GovChime
Notice ID: 8de1da092b6343039e06f3f23d7df974Solicitation

Multi -Roof Replacement Project

Archived on March 28, 2026. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
4:00 PM UTC−05:00
Posted
January 28, 2026
Notice type
Solicitation
Set-aside
No Set aside used
NAICS
236220: Commercial and Institutional Building Construction
Agency
Department of Energy

Notice details

Office
PRINCETON LAB - DOE CONTRACTOR
Place of performance
Princeton, New Jersey, 08543
PSC
Y1EZ: CONSTRUCTION OF OTHER INDUSTRIAL BUILDINGS
Last updated
Aug 21, 2026

Identifiers

Solicitation number
RFP26-021R
Notice ID
8de1da092b6343039e06f3f23d7df974

Description

There are several existing roofs (C50 ESAT Building/C52 PLT Power Building/C60 C Site Pump
House/D45 Rad Waste Handling Facility) which are past their useful life requiring costly
maintenance to upkeep. Severe water infiltration occurs regularly at failing joints, punctures,
and flashing. Portions of existing metal coping have pulled away during storm events causing
large sections of membrane to separate from the substrate. A catastrophic failure to one of
these roofs would negatively impact the ability to conduct the top priority experimental
operations in the Laboratory.
1.2. SCOPE
1.2.1. The Subcontractor shall provide all materials, labor, supervision, equipment, and expertise
required replace the noted roofs and specified components per the associated contract
documents. Construction scope includes the following:
1.2.1.1. Remove and replace existing built-up roofs at PPPL. Buildings include:
1.2.1.1.1. C50 – ESAT Building
1.2.1.1.2. C52 – PLT Power Building
1.2.1.1.3. C60 – C Site Pump House
1.2.1.1.4. D45 – Rad Waste Handling Facility
1.2.1.2. Demolition including removal of existing membrane, cover board, insulation, metal trim,
flashing, coping and any other miscellaneous roofing material accessories.
1.2.1.3. Remove and recycle stone ballast on ballasted roofs. Recycle documentation to be
provided to PPPL.
1.2.1.4. Additional integrated roof elements shall be inspected and replaced as specified within
this SOW. Elements include: wood blocking, roof drains, gutters, scuppers, downspouts,
and metal/concrete roof panels.
1.2.1.5. Abandoned equipment shall be removed to a point that does not affect new roof
installation. Any equipment that should be temporarily relocated so roof replacement
work can be completed shall be the responsibility of the roofing contractor.
1.2.1.6. Contractor to furnish and install 2 layers of 2.6” ISO.
1.2.1.7. Contractor to furnish and install ½” HD coverboard mechanically fastened.
1.2.1.8. Contractor to furnish and install 145 mil Carlisle Fleeceback EPDM, black in color adhered
to coverboard.
1.2.1.9. Contractor to furnish and install counter flashing and copings, expansion joints and other
roofing components as required for manufacturer’s warranty.
Page 3 of 21
1.2.1.10. The new roof system shall be comprised of the following materials: EPDM membrane,
cover board, and insulation.
1.2.1.10.1. Meets a minimum insulating value of R-30 average. Modifications to the existing
building envelope are required to accommodate additional insulation.
1.2.1.10.2. Flexible walkway pads shall be provided to all operating equipment/drain locations
and as necessary to meet manufacturer’s requirements.
1.2.1.10.3. All materials shall be furnished by Carlisle Syntec Systems and shall meet all
manufacturer specifications to obtain a minimum manufacturer system warranty of
30 years along with a 2-year installers warranty. The warranty coverage shall
include incidental membrane punctures, damage from hail and a minimum of 72-
mph peak gust wind speeds.
1.2.1.11. Roof perimeter guardrails shall be provided on all roofs. See attached guardrail cut sheet
for details.
1.2.1.12. New and higher curbs as required due to the new roof installation work.
1.2.1.13. Contractor to build up existing roof vents as required due to the new roof work.
1.2.1.14. Expansion joint to be raised up to account for new roof insulation height for the ESAT
building roof.
1.2.1.15. Contractor to add a new roof drain at the Northwest section of the ESAT building roof.
1.2.1.16. Contractor to replace all existing roof scuppers with new.
1.2.1.17. Contractor to replace all existing roof drains with new.
1.2.1.18. Contractor to provide minimum of 12” overlap between the existing adjacent roof
membrane system and provide written confirmation the systems are compatible.
1.2.1.19. Contractor to temporary relocate and reinstall any fall protection anchor systems
identified on roof sections.
1.2.1.20. Contractor to install secondary drainage per code in addition to existing drains for the PLT
building roof.
1.2.1.21. If necessary, existing asbestos elements shall be mitigated by PPPL. Subcontractor to
assist the abatement contractor to bring the sealed roofing material down from roof area
to grade with lift equipment. Coordination of this work shall be completed in concert with
all other construction activities. The subcontractor to follow directly after PPPL
abatement contractor to install new roofing system. The construction subcontractor shall
be responsible to coordinate all work with PPPL.
1.2.1.22. Any and all equipment that requires power disconnect has to be coordinated with PPPL a
minimum of 72 hours prior. All equipment that will be out of service shall be minimized.
1.2.1.23. All roof fans and equipment are to be salvaged, protected, and reinstalled.

THERE ARE (5) COVER LETTER SECTIONS TO THE RFP.  THERE ARE FILES ATTACHED TO EACH COVER LETTER.  TO VIEW THE ATTACHMENTS YOU MUST

(1) FIRST DOWNLOAD EACH COVER LETTER SECTION TO YOUR DESKTOP. 

(2) AFTER DOWNLOADING EACH COVER LETTER--REOPENED EACH ONE (ON YOUR DESKTOP)

YOU SHOULD BE ABLE TO SEE THE ATTACHED FILES ON THE RIGHT HAND SIDE OF THE COMPUTER SCREEN.   BE SURE TO UTILIZE ADOBE ACROBAT SOFTWARE TO VIEW THE PDF FILES

Full description on SAM.gov

Award Overview

Contacts

Contracting Officer

Primary Contact

Documents

Select documents to download

Showing 9 of 9 items

Document
Source
Agency
Posted Date
File Size
Actions
SOW_C50-C52-C60-D45 Roof Replacement Work.pdf
SolicitationENERGY, DEPARTMENT OFJan 28, 202639.1 MB
SolicitationENERGY, DEPARTMENT OFJan 28, 2026569.75 KB
Section I. Cover Page.pdf
SolicitationENERGY, DEPARTMENT OFJan 28, 202638.98 MB
SolicitationENERGY, DEPARTMENT OFJan 28, 2026337.76 KB
SolicitationENERGY, DEPARTMENT OFJan 28, 20262.19 MB
SolicitationENERGY, DEPARTMENT OFJan 28, 2026415.95 KB
SolicitationENERGY, DEPARTMENT OFJan 28, 202688.62 KB
SolicitationENERGY, DEPARTMENT OFJan 28, 20261.41 MB
SolicitationENERGY, DEPARTMENT OFJan 28, 202670.46 KB

Lifecycle

Solicitation:RFP26-021R
  1. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. 2×
    SolicitationCurrentJan 27, 2026

    Multi -Roof Replacement Project

    Notice 8de1da092b6343039e06f3f23d7df974 on SAM.gov

Similar Opportunities

Additional Details

Solicitation Number

RFP26-021R

Archive Date

Mar 28, 2026

Office Address

Princeton, NJ, 08540