GovChime
Notice ID: 974792a586934e60fec7c9a0183d666fCombined Synopsis/Solicitation

Re-roof Bldg. 12 @ USDA-ARS-CMAVE

Archived on March 30, 2010. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
5:00 PM UTC−05:00
Posted
July 1, 2008
Notice type
Combined Synopsis/Solicitation
Agency
Department of AgricultureAGRICULTURAL RESEARCH SERVICE

Notice details

Office
USDA ARS SEA AAO ACQ/PER PROP
Place of performance
USDA-ARS-CMAVE 1700 SW 23rd Drive, GAINESVILLE, 32608
PSC
Z: MAINT, REPAIR, ALTER REAL PROPERTY
Last updated
Sep 25, 2026

Identifiers

Solicitation number
RFQ8-0014
Notice ID
974792a586934e60fec7c9a0183d666f

Description

RFQ #08-0014 STATEMENT OF WORK RE-ROOF BUILDING TWELVE USDA, ARS, CMAVE 1700 SW 23RD DRIVE GAINESVILLE, FLORIDA SECTION C-1 GENERAL 1.1. SCOPE OF WORK. - The contractor shall provide all personnel, equipment, tools, and other items or services necessary to complete the below scope of work: The Contractor shall provide all materials, equipment, and labor, to re-roof Building 12 with a dual component polyurethane spray foam of 2.7 pounds per square foot. Preparation shall consist of vacuuming loose gravel and debris, then wet vacuum roof surface to remove dust and residue. Applied foam shall be a minimum of 1” up to 3” for proper drainage. Coating system shall be a dual component polyglycol rubber vapor barrier such as Garna-Flex or equivalent sprayed at a rate of 2 gallons per 100 sf. Top coat shall be 1 coat of Garma-White or equivalent sprayed at a rate of 1 gallon per 100 sf. The Contractor shall clean and repair surfaces damaged or soiled as a result of his operations under this contract and return the surfaces to the same or better condition than before work commenced. All new material used in this roofing project shall be asbestos-free. The Contractor is responsible for removal of all foreign matter, rubbish, and scrap material from the roof. The surface shall be cleaned with cleaners identified by the manufacturer as suitable for the purpose used. The roof shall be clean, smooth, and dry before beginning the application the new roofing material. All debris shall be disposed of offsite. The Contractor shall provide a 10 year manufacturer's warranty with yearly inspections. The roofing Contractor shall inspect the roof prior to completion of the contract. After the roofing contractor’s authorized representative has inspected the roof to determine acceptability for warranty issuance, any deficiencies on the final inspection report shall be corrected by the Contractor and made ready for final inspection. Coordinate this inspection with the Contracting Officer's Representative, providing at least five days advance notice. The Contractor shall perform an analysis to determine presence of hazardous material and provide two copies of the findings to the Contracting Officer. The assessment shall be in compliance with the National Emission Standards for Hazardous Air Pollutants (NESHAP) regulations (Title 40 of the Code of Federal Regulations). The primary focus is to verify the existence or absence of Regulated Asbestos Containing Materials (RACM), or Lead in any portion of the roofing system at or above the action levels that may be impacted as a result of this work. Should any products be identified, the Contractor shall notify the Contracting Officer and shall submit a proposal to cover removal and disposal of the product in compliance with Federal, State and/or Local regulations. The removal and disposal of RACM will be added as a separate line item of this contract, if findings warrant the work. 1.2. PHYSICAL SECURITY. The Contractor shall be responsible for safeguarding all Government property. Prior to the end of each work day, the Contractor is required to secure their equipment and leave the site prior to the lock down of the USDA Research Facility. The government is not responsible for damage to the Contractors equipment during this contract. 1.3. HOURS OF OPERATION. 1.3.1. Normal hours. The Contractor’s scheduled performance of these services must fall within the hours of 7:00 am to 4:30 pm, Monday through Friday unless previously approved by the COR. Section C-3 GOVERNMENT FURNISHED PROPERTY AND SERVICES 3.1. GENERAL. The Government shall provide, without cost, the facilities, equipment, fuel, and services listed below. 3.1.1. No Government-furnished property will be provided. 3.2. SERVICES. The Government shall provide, without cost, the services listed below. 3.2.1. Government-furnished utilities will be provided where available. SECTION C-4 CONTRACTOR-FURNISHED ITEMS AND SERVICES 4.1. GENERAL. Except for those items or services specifically stated to be Government-furnished in Section C-3, the Contractor shall furnish everything required to perform this Statement of Work.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Elaine S. Holmes
Purchasing Agent
Fax: 352-374-5889

Documents

No documents available.

Lifecycle

Solicitation:RFQ8-0014
  1. Combined Synopsis
  1. Combined SynopsisCurrentJul 1, 2008

    Re-roof Bldg. 12 @ USDA-ARS-CMAVE

    Notice 974792a586934e60fec7c9a0183d666f on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

RFQ8-0014

Archive Date

Mar 30, 2010

Office Address

STONEVILLE, MS, 38776