GovChime
Notice ID: 550cfed56ca2c71bb92adbc829865b8bAward NoticeAwarded

19--LCR MSCP Hydraulic Dredge

Awarded on February 8, 2017. Full description on SAM.gov.

Awarded tounder R17PC00020 (source: SAM.gov award notice)• $2.2M

Overview

Posted
February 9, 2017
Notice type
Award Notice
NAICS
336611: Ship Building and Repairing
Agency
Department of the InteriorBUREAU OF RECLAMATION

Notice details

Office
DENVER FED CENTER
PSC
19: SHIPS, SMALL CRAFT, PONTOON, DOCKS
Last updated
Dec 5, 2025
Award date
Feb 8, 2017
Award amount (SAM.gov award notice)
$2.2M

Identifiers

Solicitation number
R17PS00005
Notice ID
550cfed56ca2c71bb92adbc829865b8b
Award number (PIID)
R17PC00020

Description

Award of a hydraulic dredge and ancillary equipment for the Bureau of Reclamation, Lower Colorado Region.

Full description on SAM.gov

Award Overview

Award Number

R17PC00020

Award Amount (SAM.gov award notice)

$2.2M

Award Date

Feb 8, 2017

Awardee

Awardee UEI

CX29SQJ6J4C5

Original Solicitation

Notice ID: 550cfed56ca2c71bb92adbc829865b8b

Posted Date: Feb 9, 2017

Original Response Deadline: Not specified

Contract Details

Contract data not yet available

Contract details typically appear within 2-4 weeks after award; DoD awards are published about 90 days after signature.

Contacts

Contracting Officer

Primary Contact

Dillard, Dennis

Documents

No documents available.

Lifecycle

Solicitation:R17PS00005
  1. Pre-Solicitation
  2. Solicitation
  3. Awarded

This opportunity has been awarded.

  1. 5×
    Pre-SolicitationNov 3, 2016

    19--LCR MSCP Hydraulic Dredge

    Notice cf8d0a8b1d6f0d75f22b06bb3849e954 on SAM.gov

  2. SolicitationDec 21, 2016

    19--LCR MSCP Hydraulic Dredge

    Notice 74fd4830a4a87073c1f68762f9407cf4 on SAM.gov

  3. AwardedCurrentFeb 9, 2017

    19--LCR MSCP Hydraulic Dredge

    Notice 550cfed56ca2c71bb92adbc829865b8b on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
Multiple-award contract indefinite-delivery indefinite-quantity (MAC IDIQ) for discrete production, non-discrete production and other production work to support Navys four public shipyards, Trident Refit Facilities (TRFs) at Kings Bay and Bangor (TRFKB and TRFB), Naval Submarine Base New London (SUBASE New London) and Naval Base Point Loma (NBPL) in accomplishing repair, maintenance, and modernization of all submarines. The initial solicitation N00024-25-R-4321 established a MAC IDIQ framework for procuring work during Chief of Naval Operations (CNO) availabilities on SSNs. This baseline capability is now designated as Requirement 1. This solicitation N00024-27-R-4320 provides for a rolling admissions period for Requirement 1 and also incorporates two new requirements designated as Requirement 2 and Requirement 3.Requirement 2 consists of procuring work during availabilities on SSBNs and SSGNs at designated Submarine Maintenance Repair Facilities. Participating locations include Norfolk Naval Shipyard (NNSY), Puget Sound Naval Shipyard (PSNS), Pearl harbor Naval Shipyard (PHNSY), Portsmouth Naval Shipyard (PNSY), Trident Refit Facilities (TRFs) at Kings Bay and Bangor (TRFKB and TRFB), Naval Submarine Base New London (SUBASE New London) and Naval Base Point Loma (NBPL). Requirement 3 consists of procuring work during availabilities on SSNs specifically at TRFKB, TRFB, SUBASE New London, and NBPL. Existing MAC IDIQ contract holders (Requirement 1) electing to compete for Requirement 2 and/or Requirement 3 shall submit a formal proposal in strict compliance with the solicitation requirements for each applicable requirement they seek an award of. The specific requirements will be defined at the delivery order level, and will encompass efforts such as preservation, structural/non-destructive testing, shipboard work, electrical services, component repair, and engineering support. Efforts include performing drydock submarine repairs, maintenance and alterations at NNSY, PSNS and IMF, PHNSY and IMF, PNSY, TRFKB, TRFB, SUBASE New London, and NBPL and performing the repair and restoration of select critical components. Offerors are not required to have their own drydock. Work would be performed under delivery orders anticipated to be completed among MAC IDIQ awardees over a base period ending on 1 September 2030 with three additional option years concluding on 1 September 2033, previously established under N00024-25-R-4321 if all options are exercised. The contract periods were established as follows: Base Period - Contract award through 1 September 2030; Option Year 1 - 2 September 2030 through 1 September 2031;Option Year 2 - 2 September 2031 through 1 September 2032; Option year 3 - 2 September 2032 through 1 September 2033.Any new awards made because of this Request for Proposal (RFP) will follow the same contract ordering period periodicity as provided above. The Navy will include rolling admissions provisions enabling the Navy to annually announcement an interim competition for the purpose of adding additional contractors to the MAC IDIQ. The Navy has categorized each of these requirements (1, 2 and 3) to be procured under the MAC IDIQ into two tiers: Critical (Lot 1) and Non-Critical (Lot 2), as defined as follows: Critical (Lot 1) requirements consist of efforts that involve critical systems. Due to the nature of critical systems onboard the submarine the likelihood that delays in completing the work associated with these systems will have a significant impact on the overall availability schedule, the Navy will require contractors to possess capability and capacity to meet technical requirements for critical systems to be eligible for Lot 1 scope. To complete this work, awardees are expected to have the knowledge, skills, and experience necessary to compete for multiple concurrent complex availabilities on critical systems. Critical systems (Lot 1), although not all inclusive, the following is a list of the most common critical systems. All systems listed imply areas of the system and equipment requiring work certifications that are not subject to special emphasis program controls (e.g., submarine safety program (SUBSAFE), fly by wire (FBW), deep submergence systems/scope of certification (DSS/SOC).Vertical Launch Systems (VLS)Ship control systems components Torpedo tube Bow planes Sonar Dome Large vertical array Shipboard hydraulics systems Normal fuel oil tank and systems Lube oil systems on-Critical (Lot 2) requirements consist of efforts that do not involve critical systems but may include systems and equipment requiring work certifications. Lot 2 scope is expected to require fewer specialized contractor capabilities, both in terms of personnel and equipment. The Navy intends to issue Non-Critical (Lot 2) efforts under a Small Business Set-Aside.All responsible sources may submit a quotation, bid, or proposal, as appropriate, which will be considered by the agency. All responsible sources may submit a quotation, bid, or proposal, as appropriate, which will be considered by the agency. DISCLAIMER: Prior Questions and Answers documentation provided with this RFP is for information purposes only. Interested parties should carefully review the current solicitation for any changes.
38%
Solicitation12/31/2026
This announcement is a Sources Sought Synopsis (market survey). This is not a Request for Quote (RFQ) or a Request for Proposal (RFP). This announcement is for information and planning purposes only and is not a commitment by the Government, implied or otherwise, to issue a solicitation or award a contract. The purpose of this sources sought is to determine interest and capability of potential businesses. The Government may use responses to this sources sought synopsis to make an appropriate acquisition decision for this project. The U.S. Coast Guard Surface Forces Logistics Center is conducting market research for potential qualified contractors for the maintenance and support of the systems and equipment pertaining to the Integrated Propulsion Plant on Coast Guard Cutter (CGC) HEALY from 20JULY2028 – 21JULY2033. GE Power, Power Conversion a Part of GE Vernova (GE) is the original equipment manufacturer (OEM) of the Integrated Propulsion Plant on CGC HEALY and holds the proprietary data rights to provide the required repair and support. The previous contract was awarded sole source to GE under contract number 70Z08523DLREP0003. This work requires that the Contractor provide all management, supervision, personnel, labor, materials and equipment (except for Government furnished property) required to maintain and support the integrated machinery plant systems/components on CGC HEALY and Government owned shoreside equipment that is used in support of CGC HEALY. Support includes, but is not limited to, periodic equipment maintenance, technical representative visits, telephone consultations, remote technical support, hardware and software configuration management services, conditional technical support, upgrades, and periodic equipment training. A draft of the current awarded performance work statement is provided for information only. This work includes, but is not limited to, the following: Periodic system maintenance and equipment grooms. This includes annual shipboard depot level maintenance and shoreside spare depot level maintenance at CG Inventory Control Point (ICPs) and Contractor’s facilities, inspection, and operational testing of all systems and equipment related to the Integrated Power Plant. Technical Support. This includes immediate access to 24/7 technical support while the Cutter is underway and during port calls while on mission. Conditional technical support for troubleshooting and repairs. This includes casualty response and repairs, as well as engineering analysis and repairs identified as necessary during equipment grooms. Configuration management services. This includes obsolescence evaluation and prediction of out-year reliability, maintainability, and fitness of service availability concerns five years beyond the contract. Crew training. This includes hands-on and classroom training for operators and maintainers both attached to HEALY as permanent party crew and CG shore support personnel. Technical refresh and replacement of obsolete subcomponents to meet current industry supportability standards. This includes design, validation, and installation of specific system subcomponents to ensure operational availability and maintenance support through the midlife maintenance period. The CGC HEALY is homeported in Seattle, WA at 1519 Alaskan Way S., Seattle, WA 98134. The CGC HEALY, the Coast Guard's largest vessel, is 420 feet long, 82 feet wide, drafts 31 feet (at full load), and weighs 16,660 long tons (at full load). NAICS Code for this requirement: 336611 – Ship Building and Repairing FSC Code for this requirement: J999 – Non-Nuclear Ship Repair (West) Size Standard: 1,300 Employees Please note that the period maintenance being performed will occur during planned dry dock and dockside availabilities, at which time other substantial depot-level maintenance will be accomplished. No cost or pricing data is required. All responsible sources may submit a capability statement, which will be considered by the agency. If interested and capable of performing the work please respond to the attached questionnaire returning it via email to Contract Specialist Sherri Ore at Sherri.S.Ore@uscg.mil and Contracting Officer, Amy Kelm, at Amy.A.Kelm@uscg.mil. Please insert - Sources Sought Response to 70ZU027ILREP1113 in the subject line.
38%
Market Research11/29/2026
USCGC Joseph Tezanos DD FY27
38%
Solicitation12/07/2026
38%
AwardedOpen
Military Sealift Command and Fleet Logistics Center Yokosuka, JAPAN, will be holding a Ship Repair Industry Day event in Yokohama on 1 December 2026, with a capacity to accommodate 40 contractors. Representatives from the Director of Ship Management Office, Military Sealift Command Far East (MSC FE), the Engineering Office, and FLC will be in attendance. This event will provide an opportunity for industry partners to ask questions, share proposals, and discuss matters of mutual interest directly with our representatives. The event will begin at 0900 and the morning program will include several short presentations, followed in the afternoon by individual one-on-one meetings until 1700. Separate meeting opportunities will be available with FLC and MSC. We encourage interested participants while providing your RSVP, to indicate the number of attendees from your company and also to register for these one-on-one sessions with either MSC, FLC or both, and bring forward any questions, concerns, or proposals for discussion. The event is planned to take place at: Rose Hotel Yokohama 77 Yamashita-cho, Naka-ku, Yokohama Tel: 045-681-3311 We look forward to seeing you at this year's Industry Day. Please RSVP details to the following by 23 Nov 2026 @1000hrs: 1} Eric Topor, LCDR, USN Military Sealift Command, Ship Support Unit Japan/ Maintenance Hub Singapore; eric.s.topor.mil@us.navy.mil; 2} Eric Tanovan, Contracting Division Director; FLC Site Singapore; eric.tanovan2.civ@us.navy.mil; Alternate: 3} Evelyn Progasom; Contract Specialist (Team Lead) FLC Site SIngapore; evelyn.progasom.ln@us.navy.mil. **We are planning future Industry Days for Korea and Singapore soon.**
38%
Special Notice11/23/2026

Additional Details

Solicitation Number

R17PS00005

Archive Date

Feb 28, 2017