GovChime
Notice ID: 82777d7b0e9c1b7fb8d414bfe6a97c2fAward NoticeAwarded

RSS C-26 Overhaul Services

Awarded on July 22, 2013. Full description on SAM.gov.

Awarded tounder SAQMMA13C0162 (source: SAM.gov award notice)• $4.1M

Overview

Posted
July 23, 2013
Notice type
Award Notice
NAICS
336411: Aircraft Manufacturing

Notice details

Place of performance
Regional Security System Air Wing (location of planes) Paragon Christ Church 17110 Barbados , Bridgetown
PSC
15: AEROSPACE CRAFT AND STRUCTURAL COMPONENTS
Last updated
Dec 3, 2025
Award date
Jul 22, 2013
Award amount (SAM.gov award notice)
$4.1M

Identifiers

Solicitation number
SAQMMA13R0231
Notice ID
82777d7b0e9c1b7fb8d414bfe6a97c2f
Award number (PIID)
SAQMMA13C0162

Description

This SOW describes work to be accomplished on two (2) C-26 aircraft, owned and operated by the Regional Security System (RSS) in Bridgetown, Barbados. Work described should result in both airframes standardized with the same aircraft flight systems and mission systems. The base requirement consists of an Aircraft Condition Inspection (ACI), airframe stripping and painting, performance of required maintenance and inspections, upgrade or replacement of aircraft mission systems, overhaul of engines, overhaul of propellers, and acquisition of spares. The ACI will be performed after the aircraft has been stripped and will identify all required aircraft repairs and/or inspections in order to maintain both C-26 aircraft at Original Equipment Manufacturer (OEM) specifications and Federal Aviation Administration (FAA) airworthiness standards; however, FAA certification is not required. The base requirement includes either upgrade or replacement of the mission equipment suite on both aircraft. Optional tasks to be priced by the contractor include installation of a line of sight video downlink system, acquisition of ground equipment to receive and display the downlink data, upgrade or replacement of the EFIS displays, replacement of the FMS, installation of Cobham multi-function command radios, and installation of a radio gateway/tactical repeater allowing for communications across multiple radio nets through the aircraft intercommunication system (ICS). The aircraft shall be moved by the Contractor to a paint stripping facility proposed by the Contractor and accepted by the USG that is a certified FAA part 145 repair station. Paint stripping will be accomplished in conformance with aircraft OEM specifications and guidance. After the aircraft have been paint stripped, the Contractor shall accomplish a detailed ACI to evaluate the condition of the airframe (with special emphasis on the detection of corrosion), avionics, power plants, and installed mission systems (EO/IR, and Radar). The stripping and ACI will be accomplished utilizing only FAA certificated Part 145 Repair Station(s). The Contractor shall develop and submit an aircraft condition report in a format proposed by the contractor. The report, at a minimum, shall document the tail number, flight hours, estimated repair requirements, estimated repair costs and optimal schedule for performing airframe, power plant, and avionics repairs and recommended upgrades on both (2) C-26 aircraft. This report shall include the estimated man-hours, supplies, and costs associated with accomplishing the 10,000 hour scheduled inspection/services, and other inspections/services that must be accomplished to ensure that at least 400 hours or 6 months remains after completion of the required maintenance. Period of Performance: One (1) year from effective date of award (August 13, 2013)

Full description on SAM.gov

Award Overview

Award Number

SAQMMA13C0162

Award Amount (SAM.gov award notice)

$4.1M

Award Date

Jul 22, 2013

Awardee

Awardee UEI

MKLZW2A3BHB1

Original Solicitation

Notice ID: 82777d7b0e9c1b7fb8d414bfe6a97c2f

Posted Date: Jul 23, 2013

Original Response Deadline: Not specified

Contract Details

No FPDS record matches this award number at the same department yet

Contract details typically appear within 2-4 weeks after award; DoD awards are published about 90 days after signature.

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Jennifer Leung
Contract Specialist

Documents

No documents available.

Lifecycle

Solicitation:SAQMMA13R0231
  1. Combined Synopsis
  2. Awarded

This opportunity has been awarded.

  1. 4×
    Combined SynopsisApr 12, 2013

    RSS Bridgetown Barbados - Overhaul/Rebuild of 2 C-26 metroliners

    Notice 9130121dfaeea015435bf9b89c2be6de on SAM.gov

  2. AwardedCurrentJul 23, 2013

    RSS C-26 Overhaul Services

    Notice 82777d7b0e9c1b7fb8d414bfe6a97c2f on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

SAQMMA13R0231

Archive Date

Aug 12, 2013