GovChime
Notice ID: 2af630faa7d57818e4f6d27c6e276a6eCombined Synopsis/Solicitation

Metallurgical Failure Assessment Consultant

Archived on June 24, 2017. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
12:00 AM UTC+02:00
Posted
May 31, 2017
Notice type
Combined Synopsis/Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
541330: Engineering Services

Notice details

Place of performance
Wentzville, 63385
PSC
B: SPECIAL STUDIES/ANALYSIS, NOT R&D
Last updated
Dec 5, 2025

Identifiers

Solicitation number
RFQ-CSB-17-0020
Notice ID
2af630faa7d57818e4f6d27c6e276a6e

Description

The CSB is assessing a steam explosion that occurred on April 3, 2017, in St. Louis, Missouri. The bottom head of a 510-gallon steel vessel called a semi-closed receiver (SCR) failed. The remnants of the bottom head of the vessel looks severely corroded while the shell of the vessel, even the part directly adjacent to the severely corroded head, looks nearly pristine. The objective of this procurement is to obtain the services of an expert to provide advice on specific engineering and technical issues in metallurgical failure mechanisms. As part of this procurement, the contractor shall: Travel to Wentzville, MO. Conduct a preliminary examination of the subject pressure vessel, and remnants of the bottom head of this vessel. Review evidence provided by the CSB to further understand possible failure modes. Provide recommendations to the CSB on further documentation to obtain to aid in the diagnosis of probable failure modes. Advise the CSB on where and how to collect metal samples for further laboratory testing (i.e. where to cut the vessel, and what type of tool should be used to make the cut). Identify the material(s) of construction of the heads, the "tank circle," and the shell of the vessel. Write a brief report describing apparent corrosion mechanism(s) and failure mode of the SCR supported by evidence from metallurgical, chemical, and possibly other analyses. Include possible explanations for the distinct differences in damage between the original shell and head material. Before performing any task, the contractor shall advise the COR of its plan and methodology for the task, and obtain the COR's approval of such plan and methodology. The contractor shall provide all equipment required to perform the work under this contract.

Full description on SAM.gov

Award Overview

No prior contract identified

No matching prior contract was found within an 18-month window using the same agency, NAICS, place-of-performance state, and PSC. This may be a new requirement, or the prior award uses a different classification.

Contacts

Contracting Officer

Primary Contact

Amy M McCormick
Contracting Officer

Documents

No documents available.

Lifecycle

Solicitation:RFQ-CSB-17-0020
  1. Combined Synopsis
  1. Combined SynopsisCurrentMay 31, 2017

    Metallurgical Failure Assessment Consultant

    Notice 2af630faa7d57818e4f6d27c6e276a6e on SAM.gov

Similar Opportunities

Title
Phase
Deadline

Additional Details

Solicitation Number

RFQ-CSB-17-0020

Archive Date

Jun 24, 2017