16603 Air Conditioner Replacement
Responses closed . Full description on SAM.gov.
Overview
- Response deadline
- 3:00 PM EST
- Posted
- November 4, 2026
- Notice type
- Special Notice
- Agency
- Department of WarDepartment of the Air Force
Notice details
- Office
- AIR FORCE MATERIEL COMMAND.AIR FORCE SUSTAINMENT CENTER.FA8579 SOFTWARE SPRT AFSC PZIM
- Place of performance
- Warner Robins, Georgia, 31098
- Last updated
- Nov 4, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- Robins_AFB_16603_Air_Conditioner_Replacement_Site_Visit
- Notice ID
- 4323bfd7a71b41db900731982628d496
Description
UPDATE: Please see the updated Product Description (PD) attachment as this requirement has been updated.
This is a notice for all interested parties to perform a site visit concerning the procurement of the “BLDG 229C Lab 3 Air Conditioner Repair” at Robins Air Force Base.
NOTE: COSTS INCURRED ARE AT THE INTERESTED PARTY’S EXPENSE. THE GOVERNMENT WILL NOT PAY ANY ASSOCIATED COSTS WITH THE SITE VISIT.
The date and time scheduled for the site visit is Wednesday, Nov 18th, 2026 10 AM-12 PM EST. This will be a two-hour visit. The first hour of the visit will be viewing the system needing to be repaired while the second hour will consist of discussions in a conference room concerning the requirement. Questions and answers that arise from this site visit will be posted with the release of the Request for Quote (RFQ). This will be the only time block available. See attachments for more details.
All interested parties need to be at Robins Air Force Base Visitor’s Center no later than 9:15 AM EST on Wednesday, Nov 18th 2026.
Site Visit Participation
Interested contractors planning to attend the site visit shall email Adriana Lytle, adriana.lytle@us.af.mil and Dylan Russet, dylan.russett@us.af.mil no later than 3:00 p.m. EST on 12 November 2026 indicating their intent to participate.
The email shall include the contractor’s:
- Company name
- Address
- Telephone number
- CAGE code
- Name of representative/ point of contact
For visitor-center access processing, contractors shall also include the following for each attendee and vehicle, as applicable:
- Valid driver’s license number
- Proof of vehicle insurance
- Vehicle registration
Late submissions may not be processed in time for site access. Visitors should bring their driver’s license, current vehicle registration, and proof of vehicle insurance (rental’s only need to provide the rental agreement) to the visitor center.
Participants with current CAC cards will not need to go to the visitor center unless they are transporting participants on site that do not have CAC cards
Address:
Robins Air Force Base Visitor’s Control Center
Address: BLDG 219 at Gate 3 (Watson Gate)
Ph: 478-926-4208
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Documents
Lifecycle
- 1Version 1Special Notice
16603 Air Conditioner Replacement
- 2Version 2Special Notice
16603 Air Conditioner Replacement
- 3Version 3Special NoticeCurrent
16603 Air Conditioner Replacement
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
This is a solicitation for commercial products or commercial services prepared in accordance with the format in RFO 12.201-1, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued. This solicitation is being issued as a Request for Quote (RFQ) No.FA857127Q0019. This is a commercial requirement that will be solicited as a Total Small Business Set Aside, Brand Name requirement for Dowty's Magnaflux SF-1515. The Government intends to award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation is the lowest price. | - | Solicitation | 11/13/2026 |
This is a new requirement that will be awarded as a brand name competitive full and open contract. The contractor shall provide technical drawings, technical expertise, telephone support, on-site engineering support, liaison services for warranty management, and the training necessary to enable the Government to maintain and repair 100-ton HVAC system (Carrier), Human Machine Interface (HMI) control panel and exterior safety door located at Building 670 within the 402nd Commodities Maintenance Group (CMSX) at Robins Air Force Base. The proposed nine-month period of perfromance is expected to be 28 Dec 2026 to 24 Sep 2027. See PD Paragraph for full details on HVAC, HMI control panel, and exterior safety door. | - | Combined Synopsis | 11/12/2026 |
The Warner Robins Air Logistics Center (ALC) is hosting an Industry Day on 9 December 2026, to solicit feedback from interested industry representatives regarding an initiative by AFLCMC/ROZ to sustain the Halvorsen Aircraft Loader (ACL) system. If your company is interested in participating in the Industry Day, please review the attached invitation which provides more details. ATTACMENTS: Industry Day Invitation DRAFT Performance Work Statement (PWS) | - | Special Notice | 12/02/2026 |
The purchase of one (1) new heavy-duty long-haul tractor configured with an integrated dual-sleeper cab and manual transmission to support AFLCMC/EBU Robins Weapons Superiority’s unique mission requirements in accordance with the Statement of Work (SOW). Sections 3.2 - 3.12 of the SOW provide exact details that the tractor must have for the requirement to be fulfilled. Quotes MUST contain pricing to demonstrate costs for each section listed above. Selecting the contract award winner will be determined as follows: The lowest priced quote will be reviewed for responsiveness to this solicitation and responsibility as a contractor (i.e. active in SAM). If the quote received meets all requirements, the contracting officer will send an email to the selected vendor notifying of their selection. If the lowest priced quote does not meet the listed criteria, then the next lowest quote will be reviewed. This process will continue until a contract award winner is determined. | - | Solicitation | 11/23/2026 |
Amendment 2 - 9Nov2026 - Purpose is to extend the proposal due date. An updated FOPR Letter will be uploaded to this post. 5Nov2026 - Update questions & answers (v3) have been posted below. Additional questions are being worked and will be posted next week 2Nov2026 - Updated questions & answers (version 2) have been posted below. Additional questions are being worked and will be posted in the near future. Amendment 1 - The purpose of this amendment is to incorporate Attachment J - Original Equipment Manufacturer of AAGs. An updated FOPR letter and Attachment J will be uploaded to this post as attachments. Questions were also received regarding this solicitation. The questions and Government answers are also being provided as an attachment in this post. The purpose of this requirement is to develop Aircraft Adapter Groups (AAGs) designed for the F-16 aircraft which includes the required production level software, hardware, and corresponding technical orders. The AAGs are to be integrated into the Government developed and designed Common Aircraft Portable Reprogrammable Equipment (CAPRE) Secure Memory Loader Verifier (SMLV). | - | Solicitation | 01/19/2027 |
Additional Details
Solicitation Number
Robins_AFB_16603_Air_Conditioner_Replacement_Site_Visit
Archive Date
Nov 27, 2026
Office Address
ROBINS AFB, GA, 31098-1672