to site are West on ID-52 from Emmet; South on Tom's Cabin Rd; Next left onto West South Slope Rd; Left onto canal service road (dirt); mile to site (~43 50 N, 116 36 W). Contractors shall provide all supplies, equipment, labor, and supervision necessary for completion of the subject project. The North American Industry Classification System (NAICS) code(s) associated with this project is 335311. The small business size standard applicable to this NAICS code is 700 Employees. This procurement is being advertised as a Total Small Business Set-Aside. Offers will be accepted from all responsive and responsible Small Business concerns. Prospective contractors shall be registered in Central Contractor Registration (CCR) prior to the award of any contract. (For more information regarding registering in CCR, please visit www.ccr.gov.). This acquisition will be conducted using FAR Part 15 procedures. This solicitation shall consist of two schedules; Schedule A - Supply and Schedule B - Optional Schedule - Construction (Funds Permitting). The order of magnitude for Schedule A - Supply is $350,000. The order of magnitude for Schedule B - Optional Schedule is $450,000. The principal components of the work to be performed include:A. Remove existing concrete transformer base and construct new concrete transformer base.B. Remove and replace switchyard chain link fence.C. Excavate, install, and backfill geomembrane oil spill containment system.D. 69-kV Switchyard electrical work:1. Remove and dispose existing 67-kV, 2.5 MVA, oil-filled power transformer.2. Furnish and install new 67-kV, 1.5 MVA, oil-filled power transformer.3. Remove and dispose existing switchyard ground mat.4. Furnish and install new switchyard ground mat.5. Remove and dispose existing jumper and rigid bus.6. Furnish and install new jumper and rigid bus.7. Furnish and install new potential transformers.8. Remove and dispose existing potential transformers.9. Furnish and install new control cabling (in conduit, buried) from switchyard toplant.E. Pumping plant electrical work:1. Furnish and install new protective relay and associated equipment. Contractors shall note that this procurement will be issued APPROXIMATELY December 6, 2011. When the solicitation is issued it will be available electronically via a link from the Federal Business Opportunities Website (www.fbo.gov). The link will connect to the Department of Interior's National Business Center website (http://ideasec.nbc.gov ), on this website Contractors will need to click on the "clauses and attachments" link in order to access the Solicitation (the link is in a blue box on the left side of the webpage). Direct inquiries to Susanne Ignatchik by e-mail at: signatchik@usbr.gov, or by phone to 208-378-5093.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Susanne Ignatchik Contract Specialist 2083785039 signatchik@usbr.gov; Point of Contact above, or if none listed, contact the IDEAS EC HELP DESK for assistance
Documents
No documents available.
Lifecycle
Solicitation:
R12PS10006- Pre-Solicitation
- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- 3×Pre-SolicitationNov 21, 2011
Black Canyon Irrigation District Pumping Plant and Switchyard_Transformer Replacement
- SolicitationCurrentFeb 9, 2012
Black Canyon Irrigation District Pumping Plant and Switchyard_Transformer Replacement
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
| - | Combined Synopsis | 11/23/2026 | |
GRTE 237343 - "Rehabilitate 4 Lazy F Ranch Cabins for Employee Housing" UPDATE: See AM 003 for NPS responses to RFI's received. This solicitation is being issued as a Total Small Business Set Aside. Please see the attached solicitation package for details regarding this construction project at Grand Teton National Park. Please contact only the Contracting Officer at anthony_jasper@ios.doi.gov if you have questions pertaining to this project. Thank you for your interest in working with the National Park Service. | - | Solicitation | 11/20/2026 |
The National Park Service (NPS) at Channel Islands National Park (CHIS) has a requirement for janitorial services. The project is located at Channel Islands National Park, Ventura County, CA at the Visitor¿s Center and Headquarters Administrative Office. | - | Solicitation | 11/20/2026 |
The purpose of Amendment 01 is to add attachment 2a Specifications REVISED and attachment 4 Provisions and Clauses REVISED. The National Park Service (NPS) at Lassen Volcanic National Park (LAVO) has a requirement for supply and delivery of fuel. The project is located at Lassen Volcanic National Park, Tehama and Plumas Counties, CA. | - | Solicitation | 11/16/2026 |
Portable Toilet Services - ZION National Park | - | Solicitation | 12/10/2026 |
Additional Details
Solicitation Number
R12PS10006
Archive Date
Nov 20, 2012