GovChime
Notice ID: ffef43b6b188b52bc618ebb9d23dad60Solicitation

AAMODT HYDROLOGICAL MODELINGUpper Rio Grande Water Operations Model (URGWOM Planning Model Update and Model Runs)

Archived on April 15, 2014. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
7:00 AM UTC+02:00
Posted
June 10, 2013
Notice type
Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Agency
Department of the InteriorBUREAU OF RECLAMATION

Notice details

Office
DENVER FED CENTER
Place of performance
Pojoaque Basin, New Mexico 87501 USA
PSC
B: SPECIAL STUDIES/ANALYSIS, NOT R&D
Last updated
Dec 5, 2025

Identifiers

Solicitation number
R13PS43031
Notice ID
ffef43b6b188b52bc618ebb9d23dad60

Description

The Claims Resolution Act of 2010 (P.L. 111-291, 124 stat. 3064) was signed into law on December 8, 2010. Title VI of the Claims Resolution Act authorizes the Aamodt Litigation Settlement Project which includes: (1) the Aamodt Settlement Agreement; (2) construction of the Pojoaque Basin Regional Water System (RWS); (3) acquisition of water rights by the United States to be held in trust for the Pueblos of Nambe, Pojoaque, San Ildefonso and Tesuque (four pueblos); and (4) establishment of the Aamodt Settlement Pueblos' Fund. The Act directs the Secretary of the Interior to enter into a contract with the four pueblos for 1,079 acre-feet of San Juan-Chama Project (SJ-CP) water. This water will become part of the supply for the RWS. Reclamation has a requirement to evaluate the amount of SJ-CP water needed on a long-term basis to offset evaporation losses from the 1200 surface acre Cochiti Reservoir Recreation Pool, as part of the implementation of the Aamodt Litigation Settlement Project. This requirement includes updating the riverware-based planning version of the Upper Rio Grande Water Operations Model (URGWOM); analysis of evaporative losses under various hydrological and operational scenarios; report preparation and presentation of results to Reclamation and its stakeholders, including a discussion of the assumptions, results, and technical methodology used for the evaluation. More specifically, the Contractor shall update URGWOM with new, government-furnished, elevation-area-capacity tables and sediment parameters for Cochiti Reservoir and then use the updated model to evaluate the amount of SJ-CP water needed to offset evaporation losses from the 1200 surface acre recreation pool at Cochiti Reservoir as described in the Performance Based Statement of Work. Reclamation's stakeholders for this work include: The New Mexico Office of the State Engineer, New Mexico Interstate Stream Commission, the United States Army Corps of Engineers, and all current SJ-CP contract holders. This is a Total Small Business Set-Aside and the Bureau of Reclamation intends to issue a Request for Proposal for this project. It is anticipated the contract will be a firm fixed price contract using procedures prescribed by FAR Part 15 - Contracting by Negotiation. The North American Industry Classification System (NAICS) Code is 541690 with a Size Standard of $14 million. All responsible small business sources may submit a proposal which will be considered by the agency. An electronic copy of the solicitation will be available within the next month at www.fbo.gov. Once logged into the "fedbizopps" website, type in the Solicitation Number "R13PS43031" in the Keyword/Solicitation # field. You can also find an electronic copy of the solicitation at http://ideas.nbc.gov. Prospective vendors must be registered in the System for Award Management (SAM) prior to award of the contract. Information may be obtained on the SAM website: http://www.sam.gov.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Claire Roberson Contract Specialist 5054623581 croberson@usbr.gov; Point of Contact above, or if none listed, contact the IDEAS EC HELP DESK for assistance

Documents

No documents available.

Lifecycle

Solicitation:R13PS43031
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. 4×
    Pre-SolicitationApr 15, 2013

    AAMODT HYDROLOGICAL MODELINGUpper Rio Grande Water Operations Model (URGWOM Planning Model Update and Model Runs)

    Notice bf42770f80f57f5d3fbebf4f385bf40d on SAM.gov

  2. SolicitationCurrentJun 10, 2013

    AAMODT HYDROLOGICAL MODELINGUpper Rio Grande Water Operations Model (URGWOM Planning Model Update and Model Runs)

    Notice ffef43b6b188b52bc618ebb9d23dad60 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

R13PS43031

Archive Date

Apr 15, 2014