GovChime
Notice ID: 342fe9ea7b6788d24f81cc38eba425efAward NoticeAwarded

Z--Anderson Ranch Powerplant Service Station Replc.

Awarded on August 3, 2015. Full description on SAM.gov.

Awarded tounder R15PC00086 (source: SAM.gov award notice)• $1.6M

Overview

Posted
August 3, 2015
Notice type
Award Notice
NAICS
237990: Other Heavy and Civil Engineering Construction
Agency
Department of the InteriorBUREAU OF RECLAMATION

Notice details

Office
DENVER FED CENTER
Place of performance
Anderson Ranch Dam, 27 miles northeast of Mountain Home, ID in Elmore County, Idaho
PSC
Z: MAINT, REPAIR, ALTER REAL PROPERTY
Last updated
Dec 5, 2025
Award date
Aug 3, 2015
Award amount (SAM.gov award notice)
$1.6M

Identifiers

Solicitation number
R15PS00361
Notice ID
342fe9ea7b6788d24f81cc38eba425ef
Award number (PIID)
R15PC00086

Description

IGF::OT::IGF ANDERSON STATION SERVICE REPLACEMENT

Full description on SAM.gov

Award Overview

Award Number

R15PC00086

Award Amount (SAM.gov award notice)

$1.6M

Award Date

Aug 3, 2015

Awardee

Awardee UEI

J3H3D6BHT2G3

Original Solicitation

Notice ID: 342fe9ea7b6788d24f81cc38eba425ef

Posted Date: Aug 3, 2015

Original Response Deadline: Not specified

Contract Details

Contract data not yet available

Contract details typically appear within 2-4 weeks after award; DoD awards are published about 90 days after signature.

Contacts

Contracting Officer

Primary Contact

Wright, Clay

Documents

No documents available.

Lifecycle

Solicitation:R15PS00361
  1. Pre-Solicitation
  2. Solicitation
  3. Awarded

This opportunity has been awarded.

  1. 9×
    Pre-SolicitationMar 11, 2015

    Z--Anderson Ranch Powerplant Service Station Replacement

    Notice abf5f0fe0d3ab8e8c20565873f767493 on SAM.gov

  2. SolicitationMay 20, 2015

    Z--Anderson Ranch Powerplant Service Station Replacement

    Notice e679e74409ea42542432901436168f1a on SAM.gov

  3. AwardedCurrentAug 3, 2015

    Z--Anderson Ranch Powerplant Service Station Replc.

    Notice 342fe9ea7b6788d24f81cc38eba425ef on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
SOURCES SOUGHT NOTICE (SSN) Shasta Powerplant SH-PP Compressor Room Modernization Department of the Interior (DOI) Bureau of Reclamation (BOR) California–Great Basin Region, Acquisition Office – Sacramento, CA NOTICE TYPE: Sources Sought NAICS: 237990 – Other Heavy and Civil Engineering Construction Size Standard: $45M (average annual receipts) PSC: Y1AZ – Construction of Other Administrative Facilities Construction Project Magnitude: Between $1,000,000 and $2,000,000. Response Due: November 19, 2026, 5:00pm PST THIS IS NOT A SOLICITATION. ________________________________________ 1. PURPOSE OF NOTICE This Sources Sought Notice (SSN) is issued solely for market research and planning purposes in accordance with FAR Part 10. The DOI/BOR is seeking to: A. Allow interested contractors to provide feedback on the information provided. B. Identify qualified and experienced contractors capable of performing the work identified Section 2, Project Overview. C. Identify the best procurement approach based upon the information received (the bullet points below are being provided as examples): o In accordance with RFO Deviation Part 10, and the RFO Companion Guide, the Government should determine if existing agency capabilities can fulfill the need. If the agency does not already have the capability, the next phase of market research can focus on whether other existing federal contract vehicles already offer the products or services needed. For example:  DOI, Bureau of Indian Affairs (BIA), Construction Multiple Award Contract (C-MAC)  DOI, Fish and Wildlife Service (FWS) Multiple Award Task Order Contract (MATOC) o Total Small Business Set-Aside o Full and Open Competition ________________________________________ 2. PROJECT OVERVIEW The DOI/BOR is preparing for a potential procurement to completely replace all equipment in the compressor room located at the base of Shasta Dam with modern equipment. Work is located approximately 9 miles northwest of Redding, CA, in Shasta County. The anticipated construction period is 365 calendar days from Notice to Proceed. Principal Components of the Work include, but are not limited to: A. Field Verification: 1. Contractor is responsible for field verification of all existing conditions to ensure new design and components will fit in existing space and function properly. B. Protection of Existing Installations and Temp Air Systems 1. Provide protection for personnel and existing facilities from harm due to Contractor's operations. Protection shall be subject to approval of Government. 2. Contractors shall not operate existing in-use equipment. 3. Arrange protective installations to permit operation of existing equipment and facilities by Government while work is in progress. 4. Do not discharge anything but clear water into building drainage system. 5. Prevent dust from entering ventilating systems. 6. Remove protective installations after purpose has been served. Materials furnished by Contractor to provide protection remain property of Contractor. 7. Repair, at Contractor's expense, damage to existing installations due to Contractor's operations or Contractor's failure to provide proper protection. At Government's option, damage may be repaired by Government, and Contractor will be back charged repair costs. 8. Contractor shall not disturb any asbestos containing materials. Where asbestos containing materials are disturbed for any reason, ________________________________________ 3. ESTIMATED PROCUREMENT SCHEDULE The dates provided below are preliminary and intended to assist contractors with planning. The Government reserves the right to modify these dates at its discretion as circumstances require. Activity Date Issue Pre-Solicitation Notice (if applicable) January 5, 2027 Issue Solicitation January 20, 2027 Quotes/Proposals Due March 1, 2027 Award March 30, 2027 ________________________________________ 4. SYSTEM FOR AWARD MANAGEMENT (SAM) In accordance with RFO Deviation Part 4.203-1(b), “Offerors or quoters are required to have an active Federal Government contracts registration in SAM when they submit an offer or quotation, and at the time of award.” Registration information is available at: http://www.sam.gov. ________________________________________ 5. SOURCES SOUGHT RESPONSE REQUIREMENTS Interested Contractors are requested to provide the following information: A. Business Information 1. Company name and address 2. Cage Code and Unique Entity Identifier (UEI) 3. Business size under NAICS 237990 (verified via SAM.gov) 4. Socioeconomic status, if applicable (SB, WOSB, SDVOSB, HUBZone, etc.) B. Capability & Intent 1. A clear statement of interest and intent to submit a proposal as a prime contractor for any forthcoming solicitation. 2. A brief description of your companies capability to perform similar work. 3. A concise description of the qualifications, capabilities, experience, or other distinguishing factors that differentiate your company from other prospective contractors. C. Relevant Past Performance 1. Provide up to three (3) relevant projects performed within the last five (5) years that demonstrate capability to perform work of similar type, scale, and complexity. For each project, include: • Project title and contract number • Summary of scope and technical approach • Contract Amount at Award • Contract Amount at Contract Close-out • Number of Modifications • Period of performance • Customer/agency • Point of contact (name, email, phone) • Identification of your role: prime, subcontractor, or partner • Key subcontractors or collaborators involved NOTE: The Government intends to use the information received in response to this Sources Sought Notice to assess the level of industry interest, the availability of qualified and capable contractors, and the likelihood of receiving adequate competition for this requirement. Contractor responses (or an insufficient number of responses) may directly influence the Government’s acquisition strategy, including (but not limited to) whether to compete the requirement under an existing IDIQ or MATOC, pursue a total or partial small-business set-aside or other socioeconomic program, or conduct a full and open competition. Accordingly, interested contractors are strongly encouraged to provide complete and accurate responses addressing all requested information, including capability, relevant experience, business size and socioeconomic status, and intent to compete. ________________________________________ 6. REQUEST FOR INFORMATION (RFI) – INDUSTRY FEEDBACK To assist in developing a procurement approach, the Government is giving Contractors the opportunity to provide feedback. Respondents may provide comments, recommendations, questions, or redlines. The Government may incorporate feedback and/or respond to questions at its discretion. ________________________________________ 7. RESPONSE INSTRUCTIONS Responses shall be submitted via email to: - Rosana Yousef Goarji (rosana_yousefgoarji@ios.doi.gov) ________________________________________ 8. DISCLAIMER This announcement is not a solicitation and is issued solely for information and planning purposes. The Government will not reimburse respondents for any information or administrative costs incurred in responding to this SSN. The Government is under no obligation to issue a solicitation or award based on this notice. No proprietary, classified, confidential, or sensitive information should be included in responses.
69%
Market Research11/19/2026
Cableway Crane Refurbishment - Hoover Dam
56%
Solicitation12/18/2026
The California Great Basin Region of the Bureau of Reclamation intends to issue an Invitation for Bid (IFB) for a firm fixed-price construction contract for Folsom Dam Vessel Exclusion Barrier and Debris Boom. This procurement will be advertised as a Total Small Business set aside. Solicitation will be issued as an Invitation for Bid (IFB) using FAR Part 14, Sealed Bidding procedures. The work to be performed is described below. The applicable North American Industry Classification System (NAICS) Code is 237990 and the related small business size standard is $45M. This notice is not a request for proposal and the information presented in this announcement will not obligate the Bureau of Reclamation in any manner. All responsible sources may submit a bid which will be considered by the agency. The estimated cost of this project is between $5 Million and $10 Million. This procurement will require 100% performance and payment bonds. The work is located at U.S. Bureau of Reclamation, Folsom, California. PRINCIPAL COMPONENTS OF WORK: • Remove and salvage part of the existing barrier on the Folsom dam as shown on the contract drawings. • Design, furnish and install a new vessel exclusion barrier and debris curtain and its components listed on this specification. • Furnish and install onshore anchor on the right-wing side of the dam. • Removal of obstruction along the path of the barrier to the onshore anchor and filling the large gaps on the existing riprap with smaller rocks on the right wing dam. • Furnish and install necessary warning lights and signage. • Design, furnish and installation of necessary anchors, clump anchors, buoys and moorings. • Provide certification of the new barrier according to the requirements set forth on this specification. • Provide one (1) spare module and two (2) spare module-to-module connectors and the required hardware for use. One or more of the items under this acquisition is subject to the World Trade Organization Government Procurement Agreement and Free Trade Agreements. Solicitation 140R2026B0001 will be posted electronically via www.sam.gov on or about June 29, 2026. The date for receipt of offers will be approximately July 30, 2026. The solicitation must be downloaded at the above website; no paper copy of this solicitation will be distributed. Prospective contractors MUST be actively registered in the System for Award Management (SAM) database at http://www.sam.gov to be eligible for award. Questions concerning this solicitation should be directed to Rosana Yousef Goarji via email at rosana_yousefgoarji@ios.doi.gov . Construction Contraction Administration: Revolutionary Federal Acquisition Regulation Overhaul (RFO) 36.101-4 requires agencies provide description of policies and procedures that apply to definitization of equitable adjustments for change orders under construction contracts and data on the time required to definitize equitable adjustments for change orders under construction contracts. This information can be found at: https://www.doi.gov/pam/acquisition/policy/constructioncontract.
56%
Pre-SolicitationOpen
DK Heart Butte Dam Safety Modification PRE - SOLICITATION NOTICE 140R6026R0004 The Bureau of Reclamation (hereinafter referred to as Reclamation) Missouri Basin Regional Office intends to solicit a Request for Proposals (RFP) on or around April 10, 2026, as described in this Pre-Solicitation Notice. The RFP will be issued via the Sam.Gov web page at https://sam.gov Reclamation Dakotas Area Office (DKAO) has a need for a comprehensive suite of civil, geotechnical, and structural construction activities designed to enhance the long-term safety, stability, and performance of the Heart Butte dam infrastructure as described below. The solicitation will be issued under full and open competition. In accordance with FAR 15.201 Exchanges with Industry Before Receipt of Proposals, the Reclamation Missouri Basin Regional Office previously hosted an Industry Day Event for the Heart Butte Dam Safety of Dams Modification project located near Elgin, North Dakota. Please see special notice number DOIRFB0240024 on sam.gov for additional information regarding the industry day previously held in relation to this pre-solicitation notice. This procurement will utilize Far Part 15 procedures. The government intends to award a Firm Fixed Price purchase order to one contractor to accomplish this scope of work. Heart Butte Dam Safety Modification (HBSDM) Project Scope of Work The scope of work includes, but is not limited to, the following major components: 1. Dewatering and Unwatering Systems Design, installation, operation, and maintenance of temporary dewatering and unwatering systems to facilitate dry working conditions within the outlet works and adjacent excavation zones. Systems shall be capable of managing both surface water and groundwater inflows throughout all phases of construction. 2. Cofferdam Works Engineering design, construction, and subsequent removal of temporary cofferdams to isolate work areas from reservoir and tailwater influences. Cofferdams shall meet all applicable safety and hydraulic performance criteria and be coordinated with dewatering operations. 3. Foundation Void Remediation Injection grouting to fill and stabilize voids or discontinuities within the foundation materials, accessed from within the outlet works conduit. Grouting operations shall be performed using low-mobility or chemical grout, as specified, to ensure compatibility with existing geologic conditions. 4. Outlet Works Conduit Rehabilitation Selective demolition of deteriorated concrete sections using saw cutting and hydro-demolition techniques. Installation of temporary structural shoring to support conduit integrity during repair operations. Reinforcement repair and reconstruction of the conduit to restore structural capacity and hydraulic performance. 5. Jet Grouting Operations Execution of jet grouting from both interior and exterior access points of the outlet works conduit to improve ground strength and reduce permeability. Grouting shall be performed in accordance with engineered patterns and quality control protocols to ensure uniform treatment. 6. Embankment Excavation Controlled excavation of designated portions of the existing dam embankment to facilitate installation of new filter and drainage systems. Excavation shall be staged and supported to maintain embankment stability and minimize risk to existing structures. 7. Filter and Drainage System Construction Construction of a new sand filter trench to intercept and manage seepage flows. Installation of a zoned filter and drain system, including sand filter layers, gravel drainage zones, and protective berms, designed to meet modern dam safety standards. 8. Toe Drain System Installation Placement of high-density polyethylene (HDPE) toe-drain piping systems, including associated observation wells and cleanouts, to enhance seepage monitoring and control. All components shall be installed to specified grades and alignments to ensure long-term functionality. 9. Earth Retaining Structures Furnishing and installation of pre-fabricated earth retaining wall systems to support excavation faces and permanent embankment features. Retaining walls shall be designed for site-specific loading conditions and integrated with adjacent structures. 10. Outlet Conduit Joint Sealing Application of chemical grouting techniques to seal joints within the outlet works conduit, preventing internal leakage and mitigating potential piping pathways. Please see Attachment #1 (00 00 01_Specifications_2.23.26) for a copy of the current Reclamation specifications for more information. The government intends to award a Firm Fixed Price contract for the forthcoming solicitation with discussions. The government is seeking a waiver from the requirements for the implementation of a Project Labor Agreement (PLA). Working hours are anticipated to be 24 hours a day for 6 days a week. The government is requesting responses to this pre-solicitation announcement no later than March 31, 2026 at 1700MT. Please send all correspondence related to this pre-solicitation announcement to Mitchell Frost at mfrost@usbr.gov. It is incumbent upon contractors to monitor the Sam.Gov for RFP release and all subsequent amendments, if applicable. Effective October 26, 2018, all contractors interested in doing business with the Federal Government must be registered in the System for Award Management (SAM) database when submitting an offer or quotation. Note: Registering in ¿SAM¿ does not constitute an automatic award of any contract or agreement to the registering contractor. SAM is centralized database for consolidating the Central Contractor Registration (CCR), the online Representation and Certifications Application (ORCA), and the Excluded Parties List System (EPLS). Additionally, the contractors Unique Entity Identifier (UEI) is required for the SAM registration and annual confirmation requirements must be accomplished through the SAM website at https://www.sam.gov. For assistance with registering in SAM, contact the Federal Services Desk at 1-866-606-8220. Training videos are also available on the SAM.gov website under Learning Center; to help users understand the features and functionality of the site. Payment Requests for the anticipated contract must be submitted electronically through the U.S. Department of the Treasury's Internet Payment Platform (IPP) system. The IPP website is located at https://www.ipp.gov. The contractor must use the IPP website to register access and submit requests for payment. Contractors may obtain assistance by contacting the IPP Production Helpdesk via e-mail ippgroup@bos.frb.org or phone 1-866-973-3131. If the contractor is unable to comply with the requirements to use IPP for invoice submission, the contractor must submit a waiver request in writing to the Contracting Officer with its proposal. The estimated price of this construction effort is more than $10,000,000. This pre-solicitation notice is not a RFP and does not in any way authorize vendors to incur costs on behalf of the Government.
56%
Pre-Solicitation03/31/2026
Heart Butte Dam Modification Sources Sought Notice December 18, 2025 This announcement is being used for market research and advanced planning purposes. Proposals are not requested and will not be accepted from this Sources Sought Notice. THIS IS NOT A SOLICITATION FOR PROPOSALS AND A CONTRACT WILL NOT BE AWARDED AS A RESULT OF THIS NOTICE. In accordance with FAR 15.201 Exchanges with Industry Before Receipt of Proposals, the United States Bureau of Reclamation (Reclamation), Missouri Basin Regional Office, previously hosted an Industry Day Event for the Heart Butte Dam Safety of Dams Modification (HBSDM) project located near Elgin, North Dakota. Please see special notice number DOIRFB0240024 on sam.gov for additional information regarding the industry day previously held in relation to this Sources Sought notice. Heart Butte Dam Safety Modification (HBSDM) Project ¿ Scope of Work The Heart Butte Dam Safety Modification project encompasses a comprehensive suite of civil, geotechnical, and structural construction activities designed to enhance the long-term safety, stability, and performance of the dam infrastructure. The scope of work includes, but is not limited to, the following major components: 1. Dewatering and Unwatering Systems ¿ Design, installation, operation, and maintenance of temporary dewatering and unwatering systems to facilitate dry working conditions within the outlet works and adjacent excavation zones. ¿ Systems shall be capable of managing both surface water and groundwater inflows throughout all phases of construction. 2. Cofferdam Works ¿ Engineering design, construction, and subsequent removal of temporary cofferdams to isolate work areas from reservoir and tailwater influences. ¿ Cofferdams shall meet all applicable safety and hydraulic performance criteria and be coordinated with dewatering operations. 3. Foundation Void Remediation ¿ Injection grouting to fill and stabilize voids or discontinuities within the foundation materials, accessed from within the outlet works conduit. ¿ Grouting operations shall be performed using low-mobility or chemical grout, as specified, to ensure compatibility with existing geologic conditions. 4. Outlet Works Conduit Rehabilitation ¿ Selective demolition of deteriorated concrete sections using saw cutting and hydro-demolition techniques. ¿ Installation of temporary structural shoring to support conduit integrity during repair operations. ¿ Reinforcement repair and reconstruction of the conduit to restore structural capacity and hydraulic performance. 5. Jet Grouting Operations ¿ Execution of jet grouting from both interior and exterior access points of the outlet works conduit to improve ground strength and reduce permeability. ¿ Grouting shall be performed in accordance with engineered patterns and quality control protocols to ensure uniform treatment. 6. Embankment Excavation ¿ Controlled excavation of designated portions of the existing dam embankment to facilitate installation of new filter and drainage systems. ¿ Excavation shall be staged and supported to maintain embankment stability and minimize risk to existing structures. 7. Filter and Drainage System Construction ¿ Construction of a new sand filter trench to intercept and manage seepage flows. ¿ Installation of a zoned filter and drain system, including sand filter layers, gravel drainage zones, and protective berms, designed to meet modern dam safety standards. 8. Toe Drain System Installation ¿ Placement of high-density polyethylene (HDPE) toe-drain piping systems, including associated observation wells and cleanouts, to enhance seepage monitoring and control. ¿ All components shall be installed to specified grades and alignments to ensure long-term functionality. 9. Earth Retaining Structures ¿ Furnishing and installation of pre-fabricated earth retaining wall systems to support excavation faces and permanent embankment features. ¿ Retaining walls shall be designed for site-specific loading conditions and integrated with adjacent structures. 10. Outlet Conduit Joint Sealing ¿ Application of chemical grouting techniques to seal joints within the outlet works conduit, preventing internal leakage and mitigating potential piping pathways. This scope of work is intended to address critical dam safety concerns through a combination of structural rehabilitation, seepage control, and foundation improvement measures. All work shall be executed in accordance with applicable federal, state, and local regulations, as well as project-specific technical specifications and quality assurance requirements. The government intends on awarding a Firm Fixed Price contract with a period of performance of approximately December 31, 2026, to June 30, 2030, or 1,277 calendar days. The Government is seeking interest from large businesses, 8(a) and small businesses, small-disadvantaged businesses, woman-owned small businesses, HubZone small businesses and/or service-disabled veteran owned small business concerns who have the specialized knowledge, experience, and resources necessary to successfully complete a project of this size, scope, and complexity. The NAICS Code for this project is 237990 Other Heavy and Civil Engineering Construction with a business size standard of $45.0 million. The Government will not reimburse any costs associated with responding to this Sources Sought Notice. This notice shall not be construed as a commitment by the Government to issue a solicitation or ultimately award a contract, nor does it restrict the Government to a particular acquisition approach. The Government will not be bound by this information if a solicitation is issued. Responses to this Sources Sought notice may include capability statements, past performance information, and any additional details that respondents believe demonstrate their company's capacity to undertake the size, scope, complexity, and magnitude of this effort. All responses should be submitted to Contracting Officer Mitchell Frost at mfrost@usbr.gov by 1700 EST on January 4, 2026.
56%
Market Research01/04/2026

Additional Details

Solicitation Number

R15PS00361

Archive Date

Aug 18, 2015