Notice ID: 4162645c5d44b1db006ce56ba091f949Award NoticeAwarded
Battle Creek HFM Safety and Facility Access Improvements
Awarded on April 10, 2015. Full description on SAM.gov.
Awarded tounder R15PC00050 (source: SAM.gov award notice)• $539.6K
Overview
- Posted
- April 13, 2015
- Notice type
- Award Notice
- NAICS
- 237990: Other Heavy and Civil Engineering Construction
- Agency
- Department of the InteriorBUREAU OF RECLAMATION
Notice details
- Office
- DENVER FED CENTER
- Place of performance
- Work is located within 6 miles of Manton, California, in Tehama County., Manton, 96059
- PSC
- Y: CONSTRUCT OF STRUCTURES/FACILITIES
- Last updated
- Dec 5, 2025
- Award date
- Apr 10, 2015
- Award amount (SAM.gov award notice)
- $539.6K
Identifiers
- Solicitation number
- R15PS00041
- Notice ID
- 4162645c5d44b1db006ce56ba091f949
- Award number (PIID)
- R15PC00050
Description
A. Title: Safety and Facility Access Improvements B. Work Site Location: Work is located within 6 miles of Manton, California, in Tehama County. C. Site Visit Information: Site visit information is located in the solicitation in Section L, Clause 52.236-27. D. Estimated Price Range: $500,000.00 to $1,000,000.00 E. Set-aside Information: This requirement is reserved for Service Disabled Veteran Owned Small Business concerns, in accordance with Federal Acquisition Regulation (FAR) Section 19.1405.
Award Overview
Award Number
R15PC00050
Award Amount (SAM.gov award notice)
$539.6K
Award Date
Apr 10, 2015
Awardee
Awardee UEI
CL2TQSH1QRL5
Original Solicitation
Notice ID: 4162645c5d44b1db006ce56ba091f949
Posted Date: Apr 13, 2015
Original Response Deadline: Not specified
Contract Details
Contract data not yet available
Contract details typically appear within 2-4 weeks after award; DoD awards are published about 90 days after signature.
Contacts
Contracting Officer
Primary Contact
Documents
No documents available.
Lifecycle
Solicitation:
R15PS00041- Pre-Solicitation
- Combined Synopsis
- Awarded
This opportunity has been awarded.
- Pre-SolicitationNov 12, 2014
Battle Creek HFM Safety and Facility Access Improvements
- 11×Combined SynopsisDec 5, 2014
Y--Battle Creek Safety and Facility Access Improvements
- AwardedCurrentApr 13, 2015
Battle Creek HFM Safety and Facility Access Improvements
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
DK Heart Butte Dam Safety Modification PRE - SOLICITATION NOTICE 140R6026R0004 The Bureau of Reclamation (hereinafter referred to as Reclamation) Missouri Basin Regional Office intends to solicit a Request for Proposals (RFP) on or around April 10, 2026, as described in this Pre-Solicitation Notice. The RFP will be issued via the Sam.Gov web page at https://sam.gov Reclamation Dakotas Area Office (DKAO) has a need for a comprehensive suite of civil, geotechnical, and structural construction activities designed to enhance the long-term safety, stability, and performance of the Heart Butte dam infrastructure as described below. The solicitation will be issued under full and open competition. In accordance with FAR 15.201 Exchanges with Industry Before Receipt of Proposals, the Reclamation Missouri Basin Regional Office previously hosted an Industry Day Event for the Heart Butte Dam Safety of Dams Modification project located near Elgin, North Dakota. Please see special notice number DOIRFB0240024 on sam.gov for additional information regarding the industry day previously held in relation to this pre-solicitation notice. This procurement will utilize Far Part 15 procedures. The government intends to award a Firm Fixed Price purchase order to one contractor to accomplish this scope of work. Heart Butte Dam Safety Modification (HBSDM) Project Scope of Work The scope of work includes, but is not limited to, the following major components: 1. Dewatering and Unwatering Systems Design, installation, operation, and maintenance of temporary dewatering and unwatering systems to facilitate dry working conditions within the outlet works and adjacent excavation zones. Systems shall be capable of managing both surface water and groundwater inflows throughout all phases of construction. 2. Cofferdam Works Engineering design, construction, and subsequent removal of temporary cofferdams to isolate work areas from reservoir and tailwater influences. Cofferdams shall meet all applicable safety and hydraulic performance criteria and be coordinated with dewatering operations. 3. Foundation Void Remediation Injection grouting to fill and stabilize voids or discontinuities within the foundation materials, accessed from within the outlet works conduit. Grouting operations shall be performed using low-mobility or chemical grout, as specified, to ensure compatibility with existing geologic conditions. 4. Outlet Works Conduit Rehabilitation Selective demolition of deteriorated concrete sections using saw cutting and hydro-demolition techniques. Installation of temporary structural shoring to support conduit integrity during repair operations. Reinforcement repair and reconstruction of the conduit to restore structural capacity and hydraulic performance. 5. Jet Grouting Operations Execution of jet grouting from both interior and exterior access points of the outlet works conduit to improve ground strength and reduce permeability. Grouting shall be performed in accordance with engineered patterns and quality control protocols to ensure uniform treatment. 6. Embankment Excavation Controlled excavation of designated portions of the existing dam embankment to facilitate installation of new filter and drainage systems. Excavation shall be staged and supported to maintain embankment stability and minimize risk to existing structures. 7. Filter and Drainage System Construction Construction of a new sand filter trench to intercept and manage seepage flows. Installation of a zoned filter and drain system, including sand filter layers, gravel drainage zones, and protective berms, designed to meet modern dam safety standards. 8. Toe Drain System Installation Placement of high-density polyethylene (HDPE) toe-drain piping systems, including associated observation wells and cleanouts, to enhance seepage monitoring and control. All components shall be installed to specified grades and alignments to ensure long-term functionality. 9. Earth Retaining Structures Furnishing and installation of pre-fabricated earth retaining wall systems to support excavation faces and permanent embankment features. Retaining walls shall be designed for site-specific loading conditions and integrated with adjacent structures. 10. Outlet Conduit Joint Sealing Application of chemical grouting techniques to seal joints within the outlet works conduit, preventing internal leakage and mitigating potential piping pathways. Please see Attachment #1 (00 00 01_Specifications_2.23.26) for a copy of the current Reclamation specifications for more information. The government intends to award a Firm Fixed Price contract for the forthcoming solicitation with discussions. The government is seeking a waiver from the requirements for the implementation of a Project Labor Agreement (PLA). Working hours are anticipated to be 24 hours a day for 6 days a week. The government is requesting responses to this pre-solicitation announcement no later than March 31, 2026 at 1700MT. Please send all correspondence related to this pre-solicitation announcement to Mitchell Frost at mfrost@usbr.gov. It is incumbent upon contractors to monitor the Sam.Gov for RFP release and all subsequent amendments, if applicable. Effective October 26, 2018, all contractors interested in doing business with the Federal Government must be registered in the System for Award Management (SAM) database when submitting an offer or quotation. Note: Registering in ¿SAM¿ does not constitute an automatic award of any contract or agreement to the registering contractor. SAM is centralized database for consolidating the Central Contractor Registration (CCR), the online Representation and Certifications Application (ORCA), and the Excluded Parties List System (EPLS). Additionally, the contractors Unique Entity Identifier (UEI) is required for the SAM registration and annual confirmation requirements must be accomplished through the SAM website at https://www.sam.gov. For assistance with registering in SAM, contact the Federal Services Desk at 1-866-606-8220. Training videos are also available on the SAM.gov website under Learning Center; to help users understand the features and functionality of the site. Payment Requests for the anticipated contract must be submitted electronically through the U.S. Department of the Treasury's Internet Payment Platform (IPP) system. The IPP website is located at https://www.ipp.gov. The contractor must use the IPP website to register access and submit requests for payment. Contractors may obtain assistance by contacting the IPP Production Helpdesk via e-mail ippgroup@bos.frb.org or phone 1-866-973-3131. If the contractor is unable to comply with the requirements to use IPP for invoice submission, the contractor must submit a waiver request in writing to the Contracting Officer with its proposal. The estimated price of this construction effort is more than $10,000,000. This pre-solicitation notice is not a RFP and does not in any way authorize vendors to incur costs on behalf of the Government. | 65% | Pre-Solicitation | 03/31/2026 |
Heart Butte Dam Modification Sources Sought Notice December 18, 2025 This announcement is being used for market research and advanced planning purposes. Proposals are not requested and will not be accepted from this Sources Sought Notice. THIS IS NOT A SOLICITATION FOR PROPOSALS AND A CONTRACT WILL NOT BE AWARDED AS A RESULT OF THIS NOTICE. In accordance with FAR 15.201 Exchanges with Industry Before Receipt of Proposals, the United States Bureau of Reclamation (Reclamation), Missouri Basin Regional Office, previously hosted an Industry Day Event for the Heart Butte Dam Safety of Dams Modification (HBSDM) project located near Elgin, North Dakota. Please see special notice number DOIRFB0240024 on sam.gov for additional information regarding the industry day previously held in relation to this Sources Sought notice. Heart Butte Dam Safety Modification (HBSDM) Project ¿ Scope of Work The Heart Butte Dam Safety Modification project encompasses a comprehensive suite of civil, geotechnical, and structural construction activities designed to enhance the long-term safety, stability, and performance of the dam infrastructure. The scope of work includes, but is not limited to, the following major components: 1. Dewatering and Unwatering Systems ¿ Design, installation, operation, and maintenance of temporary dewatering and unwatering systems to facilitate dry working conditions within the outlet works and adjacent excavation zones. ¿ Systems shall be capable of managing both surface water and groundwater inflows throughout all phases of construction. 2. Cofferdam Works ¿ Engineering design, construction, and subsequent removal of temporary cofferdams to isolate work areas from reservoir and tailwater influences. ¿ Cofferdams shall meet all applicable safety and hydraulic performance criteria and be coordinated with dewatering operations. 3. Foundation Void Remediation ¿ Injection grouting to fill and stabilize voids or discontinuities within the foundation materials, accessed from within the outlet works conduit. ¿ Grouting operations shall be performed using low-mobility or chemical grout, as specified, to ensure compatibility with existing geologic conditions. 4. Outlet Works Conduit Rehabilitation ¿ Selective demolition of deteriorated concrete sections using saw cutting and hydro-demolition techniques. ¿ Installation of temporary structural shoring to support conduit integrity during repair operations. ¿ Reinforcement repair and reconstruction of the conduit to restore structural capacity and hydraulic performance. 5. Jet Grouting Operations ¿ Execution of jet grouting from both interior and exterior access points of the outlet works conduit to improve ground strength and reduce permeability. ¿ Grouting shall be performed in accordance with engineered patterns and quality control protocols to ensure uniform treatment. 6. Embankment Excavation ¿ Controlled excavation of designated portions of the existing dam embankment to facilitate installation of new filter and drainage systems. ¿ Excavation shall be staged and supported to maintain embankment stability and minimize risk to existing structures. 7. Filter and Drainage System Construction ¿ Construction of a new sand filter trench to intercept and manage seepage flows. ¿ Installation of a zoned filter and drain system, including sand filter layers, gravel drainage zones, and protective berms, designed to meet modern dam safety standards. 8. Toe Drain System Installation ¿ Placement of high-density polyethylene (HDPE) toe-drain piping systems, including associated observation wells and cleanouts, to enhance seepage monitoring and control. ¿ All components shall be installed to specified grades and alignments to ensure long-term functionality. 9. Earth Retaining Structures ¿ Furnishing and installation of pre-fabricated earth retaining wall systems to support excavation faces and permanent embankment features. ¿ Retaining walls shall be designed for site-specific loading conditions and integrated with adjacent structures. 10. Outlet Conduit Joint Sealing ¿ Application of chemical grouting techniques to seal joints within the outlet works conduit, preventing internal leakage and mitigating potential piping pathways. This scope of work is intended to address critical dam safety concerns through a combination of structural rehabilitation, seepage control, and foundation improvement measures. All work shall be executed in accordance with applicable federal, state, and local regulations, as well as project-specific technical specifications and quality assurance requirements. The government intends on awarding a Firm Fixed Price contract with a period of performance of approximately December 31, 2026, to June 30, 2030, or 1,277 calendar days. The Government is seeking interest from large businesses, 8(a) and small businesses, small-disadvantaged businesses, woman-owned small businesses, HubZone small businesses and/or service-disabled veteran owned small business concerns who have the specialized knowledge, experience, and resources necessary to successfully complete a project of this size, scope, and complexity. The NAICS Code for this project is 237990 Other Heavy and Civil Engineering Construction with a business size standard of $45.0 million. The Government will not reimburse any costs associated with responding to this Sources Sought Notice. This notice shall not be construed as a commitment by the Government to issue a solicitation or ultimately award a contract, nor does it restrict the Government to a particular acquisition approach. The Government will not be bound by this information if a solicitation is issued. Responses to this Sources Sought notice may include capability statements, past performance information, and any additional details that respondents believe demonstrate their company's capacity to undertake the size, scope, complexity, and magnitude of this effort. All responses should be submitted to Contracting Officer Mitchell Frost at mfrost@usbr.gov by 1700 EST on January 4, 2026. | 65% | Market Research | 01/04/2026 |
Install new Fish Screen, Sheet Pile Wall, Pipeline, Access Road, Butterfly Valves, and Modify Pumping Plant Discharge and Electrical Systems. Please email Charlesetta Seibure and Stephanie Lindner at charlesetta_seibure@ios.doi.gov and stephanie_lindner@ios.doi.gov to request copies of the draft specifications and drawings. | 58% | Market Research | 11/18/2026 |
The California Great Basin Region of the Bureau of Reclamation intends to issue an Invitation for Bid (IFB) for a firm fixed-price construction contract for Folsom Dam Vessel Exclusion Barrier and Debris Boom. This procurement will be advertised as a Total Small Business set aside. Solicitation will be issued as an Invitation for Bid (IFB) using FAR Part 14, Sealed Bidding procedures. The work to be performed is described below. The applicable North American Industry Classification System (NAICS) Code is 237990 and the related small business size standard is $45M. This notice is not a request for proposal and the information presented in this announcement will not obligate the Bureau of Reclamation in any manner. All responsible sources may submit a bid which will be considered by the agency. The estimated cost of this project is between $5 Million and $10 Million. This procurement will require 100% performance and payment bonds. The work is located at U.S. Bureau of Reclamation, Folsom, California. PRINCIPAL COMPONENTS OF WORK: • Remove and salvage part of the existing barrier on the Folsom dam as shown on the contract drawings. • Design, furnish and install a new vessel exclusion barrier and debris curtain and its components listed on this specification. • Furnish and install onshore anchor on the right-wing side of the dam. • Removal of obstruction along the path of the barrier to the onshore anchor and filling the large gaps on the existing riprap with smaller rocks on the right wing dam. • Furnish and install necessary warning lights and signage. • Design, furnish and installation of necessary anchors, clump anchors, buoys and moorings. • Provide certification of the new barrier according to the requirements set forth on this specification. • Provide one (1) spare module and two (2) spare module-to-module connectors and the required hardware for use. One or more of the items under this acquisition is subject to the World Trade Organization Government Procurement Agreement and Free Trade Agreements. Solicitation 140R2026B0001 will be posted electronically via www.sam.gov on or about June 29, 2026. The date for receipt of offers will be approximately July 30, 2026. The solicitation must be downloaded at the above website; no paper copy of this solicitation will be distributed. Prospective contractors MUST be actively registered in the System for Award Management (SAM) database at http://www.sam.gov to be eligible for award. Questions concerning this solicitation should be directed to Rosana Yousef Goarji via email at rosana_yousefgoarji@ios.doi.gov . Construction Contraction Administration: Revolutionary Federal Acquisition Regulation Overhaul (RFO) 36.101-4 requires agencies provide description of policies and procedures that apply to definitization of equitable adjustments for change orders under construction contracts and data on the time required to definitize equitable adjustments for change orders under construction contracts. This information can be found at: https://www.doi.gov/pam/acquisition/policy/constructioncontract. | 58% | Pre-Solicitation | Open |
This announcement constitutes a Special Notice. This announcement seeks information from industry and will only be used for preliminary planning purposes. THIS IS NOT A SOLICITATION FOR PROPOSALS AND NO CONTRACT SHALL BE AWARDED FROM THIS SPECIAL NOTICE. Respondents will not be notified of the results of the evaluation. This is a SAVE-THE-DATE special notice for an industry day event on 18 November 2026 at 9:00AM EST. All interested Offerors are required to access SAM.gov for future updates. Please view registration information and details below. The presentation slides and list of attendees will be made available and posted to the subject special notice on SAM.gov after the conclusion of the event. The U.S. Army Corps of Engineers, Jacksonville District will be holding an Industry Day event to gauge the interest, capabilities, and qualifications of various members of the Construction Community, to include Small Businesses, and to also provide information and obtain feedback from interested Offerors prior to issuance of the official solicitation. This requirement is for fiscal year (FY) 2028 award. NAICS Code 237990: Other Heavy and Civil Engineering Construction Small Business Standard: $37 million Magnitude of Construction: $100 - $500 million Project Title: Tampa Harbor Improvements Industry Day. Purpose: The purpose of this scheduled Industry Day is to provide the latest information regarding the future advertisement and award of Contract 1 for the Tampa Harbor Deepening Project. The scheduled event will include a detailed presentation by the Jacksonville District US Army Corps of Engineers, Tampa Harbor Project Delivery Team (PDT) followed by open Q&A and 1-1 meeting opportunities with contracts to ask more in-depth questions and get feedback as the design and permitting moves forward. Project Description: The project includes construction dredging to deepen and widen specified areas within the federal navigation channel of Tampa Harbor. The project is planned for six (6) contracts over an estimated 8–10-year period. The Scope of Work for this Industry Day will be focused on Contract 1. Contract 1 work includes deepening of Cut-C (HB), Port Sutton Channel, Port Sutton Turning Basin, East Bay Channel and Cut-D (HB) to a depth of 49 feet MLLW, deepening the Port Sutton Terminal Channel to a depth of 44 feet MLLW, and deepening the East Bay Channel Extensions 1 and 2 to a depth of 41 feet MLLW. The Contract 1 work also includes widening of Port Sutton Channel, Port Sutton Turning Basin, and East Bay Channel. All areas of deepening and widening will incorporate +1 foot of allowable overdepth. All dredged material from the project will be disposed of in the East Bay Placement Area, DMMA 2-D and DMMA 3-D. Estimated quantities to be dredged are roughly 4.4 million cubic yards. Link to the Tampa Harbor Improvements USACE website: https://www.saj.usace.army.mil/Tampa-Harbor/-30-/ Requests for Information: Industry is asked to consider the following questions and provide input at the Industry Day: 1. Company/Contractor name, address, point of contact, phone number and e-mail address. 2. Does the Contractor plan to submit a proposal for this contract? 3. Describe the proposed construction methods and sequencing and equipment needed to complete the project. At a minimum, address pre-dredging, side-casting of pre-dredging material, and placement into the East Bay Placement Area including constructing the containment perimeter and filling within the area. The contract will include geologic data of the dredge and placement areas as well as the geotechnical requirements for materials considered suitable for constructing the containment perimeter. The contractor will propose the dredging sequence to accomplish constructing the containment perimeter that meets required geotechnical specifications. Describe the factors considered in determining the dredging sequence, such as the material type, proposed equipment, proximity to the placement area, etc.? 4. Describe any constructability, stability, safety concerns with East Bay Placement Area. Describe additional equipment or methods required to place infill above water and/or above the proposed crest of the containment perimeter. Describe any concerns for drainage of the placement area. 5. Describe how filling the East Bay Placement Area will not result in material migrating out of the placement area and into the federal channel. At a minimum, address how existing soft material at the placement area will be contained when disturbed. 6. Will the proposed East Bay Placement Area construction methods require equipment to be located within the federal channel for extended periods of time acting as obstructions for vessel traffic, or obstruct Port Tampa Bay Berth 150? 7. For East Bay Placement Area, describe any temporal facilities, staging and laydown areas, and utilities that would be required or preferred in adjacent upland areas. 8. Dredging and placement of material will be conducted in a manner to minimize turbidity. Describe the turbidity control measures, such as turbidity curtains, that would be incorporated into the proposed construction methodology. If hydraulic placement of infill is proposed for the East Bay Placement Area, describe how affluent will be managed. 9. Based on prior dredging construction experience either in Tampa Bay or other locations in Florida, what are some of the challenges USACE could streamline to improve contract execution? 10. Describe any concerns with execution of the environmental species monitoring and reporting. Event Date: Wednesday, 18 November 2026 at 9:00 AM EST. Event Location: Port of Tampa – Cruise Terminal 6 1331 McKay Street Tampa, Florida 33602 *Parking available onsite For more information, please see the Industry Day Agenda copy under the Attachments. Contact Info: Manny Vianzon, Project Manager (904) 232-3292 Emmanuel.A.Vianzon@usace.army.mil If you cannot attend in person: Link Meeting: https://www.microsoft.com/EN-US/MICROSOFT-TEAMS/JOIN-A-MEETING Meeting ID: 993 212 869 457 Passcode: tG6Ff3Gt Join by phone: 604-262-2433 Phone conference ID: 972 118 411# NOTES: NO REIMBURSEMENT WILL BE MADE FOR ANY COST ASSOCIATED WITH PROVIDING INFORMATION IN RESPONSE TO SAID NOTICE, ATTENDANCE AT THE VIRTUAL INDUSTRY DAY EVENT OR ANY FOLLOW-UP INFORMATION SUBSEQUENTLY REQUESTED. You must be registered with the System for Award Management (SAM) in order to receive a Government contract award. To register, go to www.sam.gov. For additional information visit the website for the Federal Service Desk (www.FSD.gov) which supports SAM or contact them at 866-606-8220 for assistance. | 55% | Special Notice | 11/18/2026 |
Additional Details
Solicitation Number
R15PS00041
Archive Date
Jul 10, 2019