GovChime
Notice ID: 14034cd5817d49c38056351ef936d097Solicitation

Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB

Active, responses due . Full description on SAM.gov.

Description

On October 7, 2026, Amendment No. 2 was issued to correct badge access link provided in Amendment  No. 1.

On October 6, 2026, Amendment No. 1 was issued to provide dates for site visits.

This scope of work is to build an addition and renovate the Central Utility Building (CUB). The CUB supplies chilled water, hot water, low conductivity water, and makeup water to various lab buildings and systems. These systems serve both comfort cooling and heating needs, as well as process cooling and utility requirements. It is vital to Fermilab’s mission that CUB be revitalized and expanded, ensuring the ability to serve existing and future loads.

The General contractor shall furnish all required supervision, labor, materials, tools, plant and appurtenances necessary to perform diligently and fully all work as described in the drawings and technical specifications. All work includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision as required to construct the project described in the drawings, technical specification and the detailed description contained herein.

The critical schedule constraint for construction of this project is Fermilab’s accelerator shutdown, with an anticipated scheduled start on January 1, 2028, and anticipated end date of January 1, 2030- these dates may change depending on the needs of the Lab.  The General Contractor must start their on-site efforts, and complete the construction scope under this contract, within the shutdown window.

This project includes the following milestones:

Milestone 1 – Issuance of Notice to Proceed (NTP) to 30th December 2027. This milestone is intended for completion of necessary submittals and RFIs, approval of shop drawings for fabrication and procurement.

Milestone 2 – 3rd January 2028; This milestone marks the point where construction work may begin.

Milestone 3 – 31st January 2029; AUP 1 CUB Extension complete.

Milestone 4 – 29th June 2029; AUP 2 Existing CUB Upgrade complete.

Milestone 5 – 28th September 2029; Completion of CUB- including all remedial work following removal of site trailers.

Full description on SAM.gov

Overview

Agency:
Department of Energy
Office:FERMILAB - DOE CONTRACTOR
Posted:October 7, 2026
NAICS:236210: Industrial Building Construction
Last Updated:Oct 28, 2026
First published:
Last updated on SAM.gov:
PSC:Z2EZ: REPAIR OR ALTERATION OF OTHER INDUSTRIAL BUILDINGS
Set-Aside:No Set aside used
Type:Solicitation
Place of Performance:Batavia, Illinois, 60510

Award Overview

Possible prior contracts

Sign in to see possible prior contracts for this requirement (matched by agency, NAICS and place of performance; not confirmed).

Contacts

Contracting Officer

Primary Contact

Documents

Files (21)

  • Amend 02 to RFP 376508-CD.pdf

    124 KBAdded in Solicitation version 3Posted
    Download
  • Amend 01 to RFP 376508-CD.pdf

    159 KBAdded in Solicitation version 2Posted
    Download
  • 1.0 RFP 376508-CD Instructions to Offerors.pdf

    310 KBAdded in Solicitation version 1Posted
    Download
  • Exhibit A - Scope of Work UIP SP-1 CUB.pdf

    252 KBAdded in Solicitation version 1Posted
    Download
  • Exhibit B- Construction Drawing Set.pdf

    106 MBAdded in Solicitation version 1Posted
    Download
  • Exhibit C- Specification Set- New CHW Plant and CUB Upgrades.pdf

    29 MBAdded in Solicitation version 1Posted
    Download
  • Exhibit D- Geotechnical Engineering Report.pdf

    37 MBAdded in Solicitation version 1Posted
    Download
  • Exhibit E- Electrical (LV) Calculations.pdf

    347 KBAdded in Solicitation version 1Posted
    Download
  • Exhibit F- Army Corp NPR-Letter.pdf

    158 KBAdded in Solicitation version 1Posted
    Download
  • Exhibit G- FFDG General Terms and Conditions for Construction (08.2025).pdf

    320 KBAdded in Solicitation version 1Posted
    Download
  • Exhibit H - Construction Insurance Requirements.pdf

    245 KBAdded in Solicitation version 1Posted
    Download
  • Exhibit I - Statement of Acknowledgment (SF-1413).pdf

    699 KBAdded in Solicitation version 1Posted
    Download
  • Exhibit J - Fermilab Subcontractor Safety Information Questionnaire.pdf

    1.4 MBAdded in Solicitation version 1Posted
    Download
  • Exhibit K- Price Proposal Form.pdf

    734 KBAdded in Solicitation version 1Posted
    Download
  • Exhibit L- Subcontractor Annual RepsCerts-SARC. Rev 8.pdf

    476 KBAdded in Solicitation version 1Posted
    Download
  • Exhibit M- Proposal Cerftifications Form PUR-466_r5_10.14.25.pdf

    476 KBAdded in Solicitation version 1Posted
    Download
  • Exhibit N- Bond Bid FL-41.pdf

    749 KBAdded in Solicitation version 1Posted
    Download
  • Exhibit O- FL-42 (Rev 1.25) - Payment Bond.pdf

    1.6 MBAdded in Solicitation version 1Posted
    Download
  • Exhibit P- Performance Bond_FL-40.pdf

    743 KBAdded in Solicitation version 1Posted
    Download
  • Exhibit Q- Davis Bacon Wage Rate.pdf

    482 KBAdded in Solicitation version 1Posted
    Download
  • Exhibit S- Sample Firm-Fixed-Price Subcontract.pdf

    747 KBAdded in Solicitation version 1Posted
    Download

Lifecycle

  1. 1
    Version 1Solicitation

    Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB

    Notice b3e96254b8dc47f48e58f2821e5100ad on SAM.gov

  2. 2
    Version 2Solicitation

    Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB

    Notice d285489a5ca44b42a999bc943cc821cb on SAM.gov

  3. 3
    Version 3SolicitationCurrent

    Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB

    Notice 14034cd5817d49c38056351ef936d097 on SAM.gov

Similar Opportunities

Title
Phase
Agency
NAICS
Set Aside
Posted
Deadline
Location

Additional Details

Solicitation Number

RFP-376508-CD

Archive Date

Dec 2, 2026

Office Address

Batavia, IL, 60510