Notice ID: f520332d50578d35ccfaee86a1760e38Solicitation
Cle Elum Dam Fish Passage Facility Bridge and Acce
Archived on July 10, 2019. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 11:00 PM UTC+02:00
- Posted
- June 19, 2015
- Notice type
- Solicitation
- NAICS
- 237310: Highway, Street, and Bridge Construction
- Agency
- Department of the InteriorBUREAU OF RECLAMATION
Notice details
- Office
- DENVER FED CENTER
- PSC
- Y: CONSTRUCT OF STRUCTURES/FACILITIES
- Last updated
- Dec 5, 2025
Identifiers
- Solicitation number
- R15PS00089
- Notice ID
- f520332d50578d35ccfaee86a1760e38
Description
NOTE - MANUAL REPOSTING OF PRESOL ORIGINALLY POSTED ON 4/15/2015 Bureau of Reclamation, Pacific Northwest Region, has a requirement to construct access roads and a precast, prestressed concrete bridge at Cle Elum Dam, located approximately 8 miles northwest of Cle Elum, Washington, in Kittitas County. The principal components of the work for the access roads include clearing and grubbing, tree removal, excavation and embankment, gravel surfacing, seeding, and furnishing and installing guardrail, riprap, pipe gates, fencing, and geotextile; and for the bridge: placement of drilled piers with cast-in-place concrete abutments, fabrication and installation of precast prestressed concrete bulb tee girders and concrete bridge deck, and construction of approach ramps and parapets. The estimated magnitude of this project is $5,000,000-$10,000,000. This solicitation is set-aside for small business concerns. The North American Industry Classification System (NAICS) code for this solicitation is 237310. The small business size standard applicable to this project is $36.5 million in gross annual receipts averaged over the previous three 1-year accounting periods. This is a best-value procurement, and technical factors including general technical plan, experience, past performance, and schedule will be considered in the contract award decision. Click here to see more information about this opportunity on FedConnect URL: https://www.fedconnect.net/FedConnect/
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Documents
No documents available.
Lifecycle
Solicitation:
R15PS00089- Pre-Solicitation
- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- 6×Pre-SolicitationMay 18, 2015
Cle Elum Dam Fish Passage Facility Bridge and Acce
- SolicitationCurrentJun 19, 2015
Cle Elum Dam Fish Passage Facility Bridge and Acce
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
construction, repair, and alteration services on highways, roads, streets, bridges, trails, and related transportation infrastructure within National Park Service assets Nationwide. The Department of the Interior (DOI), National Park Service (NPS), Denver Service Center (DSC), is conducting market research to identify capable Small Businesses (including SB, SDB, WOSB, EDWOSB, HUBZone, SDVOSB) with the interest and capability to perform recurring road maintenance and civil construction work under a proposed Multiple Award Task Order Contract (MATOC). This announcement is issued solely for market research and acquisition-planning purposes. This Sources Sought Notice is not a solicitation. No proposals are requested, and no award will be made from this notice. Information gathered will support the Government¿s acquisition planning and set aside determination. Responses will not be considered offers and cannot be accepted by the Government to form a binding contract or agreement. No solicitation package is currently available. Participation is strictly voluntary, and the Government will not reimburse respondents for any costs associated with preparing or submitting information, participating in discussions, or responding to follow-up questions. | - | Market Research | 11/30/2026 |
BRCA 310427 Southbound Shuttle Stop | - | Solicitation | 11/16/2026 |
Date: October 28, 2026 To: SAM Federal Business Opportunities From: Rachel Dyer, Contracting Officer, National Park Service, Denver Service Center Subject: Sources Sought Notice Reference: GRSM 321788 - Oconaluftee River Trail This is a Sources Sought Notice (SSN) for the purpose of conducting market research. Proposals are NOT being requested, nor accepted at this time. Responses are being requested from both large and small businesses. Purpose: The purpose of this notice is to gain knowledge regarding the type of interested businesses and their qualifications. The National Park Service (NPS) will use information obtained through this notice to develop an acquisition strategy. The Government anticipates conducting a competitive acquisition for this requirement. The amount of interest or lack thereof will determine the possibility of a small business or other socio-economical small business set-aside for the solicitation. Analysis of the quality of responses to this source sought announcement will be considered in the market research being conducted, and in the making of any small business set-aside determination for this requirement. Additional Information: No proposal package, solicitation, specification or drawings are available with this notice. Cost Reimbursement: Response to this announcement is strictly voluntary; no reimbursement will be made for any costs associated with providing information in response to this sources sought announcement or any follow-up information requests. North American Industry Classification System (NAICS) code: 237310 Small Business Size Standard: $45,000,000.00 Solicitation: The NPS anticipates issuing a request for proposals in the Spring 2027. Bonding: The NPS anticipates bid, performance and payment bonds will be required. Project Description: The National Park Service (NPS) proposes to improve the multi-use Oconaluftee River Trail, that links the gateway community of Cherokee to Great Smoky Mountains National Park. The Oconaluftee River Trail is approximately 8,400 feet, or 1.6 miles, in length and extends from the Oconaluftee Visitor Center to the park boundary with Cherokee, North Carolina. The project corridor is within and/or adjacent to sensitive natural and cultural resources. Preventing or limiting disturbance to and respecting these resources is of high importance to the park. The scope of the work includes, but is not limited to, the following: ¿ Cutting and removal of between 250 to 300 hundred mixed hardwood trees of varying size. Trees can only be felled between November 16 through March 31 of any calendar year. ¿ Widening the trail to approximately 8¿ in width, adding new aggregate subgrade and paving approximately 8,200 feet of trail with bituminous concrete pavement. ¿ Construction of a new single span steel pedestrian bridge approximately 60 feet in length and 10 feet in clear width, including new stone-faced abutments. ¿ Construction of a new integrally colored concrete multi-use recreational plaza approximately 2800 SF in area, including the construction of stone seating walls and wooden benches. ¿ Construction of approximately 200 linear feet of riverbank erosion utilizing locally harvested vegetation to create a bioengineered fill structure. ¿ Construction of a new "spur" trail to connect the Oconaluftee River Trail to the Saunooke Bridge located on the Big Cove Connector Road. This trail consists primarily of earth cuts and fills and is approximately 250 feet in length. Submittal Contents: Interested (small and large) businesses should submit the following information: (1) Company name, UEI number, address, point of contact, telephone number, and email address. (2) Business type: Classification as a Large or Small Business under the above listed NAICS, Small Business Administration (SBA) certified Historically Underutilized Business Zone (HUBZone), Veteran-Owned Small Businesses (VOSB), Service-Disabled Veteran-Owned Small Businesses (SDVOSB), SBA certified Woman Owned Small Business (WOSB), Economically Disadvantaged Woman Owned Small Business (EDWOSB). The size of a small business firm includes all parents, subsidiaries, affiliates, etc.¿see 13 CFR 121.108.) Misrepresentation of size status can result in penalties. (3) Statement regarding your company¿s bonding capacity. Letters from bonding companies are not required at this time. (4) Information demonstrating experience and capability on projects of same or similar size, scope and magnitude, and constructed under similar conditions. (5) In addition businesses may submit existing marketing materials such as capability statements and brochures. (6) UEI Number Only Submittal Due Date/Time: Thursday, November 12, 2026 no later than 9:00am Mountain Time Submit To: Rachel_dyer@ios.doi.gov | - | Market Research | 11/12/2026 |
YELL 338223 - Bridge Preservation | - | Solicitation | 11/06/2026 |
GOGA 336173 - Repair Conzelman Road | - | Solicitation | 10/29/2026 |
Additional Details
Solicitation Number
R15PS00089
Archive Date
Jul 10, 2019