Notice ID: 2af630faa7d57818e4f6d27c6e276a6eCombined Synopsis/Solicitation
Metallurgical Failure Assessment Consultant
Archived on June 24, 2017. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 12:00 AM UTC+02:00
- Posted
- May 31, 2017
- Notice type
- Combined Synopsis/Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 541330: Engineering Services
Notice details
- Place of performance
- Wentzville, 63385
- PSC
- B: SPECIAL STUDIES/ANALYSIS, NOT R&D
- Last updated
- Dec 5, 2025
Identifiers
- Solicitation number
- RFQ-CSB-17-0020
- Notice ID
- 2af630faa7d57818e4f6d27c6e276a6e
Description
The CSB is assessing a steam explosion that occurred on April 3, 2017, in St. Louis, Missouri. The bottom head of a 510-gallon steel vessel called a semi-closed receiver (SCR) failed. The remnants of the bottom head of the vessel looks severely corroded while the shell of the vessel, even the part directly adjacent to the severely corroded head, looks nearly pristine. The objective of this procurement is to obtain the services of an expert to provide advice on specific engineering and technical issues in metallurgical failure mechanisms. As part of this procurement, the contractor shall: Travel to Wentzville, MO. Conduct a preliminary examination of the subject pressure vessel, and remnants of the bottom head of this vessel. Review evidence provided by the CSB to further understand possible failure modes. Provide recommendations to the CSB on further documentation to obtain to aid in the diagnosis of probable failure modes. Advise the CSB on where and how to collect metal samples for further laboratory testing (i.e. where to cut the vessel, and what type of tool should be used to make the cut). Identify the material(s) of construction of the heads, the "tank circle," and the shell of the vessel. Write a brief report describing apparent corrosion mechanism(s) and failure mode of the SCR supported by evidence from metallurgical, chemical, and possibly other analyses. Include possible explanations for the distinct differences in damage between the original shell and head material. Before performing any task, the contractor shall advise the COR of its plan and methodology for the task, and obtain the COR's approval of such plan and methodology. The contractor shall provide all equipment required to perform the work under this contract.
Award Overview
No prior contract identified
No matching prior contract was found within an 18-month window using the same agency, NAICS, place-of-performance state, and PSC. This may be a new requirement, or the prior award uses a different classification.
Contacts
Contracting Officer
Primary Contact
Documents
No documents available.
Lifecycle
Solicitation:
RFQ-CSB-17-0020- Combined Synopsis
- Combined SynopsisCurrentMay 31, 2017
Metallurgical Failure Assessment Consultant
Similar Opportunities
Title | Phase | Deadline |
|---|---|---|
Additional Details
Solicitation Number
RFQ-CSB-17-0020
Archive Date
Jun 24, 2017