Notice ID: 58cbbb12443927bda1773e254f4354c5Presolicitation
Roadwork(Work/Paving)
Archived on March 30, 2010. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 11:59 PM UTC−05:00
- Posted
- April 21, 2009
- Notice type
- Presolicitation
- Agency
- Department of AgricultureAGRICULTURAL RESEARCH SERVICE
Notice details
- Office
- USDA ARS SEA AAO ACQ/PER PROP
- Place of performance
- USDA-ARS-STARS, Atten: Lee Adams, Foreman 22271 Chinsegut Hill Road, BROOKSVILLE, 34601
- PSC
- Z: MAINT, REPAIR, ALTER REAL PROPERTY
- Last updated
- Sep 25, 2026
Identifiers
- Solicitation number
- RFQ9-0007
- Notice ID
- 58cbbb12443927bda1773e254f4354c5
Description
RFQ #9-0007 STATEMENT OF WORK ROAD WORK/PAVED USDA, ARS, STARS 22271 Chinsegut Hill Road Brooksville, FL Section C-1 General 1.1. SCOPE OF WORK. The contractor shall provide material, equipment, & labor for road work/paved to include: (1) clean and prep road to be paved; (2) lay asphalt 1.5 inches thick; (3)roll to compaction; (4) 12 feet by 1300 feet; (5) Two drive way entrances 12 feet by 17 feet; (6)use type one asphalt; located at the USDA, ARS SubTropical Agricultural Research Station, 22271 Chinsegut Hill Road, Brooksville, FL. 1.2. PHYSICAL SECURITY. The Contractor shall be responsible for safeguarding all Government property. Prior to the end of each work day, the Contractor is required to secure their equipment and leave the site prior to the lock down of the USDA Research Facility. The government is not responsible for damage to the Contractors equipment during this contract. 1.3. HOURS OF OPERATION. 1.3.1. Normal hours. The Contractor’s scheduled performance of these services must fall within the hours of 7:00 am to 4:30 pm, Monday through Friday unless previously approved by the Maintenance Supervisor. SECTION C-3 GOVERNMENT FURNISHED PROPERTY AND SERVICES 3.1. GENERAL. The Government shall provide, without cost, the facilities, equipment, fuel, and services listed below. 3.1.1. No Government-furnished property will be provided. 3.2. SERVICES. The Government shall provide, without cost, the services listed below. 3.2.1.Government-furnished utilities will be provided where available. SECTION C-4 CONTRACTOR-FURNISHED ITEMS AND SERVICES 4.1 GENERAL. Except for those items or services specifically stated to be Government-furnished in Section C-3, the Contractor shall furnish everything required to perform this Statement of Work
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Documents
No documents available.
Lifecycle
Solicitation:
RFQ9-0007- Pre-Solicitation
Formal solicitation typically follows within 30–60 days. (estimate)
- Pre-SolicitationCurrentApr 21, 2009
Roadwork(Work/Paving)
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
RFQ9-0007
Archive Date
Mar 30, 2010
Office Address
STONEVILLE, MS, 38776