GovChime
Notice ID: b6f1bf24e85e1bc6989f6429c501e12bCombined Synopsis/Solicitation

Antenna upgrade

Archived on May 4, 2010. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
8:00 PM UTC+02:00
Posted
April 13, 2010
Notice type
Combined Synopsis/Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Agency
Department of JusticeFEDERAL BUREAU OF INVESTIGATION

Notice details

Office
FBI-JEH
Place of performance
FBI Academy, Quantico, 22135
PSC
J: MAINT, REPAIR, REBUILD EQUIPMENT
Last updated
Dec 5, 2025

Identifiers

Solicitation number
RFQ_E010383
Notice ID
b6f1bf24e85e1bc6989f6429c501e12b

Description

Questions and Answers: 1) As the SSPA is GFE and an outdoor antenna mount, are the pedestal mounting brackets GFE as well? No 2) Are both antennas pedestals currently positioned so that they can acquire both the XTAR and Paradigm satellites? Yes 3) What length of LMR-400 is required for each TX path and what length is required for the RX path for each antenna? Less than 10 ft 4) What length of Antek WR-112 waveguide is required? Antek part is a filter. Waveguide required about 10 ft. 5) Is there currently DC voltage present at the antenna to support the LNB voltage requirement? If so, what method is currently being used to provide the LNB DC power? No, a bias power supply will be required. Can be GFE if desired. Current Ku system provides LNC power from BUC. 6) Can you provide the drawings, pictures or as-built of the current antenna configuration? No 7) Confirm the ability to re-utilize the existing L-Band heliax cable and fiber runs inside the building leading to the roof top. Existing heliax is not part of this requirement. 8) Are there any restrictions for working on the roof top? A minimum of a 10 foot ladder will be required to safely replace the feed assembly. Standard safety practices apply. No known restrictions. Stairwell access to roof available. 9) Can a site visit be scheduled for this week to survey requirements? Yes. Security access requirements apply.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Gary W. Hopkins
Contracting Officer
Fax: 703-632-6440

Documents

No documents available.

Lifecycle

Solicitation:RFQ_E010383
  1. Combined Synopsis
  1. 3×
    Combined SynopsisCurrentMar 25, 2010

    Antenna upgrade

    Notice b6f1bf24e85e1bc6989f6429c501e12b on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

RFQ_E010383

Archive Date

May 4, 2010