GovChime
Notice ID: 29a1ed60e5994673b91c6b315eba2770JustificationAwarded

NEFSC JJH Marine Sciences Laboratory Seawater Intake Line Repair

Awarded on September 20, 2026. Full description on SAM.gov.

Overview

Posted
October 5, 2026
Notice type
Justification
NAICS
237110: Water and Sewer Line and Related Structures Construction
Agency
Department of CommerceNATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION

Notice details

Office
DEPT OF COMMERCE NOAA
Place of performance
Highlands, New Jersey, 07732
Last updated
Nov 4, 2026
First published
Last updated on SAM.gov
Award date
Sep 20, 2026
Award amount (SAM.gov award notice)
Not specified

Identifiers

Solicitation number
REQUIREMENTS-26-3483
Notice ID
29a1ed60e5994673b91c6b315eba2770

Description

The National Marine Fisheries Service (NMFS) James J. Howard Marine Sciences Laboratory, located at Highlands, NJ, relies on continuous, uninterrupted seawater delivery to support critical marine research, aquaculture, and experimental habitats. The existing 6-inch Schedule 80 PVC seawater intake lines have experienced operational constraints, requiring immediate targeted intervention on line #2. The objective of this contract is to safely mobilize, inspect, and perform specialized jetting operations in an effort to clear obstructions and restore functionality within seawater intake line #2.

The Contractor shall provide all labor, supervision, materials, equipment, tools, logistical support, and marine vessels necessary to complete the inspection and targeted obstruction clearance of seawater intake line #2.

The scope is divided into the following primary tasks:

Task 1: Mobilization, Logistics, and Site Preparation: 

  • Marine & Land Mobilization: Mobilize all necessary workboats, dive support vessels, jetting equipment, and support tools to the James J. Howard Marine Lab waterfront.
  • Safety & Environmental Controls: Implement appropriate safety barriers and environmental controls to protect the local marine environment and conform to Sandy Hook's strict environmental regulations.

Task 2: Inspection and Assessment:

  • Line Inspection: Conduct a thorough initial inspection of seawater intake line #2 to locate, identify, and assess the nature of the internal obstructions.
  • Reporting: Document findings and coordinate with the onsite technical representative prior to or during jetting operations.

Task 3: Jetting and Obstruction Clearance Operations:

  • Jetting Operations: Deploy specialized marine jetting equipment into seawater intake line #2.
  • Obstruction Clearance: Execute targeted jetting operations in a safe manner in an effort to dislodge, clear, and flush out the identified obstructions to restore line flow.

Task 4: Post-Jetting Testing and Verification:

  • Flow Verification: Perform functional flow or vacuum testing on line #2 following jetting operations to evaluate the success of the clearance efforts and verify restored operational capacity.

Task 5: Demobilization and Site Restoration:

  • Demobilization: Remove all boats, equipment, unused materials, and temporary safety barriers from the facility and surrounding waters.
  • Site Restoration: Restore any disturbed land, dock, or staging areas to their pre-work conditions.

Full description on SAM.gov

Award Overview

Award Number

1305M326P0404

Award Amount (SAM.gov award notice)

Not specified

Award Date

Sep 20, 2026

Awardee

Not specified

Original Solicitation

Notice ID: 29a1ed60e5994673b91c6b315eba2770

Posted Date: Oct 5, 2026

Original Response Deadline: Not specified

Contacts

Contracting Officer

Primary Contact

Documents

Files (1)

  • Single Source Determination - Sandy Hook Seawater Intake Line Repair_Redacted.pdf

    377 KBAdded in Justification version 1Posted
    Download

Lifecycle

  1. 1
    Version 1JustificationCurrent

    NEFSC JJH Marine Sciences Laboratory Seawater Intake Line Repair

    Notice 29a1ed60e5994673b91c6b315eba2770 on SAM.gov

Other notices for this solicitation

  1. Market ResearchRelated noticeAug 19, 2026

    NEFSC JJH Marine Sciences Laboratory Seawater Intake Line Repair

    Notice fb0625b24e9d439ea4c61d30b0949290 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
This project includes the replacement of 4” asbestos cement pipe (abandoned in place) with 4” HDPE water main and associated valves and connections to laterals. The work includes; Installation of 4450 linear feet of 4” HDPE pipeline, most of which will be shallow bury or laid on cleared ground and covered with imported fill from a government source. Cover an additional 1150 linear feet of existing pipeline with imported fill from a government source. Installation of 2 combination air-vacuum valves with utility boxes. Installing associated valves, daylight drains, and pumpout drains; and connecting to existing lateral mains and services.
-Combined Synopsis12/01/2026
Contractor shall provide all labor, supervision, equipment, and material necessary to repair and replace potable water treatment equipment located at USCG Station Milford Haven, Hudgins, VA. See attached Statement of Work. This procurement is 100% set-aside for Small Businesses using NAICS code of 237110 and size standard of $45.0 Million. The Government contemplates award of a Firm-Fixed Price contract resulting from this solicitation. See 52.212-2 for evaluation criteria. All quotes must be submitted by NOON Eastern Time on December 01, 2026, via email to Frank.M.Powers@uscg.mil. Ensure blocks 14 (Include UEI) through 20c of the SF 1442 and pricing are completed before emailing. Questions about this solicitation must be submitted in writing to the Contracting Specialist at the email address listed above, no later than NOON November 19. An amendment may be posted to clear up any ambiguities and answer all questions at one time. No oral questions will be accepted. All potential quoters are REQUIRED to visit the site to field verify any/all quantities before submitting quotes. A MANDATORY site visit will be held on Tuesday, November 17 at 10:00 AM at USCG Station Milford Haven, 63 Mill Point Road, Hudgins, VA 23067. Interested parties must arrange site visits with MK1 Michael Aguirre at Michael.A.Aguirre@uscg.mil to coordinate station access. Visitors will be required to present a valid Real ID or Passport as a method of identification.
-Solicitation12/01/2026
**The solicitation for Project No. WWYK240146 - Design & Implement Monitoring & Control System for IWCS, Bldg. 62516 has unfortunately been cancelled. Funding for this effort is not anticipated in early Fiscal Year 2027, and the effort will be resolicited should funding become available at a later date. Please refer to the most recently amended RFP in the attachments section of this notice for more information.** This order proposal request is only available to current MACC-BOA holders. The work to be performed under the terms of this Order consists of furnishing all materials, labor, plant, tools, transportation, equipment, testing services, quality control, and incidentals required to accomplish the Design & Implement Monitoring & Control System For IWCS, B62516 at Tinker Air Force Base (AFB), Oklahoma (reference the project drawings for additional location information). The Contractor shall perform a site investigation to verify existing conditions. If necessary, additional as-built drawings are available from 72 ABW/CE - Engineering Support, located in B400 on Tinker AFB. The Contractor shall be responsible for identifying the necessary logistical, architectural, and structural work elements required to perform the work as described herein. Assemblies, framework, fixtures, or apparatus not readily identified on the project drawings, specifications, or the Statement of Work (SOW) shall be provided by the Contractor as required for a complete, fully operating, and functioning system or systems ready for use by the Government. Information such as floor plan layouts and dimensions; structural, mechanical, and electrical data; and location of underground utilities provided by the Government for existing and new construction are based on available as-built documentation, field observation, and equipment selected as design basis by the Government. This information is to be considered approximate and shall be field verified by the Contractor. This project will require contractor personnel to perform work and/or operate vehicles on flight lines, runways, taxiways, parking ramps, or in aircraft hangers or maintenance areas. As such, all contractor personnel will be required to receive FOD awareness training in accordance with Tinker Air Force Base Instruction (Tinker AFBI) 21-100. IAW National Institute of Standards and Technology (NIST) Special Publication (SP) 800-171, the requirement does not include CUI residing on or transiting through contractor and/or subcontractor systems. Site visit attendance is mandatory to be considered eligible for submission of proposal. RSVP email confirmation of intent to attend the site visit to the primary and secondary points of contact with Entry Authorization List (EAL) information by 11:59 PM CST, Friday, May 22nd, 2026. If a Contractor/Subcontractor fails to meet this deadline, the site visit information will not be released to your organization. Order documents not able to be uploaded to SAM.gov will be provided to contractors who RSVP'd their intent to attend the initial site visit. Attachments include an EAL spreadsheet. Please fill-in all information for individuals who will need/do not currently have Base access. Please ensure all information requested in the EAL is filled out accurately and full names matching state-issued IDs are utilized to assure Security Forces can process the requests for Base Access in a timely manner. If an individual has Base access, their name is all the information needed. Please try to limit your parties to seven attendees per Contractor. The site visit is scheduled for June 1st, 2026 at 10:00 A.M. at the project performance site. More specific meeting details will be shared with contractors who have sent an RSVP. The due date for the RFIs arising from the site visit is currently set for June 5th, 2026 at 5:00 PM CST. RFIs will be answered in a timely manner, and RFI responses will be shared with all site visit attendees. This notice signifies the release of the formal RFP for Project No. WWYK240146 - Design & Implement Monitoring & Control System for IWCS, Bldg. 62516. The due date for proposals has been extended to July 27th, 2026 at 5:00 PM CST. Any further extensions granted to the proposal due date will be updated to this posting. Please see the attachments for the formal RFP as well as the attachments referenced in the body of the formal RFP. Responses to received RFIs may warrant revisions to associated RFP documents so be sure to monitor this SAM posting for updates. In lieu of the physical CD, some additional documents have been added to the attachments section including the Project Docs, Facility Standards, As-Built Info, CAD Drawings, and some additional large files. Please contact the primary and secondary points of contact if you experience any difficulty downloading or accessing the documents. An accommodation has been made to extend the due date for proposals to July 27th, 2026 at 5:00 PM CST. This is to allow offerors additional time to incorporate the Government responses to the Requests for Information as well as supplemental information from key stakeholder Honeywell into their proposals. All other terms and conditions of the solicitation and associated documents remain unchanged and in full force and effect. Please refer to the amended RFP in the attachments section of this notice for more information. All RFI responses have been received and compiled. Please see the attachments for the RFI responses. Utilize these in continuing to formulate your proposals. If RFI responses prompt a need for an extension to the proposal due date, please communicate that to the primary and secondary points of contact, and any extensions granted will be updated to this posting. An amendment to the formal RFP including a revision to Section C - Descriptions/Specifications/Statement of Work has been issued to correct a discrepancy among the solicitation, IFC Drawings, and Statement of Work. The scope of the solicitation and the subsequent order exclusively pertains to the four lift stations enumerated in the Statement of Work, IFC Drawings, and amended solicitation. The due date for proposals remains firm as July 27th, 2026, and all other terms and conditions of the solicitation and associated documents remain unchanged and in full force and effect. Please refer to the amended RFP in the attachments section of this notice for more information.
-Solicitation07/27/2026
-AwardedOpen
Well Replacement at Lac Qui Parle Project shop site. See solicitation for details.
-AwardedOpen

Additional Details

Solicitation Number

REQUIREMENTS-26-3483

Archive Date

Nov 4, 2026

Office Address