Notice ID: 8316934e0664fcb70cbe1c03951409a2Award NoticeAwarded
Passport Supply Management Services
Awarded on September 30, 2015. Full description on SAM.gov.
Awarded tounder SAQMMA15C0224 (source: SAM.gov award notice)• $35.0M
Overview
- Posted
- December 14, 2015
- Notice type
- Award Notice
- NAICS
- 541614: Process, Physical Distribution, and Logistics Consulting Services
Notice details
- Place of performance
- Contractor provided facility located within a close proximity of thirty (30) miles to the National Passport Center at Portsmouth, New Hampshire., Portsmouth, 03801
- PSC
- R: SUPPORT SVCS (PROF, ADMIN, MGMT)
- Last updated
- Dec 4, 2025
- Award date
- Sep 30, 2015
- Award amount (SAM.gov award notice)
- $35.0M
Identifiers
- Solicitation number
- SAQMMA15R0191
- Notice ID
- 8316934e0664fcb70cbe1c03951409a2
- Award number (PIID)
- SAQMMA15C0224
Description
The Department of State; Office of Acquisition Management, on behalf of the Bureau of Consular Affairs (CA), Passport Services Directorate (CA/PPT) is seeking a highly qualified contractor to provide a comprehensive integrated inventory management solution for the Passport Agency and Center, Passport Book Print Facilities, Acceptance Facilities (both Postal and non-Postal), and other Federal Passport Partners (i.e. Department of Homeland Security). This service is a critical component of the passport issuance system that will enable efficient passport production throughout the entire country. A chief responsibility of CA is to carry out the Secretary of State's authority to issue U.S citizens secure travel documents while providing the highest level of customer service, professionalism, and integrity. Each year millions of Passport Books and Cards are issued to U.S. Citizens worldwide. PPT is responsible for issuing passports to eligible U.S. citizens who apply. Passport Headquarters (CA/PPT/HQ) manages a network of domestic Passport Centers and Agencies located throughout the U.S. to carry out this responsibility. PPT/HQ, including its Regional Offices, oversees twenty-nine (29) Passport Agencies and Centers, two (2) Passport Book Print Facilities, and approximately 7,584 Acceptance Facilities (5,187 Postal Facilities and 2,397 Non-Postal Facilities) nationwide. CA/PPT/HQ is ultimately accountable for secure and timely issuance of Passports to U.S. citizens. CA/PPT/HQ manages workflow, work processes, internal controls and other crucial functions to ensure the integrity and security of Passport operations. A critical component to support this activity is the inventory, distribution, and maintenance of prescribed levels of supplies, forms, and documents. The Government is seeking a robust solution that will encompass the Supply Management Program (SMP) and the Automated Inventory Management System. This system should provide CA/PPT management with a web-based dashboard/portal that provides complete program awareness at all times during the contract. The contractor shall be ISO 9001:2000 certified by the International Organization for Standardization. The contractor shall have a Government-Approved Purchasing System. The Contractor shall have the "Full Version" of Adobe Acrobat (not Adobe Reader) to enable font embedding on printable passport forms. The contractor shall provide all program management, administration, labor, equipment, facility, systems, and materials to maintain the CA/PPT Supply Management Program. Responsibilities include the planning, development, management, quality control, reporting, operation and maintenance of systems dealing with the acquisition, movement, and the maintenance of supplies. Typical tasks include, but are not limited to, warehouse operations, storage, packing, crating, staging, shipping, receiving, bar-coding, fulfillment operations, acquisition of supplies, vendor, and inventory management. The required items to be supplied are specific critical and expendable supplies needed for optimal operation of passport related facilities nationwide. The desired automated system must be able to monitor the volume of documents produced at each facility and initiate the shipment of supplies to specific facilities when critical ordering thresholds are met. This system will also monitor other expendable supply levels in addition to critical supplies, set threshold levels, and complete the ordering and delivery of those supplies to the Supply Management program Customers. Shelf life, storage capacity, and inventory levels will be taken into account and incorporated into the system. Information regarding types and quantities of supplies will be furnished by DoS. The contractor shall be required to perform warehousing services and may be required to perform services before and after normal government work hours in the case of an emergency. During peak periods the contractor may be required to hire additional personnel to meet supply demands. The primary performance task is to set up and operate a clean, organized Supply Management Facility (SMF) that provides supplies and material as requested for all CA/PPT Customers. The contractor shall maintain a supply inventory, purchased by the Contractor, to provide to CA/PPT Customer for issuance. Label and organize stocked items so that they are easy to identify and locate. Establish stock ranges and levels that will be adequate to insure supply/material availability and assure continuous on the shelf supply. The Contractor shall maintain the correct inventory level of stock items necessary to support the Government's demand and delivery requirements. The Contractor shall add and maintain items to the CA/PPT inventory at the request of the Government. The Contractor shall be required to establish stock levels based on the supply inventories based on usage. The Contractor may recommend the addition or deletion of items to/from the Inventory List depending on consumption data, which must be maintained by the Contractor. The inventory list of supplies may be modified by the Government and will be supplied to the Contractor as changes in material requirements occur. The entire material inventory function, order placement process and delivery of supplies shall be managed by the Contractor utilizing their compatible software. The Contractor shall use the Government Printing Office (GPO) for printing of some specific items. The Contractor shall be able to provide a modern facility with adequate warehouse and office space to support the program. The warehouse facility shall provide all operational services from a contractor provided facility. The facility shall be located within close proximity thirty (30) miles to the National Passport Center at Portsmouth, New Hampshire 03801. The facility will have appropriate power and telecommunications and have minimum of 5,000 square feet. The contractor will ensure that the storage facility meets all local and Occupational Safety and Health Administration (OSHA), fire regulations, state and local licenses and insurance regulations. Within the facility the Contractor shall manage the receiving, shipping and storage of publications, forms, and other related materials and supplies. The facility will have a loading dock consisting of at least one (1) bay, and all associated ramps, which is accessible to the smallest cargo vans and the longest tractor-trailer. The storage area provided shall be such an environment that paper products stored up to two years will show no degradation in quality and shall remain suitable for shipping for up to five years. The Contractor shall provide necessary equipment; fork lifts, banding equipment, pallet jacks, etc., required for loading and unloading trucks as well as placing bulk items or pallets in appropriate locations on racking. The Contractor shall be able to set aside approximately 1,000 square feet of the area to house contractor personnel and will provide a variety of furniture items such as desks, chairs, credenzas, bookcases, safes, file cabinets, tables, cartons of office supplies, IT, communications, computers, weight scales, and tables. The Government anticipates making a single award hybrid type contract that is Fixed Price Labor Hour (FP) Contract Line Item Numbers (CLINs) and Cost-Reimbursable (CR) CLINs type contract for Government approved Other Direct Costs (ODCs) such as facilities, materials and/or supplies. It is anticipated that the requirement for this service will be for a base year, and four (4) one year options periods staring in FY2015. The North American Industry Classification Code for this requirement is 541514, Inventory Planning and Control Management Consulting Services. The Product Service Code is R706, Logistics Support Services. A facility clearance of SECRET is required. Personnel security clearances range from SECRET to MRPT which depends on the function/role of personnel. A Request for Proposals (RFP) will be issued on or about 15 days after the posting of this notice. This requirement is an 8(a) competitive set-aside. This will be a competitive best value trade-off procurement conducted in accordance with the rules in the Federal Acquisition Regulation (FAR) part 15. The Government will award a contract to the Offeror who is deemed responsible in accordance with FAR Part 9 and whose proposal conforms to the solicitation requirements and determined to be the best value by using a tradeoff process. The Government will not entertain any questions at this time but questions may be posed once the solicitation is released during a specified time frame. No solicitation exists at this time; therefore do not request a copy of the solicitation. The solicitation and supporting documents will be posted in FEDBIZOPPS. Proposals in response to the RFP shall consist of a written submission as described in Section L of the RFP and will be evaluated in accordance with the instructions in Section M. All written proposal submissions shall be submitted to the address listed in the RFP. The date and time when proposals are due will be specified in the RFP. Responses received after the specified date and time will not be considered.
Award Overview
Award Number
SAQMMA15C0224
Award Amount (SAM.gov award notice)
$35.0M
Award Date
Sep 30, 2015
Awardee
Awardee UEI
JAKGJBL7JLL9
Original Solicitation
Notice ID: 8316934e0664fcb70cbe1c03951409a2
Posted Date: Dec 14, 2015
Original Response Deadline: Not specified
Contract Details
No FPDS record matches this award number at the same department yet
Contract details typically appear within 2-4 weeks after award; DoD awards are published about 90 days after signature.
Contacts
Contracting Officer
Primary Contact
Documents
No documents available.
Lifecycle
Solicitation:
SAQMMA15R0191- Pre-Solicitation
- Solicitation
- Awarded
This opportunity has been awarded.
- 5×Pre-SolicitationApr 8, 2015
Passport Supply Management Services
- SolicitationJul 22, 2015
Passport Supply Management Services
- AwardedCurrentDec 14, 2015
Passport Supply Management Services
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Industry Day Announcement Air Force Life Cycle Management Center, Armament Directorate Supply Chain Illumination Capability Hosted by AFLCMC/EB BLUF: AFLCMC/EB requires a secure, scalable, AI-assisted federated data capability that integrates but not unnecessarily replaces existing government, Service, and contractor data sources. The capability must provide end-to-end supply-chain mapping, risk identification and assessment, near-real-time situational awareness, mitigation tracking, and evidence-based decision support for priority munition programs, initially within the Long-Range Weapons, Affordable Munition, and Adaptive Weapons portfolios, with potential expansion across the Armament Directorate portfolio. 1. Introduction The Air Force Life Cycle Management Center (AFLCMC), Armament Directorate (EB), plans to conduct a virtual Industry Day to conduct market research and obtain industry feedback regarding a potential Supply Chain Illumination capability for the munitions enterprise. The Armament Directorate is pursuing an artificial intelligence-assisted, federated data capability to map critical munition supply chains to raw-material sources. The intended capability would provide enterprise-level visibility into supply-chain dependencies, bottlenecks, supplier risks, competing demands, and mitigation actions in support of senior-leader decision-making and mission outcomes. This Industry Day is intended to inform the Government’s market research under Federal Acquisition Regulation Part 10 and help identify mature, scalable commercial and non-traditional solutions that can support the Directorate’s supply-chain visibility requirements. This announcement does not constitute a Request for Proposal (RFP), solicitation, commitment, or promise to issue a solicitation in the future. 2. Background The Armament Directorate currently lacks an integrated mechanism to assess critical supply-chain risk across its acquisition divisions, military Services, and contractor-supported weapon systems. Existing data sources are fragmented (data lives in siloed systems), contractor logistics support arrangements can limit visibility into multi-tier supply chains, and shared dependencies across military and commercial demand can create unanticipated production risk. The Government seeks to improve end-to-end visibility of materials, suppliers, production dependencies, single points of failure, foreign-source dependencies, and mitigation actions across priority munition portfolios down to the raw materials at the lowest of sub-tier suppliers. The initial proof of concept is expected to focus on PAE-prioritized programs within the Long-Range Weapons, Affordable Munition, and Adaptive Weapons portfolios, with potential expansion across the Armament Directorate weapon-system portfolio. 3. Industry Day Objectives The Government seeks industry feedback on approaches to establish a secure, scalable Supply Chain Illumination capability that can: Map supply chains from end item to raw-material origin for critical munition programs, through all tiers of subcontractors. Federate existing government, Service, and contractor data sources without unnecessarily replacing established systems. Identify and assess supply-chain risks, including bottlenecks, single points of failure, constrained materials, supplier financial and manufacturing risk, foreign influence, and competing demands. Support data-sharing standards and interfaces that protect legitimate competition sensitive information while providing the Government sufficient visibility for risk management and decision support. Enable near-real-time situational awareness through application programming interfaces and other appropriate data-exchange mechanisms. Apply AI-assisted analytics, including machine-learning and knowledge-graph approaches, to identify relationships, risks, and mitigation options across complex, multi-tier supply chains. Track mitigation actions through end-item delivery and produce evidence suitable for waiver assessments and senior-leader decision-making. Integrate with relevant enterprise architectures and platforms, including existing Air Force, Army, Navy, and digital Bill of Materials efforts, as appropriate. 4. Event Details for the Virtual Industry Day Open to All Contractors Date: 15 December 2026 Time: 0900hrs CST Location/Platform: Teams Link Classification: Unclassified Registration Deadline: 16 November 2026 The Government will provide an overview of the operational problem, desired endstate, preliminary technical considerations, and potential next steps. The agenda may also include question-and-answer sessions and opportunities for industry participants to provide oral or written feedback. 5. Registration and Participation Registration is required. Interested organizations should submit the following information no later than 16 November 2026: Company name Company address Attendee name, title, email address, and telephone number Identification of the company’s primary point of contact A brief description of the company’s relevant capability or experience Any requested accessibility or administrative support requirements Submit registration information to: AFLCMC EB, Bryant Callahan (850) 882-0260, bryant.callahan.3@us.af.mil. 6. Follow-On Engagement Following Industry Day, the Government may issue a Request for Information, schedule one-on-one market-research discussions, request white papers, or conduct other market-research activities for live demonstrated capabilities only. Participation in Industry Day is not required for participation in any future acquisition or market-research activity unless expressly stated in a future notice. 7. Individual Demonstration Sessions Although not required, contractors may request one-on-one discussions for the sole purpose of providing a live demonstration that addresses the following questions for munitions: Supply Chain Risk: Which suppliers, components, and lower-tier dependencies present the greatest risk to weapon system readiness and production schedules? Operational Performance: How do suppliers lead times, material availability, and supply chain disruptions influence production delays and repair turnaround times? Investment Prioritization: Which supply chain vulnerabilities should receive priority investment to improve production capacity, reduce delays, and strengthen operational readiness? Predictive Analytics: To what extent can historical supplier performance, component lead times, and material shortages predict future supply chain disruptions? To coordinate a one-on-one session with the Government, contract Bryant Callahan, as shown in paragraph 9. Any one-on-one session will be scheduled after the Virtual Industry Day on15 December 2026. 8. Informational Notice THIS IS AN INFORMATIVE POSTING. This announcement is issued solely for planning and market research purposes. It does not constitute RFP, solicitation, contract, or commitment by the Government to procure any supply or service. The Government is not requesting proposals currently. The Government will not reimburse respondents for costs incurred in preparing or submitting registration materials, participating in Industry Day, providing feedback, or responding to any subsequent market research request. This language follows the informative-posting framework used in the supplied Industry Day announcement. 9. Point of Contact Primary Point of Contact: Bryant Callahan AFLCMC/EB bryant.callahan.3@us.af.mil 850-797-4770 Contracting Point of Contact: Patricia Chisholm patricia.chisholm@us.af.mil 850-882-6935 | 67% | Special Notice | 11/16/2026 |
Awarded modification to increase their base period contract ceiling with the amount of $45,000,000,000 to support worldwide expeditionary multiple award contract (WEXMAC) territorial integrity of the U.S. (TITUS geographic region). WEXMAC TITUS will provide supplies and services in support of but not limited to supporting the six phases of the continuum of military operations in support of the geographic Combatant Command's joint operations, coalition partners, and other federal agencies in setting and sustaining the theater through the following requirements: theater opening (includes reception, staging, onward-movement, and integration support; sustainment; theater distribution; and stability operations and Defense Support of Civil Authorities support. The WEXMAC TITUS description of contractual scope provides that services and supplies provided through the performance of this contract include but are not limited to humanitarian assistance/disaster relief, contingency, exercise, lodging, logistics, water-based, and land-based support. The base period began in January 2025 and is expected to be completed by December 2029; if all options are exercised, the performance period will be completed by December 2034. The increased contract ceiling modifications will be incorporated into the contractors' existing base performance period with one five-year option with individual requirements performed under task orders when specific dates and locations are identified. If the option period is exercised, the total estimated contract maximum for each contractor could be $65,000,000,000. | 61% | Awarded | Open |
Contractor answers to questions 1. Contractor experience and technical qualifications Question: May a newly established small business satisfy the minimum requirement of three years of wall-to-wall pharmacy inventory experience and experience at three pharmacies through the qualifications of proposed key personnel, subcontractors, or teaming partners? Will general retail, grocery, military inventory, or equipment-accountability experience qualify instead of pharmacy inventory experience? Government Response: No. 2. Historical inventory quantities, values, and workload Question: Can the Government provide historical inventory line-item counts, SKU quantities, replacement values, pharmacy sections, inventory areas, and prior inventory durations for each of the six facilities, separated by inpatient and outpatient pharmacies? Can the Government also provide historical staffing levels and facility square footage or shelving quantities? Government Response: Available historical inventory information will be provided in the attachment referenced by the Government. FY2026 inventory information is being compiled. Historical staffing levels are unknown, and facility square footage or shelving quantities are not available. 3. Physical inventory completion deadline Question: The solicitation contains references to both January 31 and February 28 for completing physical inventories. Which deadline governs? Government Response: All physical inventories at the six VA facilities shall be completed no later than January 31 of the applicable contract year. All final reports, validations, corrections, and required closeout documentation shall be completed and submitted no later than February 28 of that year. 4. Inventory scheduling and completion requirements Question: May the six facilities be inventoried sequentially by one crew, or must multiple facilities be inventoried concurrently? Are weekend or after-hours inventories permitted, and must each facility's inventory begin at 8:00 a.m. and be completed within one business day? Government Response: The six facilities may be inventoried sequentially between January 1 and January 31, provided that each facility's physical inventory is completed within one business day. Inventories shall ordinarily begin at 8:00 a.m. local time. Weekend work, after-hours access, and inventory dates must be coordinated with each individual VA Medical Center. One original response suggested concurrent scheduling, while several others expressly permitted sequential scheduling. This draft follows the repeated sequential-scheduling responses and should be confirmed. 5. Automated dispensing systems and controlled substances Question: Is the Contractor required to physically count medications contained in automated dispensing cabinets and packaging systems, or will the Government provide system-generated inventory reports? Who is responsible for counting controlled substances? Government Response: The VA Medical Center Pharmacy will generate inventory reports from applicable automated dispensing and packaging systems for incorporation into the Contractor's final reports. Controlled substances will be physically counted by authorized VA Pharmacy personnel, and the Contractor shall incorporate the Government-provided results into the final inventory reports. 6. Government-furnished data and pricing information Question: Will the Government provide product master files, McKesson Prime Vendor pricing information, direct-purchase costing information, and automated-system inventory extracts? What information must the Contractor obtain independently? Government Response: No. No, Vendor should get this from McKesson, Yes, Must meet the requirements of the SOW. 7. Final inventory report format and submission Question: What electronic format and data elements are required for final inventory reports? Will the Government provide a sample report template, and may reports be submitted after February 28 if the physical inventory was completed by January 31? Government Response: A separate electronic inventory report shall be submitted for each facility within seven calendar days after completion of its physical inventory. The report shall include facility, pharmacy/section, item name and strength, package description, applicable NDC/UPC/UPN, McKesson item number where applicable, quantity, current package price, extended replacement cost, section/location, and total inventory replacement cost. Please email mario.russell@va.gov for VISN 09 Spreadsheets. Reports shall be compatible with Microsoft Excel or an equivalent Government-approved spreadsheet application. The Government will not provide a sample report template. All final reports and required corrections must be completed by February 28. Reports submitted after that deadline will not meet the stated requirement. 8. Contractor equipment, software, and access Question: May the Contractor use its own handheld scanners and inventory software? Are specific scanning devices, software platforms, or VA network integrations required? What security and access requirements apply? Government Response: The Contractor may use its own scanners and inventory software, provided they meet the SOW requirements. 9. Pharmacy inventory scope and storage locations Question: Does outpatient inventory include satellite pharmacies and other pharmacy-controlled storage locations? Are medications stored in specialized or low-temperature refrigerators included? Government Response: The number and type of outpatient and satellite pharmacy locations vary by facility. All applicable medications under pharmacy control, including medications stored in specialized refrigeration units, shall be included unless specifically excluded by the SOW. The Contractor shall coordinate the inventory areas with each facility. 10. Incumbent contractor and historical contract information Question: Is this a new requirement or a recompete? If there is an incumbent contractor, what is the previous contract number, awarded contract value, and total price? Government Response: Professional Inventory Control Systems INC, 36C24926P0139, $19,200.00, $19,200.00. 11. Subcontractor participation and on-site staffing Question: May a small business prime contractor use a subcontractor to perform physical inventories under the prime's management and quality control? Must the prime contractor provide its own personnel on-site during each inventory? Government Response: No 12. Past performance evaluation Question: Will an offeror without directly relevant past performance receive a Neutral rating rather than an Unacceptable rating? Government Response: Neutral as this is based of LTPA. 13. Insurance and bonding Question: What insurance coverage and bonding requirements apply, including minimum limits, when evidence must be submitted, and whether a subcontractor's insurance may satisfy any part of the requirement? Government Response: Please reference the SOW. 14. Service Contract Labor Standards wage determination Question: The SOW references an applicable Department of Labor wage determination, but none is attached. Which wage determination applies to this requirement? Government Response: No Wage Determination applies. 15. Implementation plan submission Question: Is the implementation plan required with the technical quotation, or may it be submitted after contract award? Government Response: No. This is based off LTPA 16. Solicitation status and amendments Question: Are the posted SOW and evaluation criteria final for quotation purposes, or does the Government anticipate issuing an amendment to clarify or revise the requirements? Government Response: Final. | 49% | Special Notice | 11/15/2026 |
1. Contractor experience and technical qualifications Question: May a newly established small business satisfy the minimum requirement of three years of wall-to-wall pharmacy inventory experience and experience at three pharmacies through the qualifications of proposed key personnel, subcontractors, or teaming partners? Will general retail, grocery, military inventory, or equipment-accountability experience qualify instead of pharmacy inventory experience? Government Response: No. 2. Historical inventory quantities, values, and workload Question: Can the Government provide historical inventory line-item counts, SKU quantities, replacement values, pharmacy sections, inventory areas, and prior inventory durations for each of the six facilities, separated by inpatient and outpatient pharmacies? Can the Government also provide historical staffing levels and facility square footage or shelving quantities? Government Response: Available historical inventory information will be provided in the attachment referenced by the Government. FY2026 inventory information is being compiled. Historical staffing levels are unknown, and facility square footage or shelving quantities are not available. 3. Physical inventory completion deadline Question: The solicitation contains references to both January 31 and February 28 for completing physical inventories. Which deadline governs? Government Response: All physical inventories at the six VA facilities shall be completed no later than January 31 of the applicable contract year. All final reports, validations, corrections, and required closeout documentation shall be completed and submitted no later than February 28 of that year. 4. Inventory scheduling and completion requirements Question: May the six facilities be inventoried sequentially by one crew, or must multiple facilities be inventoried concurrently? Are weekend or after-hours inventories permitted, and must each facility's inventory begin at 8:00 a.m. and be completed within one business day? Government Response: The six facilities may be inventoried sequentially between January 1 and January 31, provided that each facility's physical inventory is completed within one business day. Inventories shall ordinarily begin at 8:00 a.m. local time. Weekend work, after-hours access, and inventory dates must be coordinated with each individual VA Medical Center. One original response suggested concurrent scheduling, while several others expressly permitted sequential scheduling. This draft follows the repeated sequential-scheduling responses and should be confirmed. 5. Automated dispensing systems and controlled substances Question: Is the Contractor required to physically count medications contained in automated dispensing cabinets and packaging systems, or will the Government provide system-generated inventory reports? Who is responsible for counting controlled substances? Government Response: The VA Medical Center Pharmacy will generate inventory reports from applicable automated dispensing and packaging systems for incorporation into the Contractor's final reports. Controlled substances will be physically counted by authorized VA Pharmacy personnel, and the Contractor shall incorporate the Government-provided results into the final inventory reports. 6. Government-furnished data and pricing information Question: Will the Government provide product master files, McKesson Prime Vendor pricing information, direct-purchase costing information, and automated-system inventory extracts? What information must the Contractor obtain independently? Government Response: No. No, Vendor should get this from McKesson, Yes, Must meet the requirements of the SOW. 7. Final inventory report format and submission Question: What electronic format and data elements are required for final inventory reports? Will the Government provide a sample report template, and may reports be submitted after February 28 if the physical inventory was completed by January 31? Government Response: A separate electronic inventory report shall be submitted for each facility within seven calendar days after completion of its physical inventory. The report shall include facility, pharmacy/section, item name and strength, package description, applicable NDC/UPC/UPN, McKesson item number where applicable, quantity, current package price, extended replacement cost, section/location, and total inventory replacement cost. Reports shall be compatible with Microsoft Excel or an equivalent Government-approved spreadsheet application. The Government will not provide a sample report template. All final reports and required corrections must be completed by February 28. Reports submitted after that deadline will not meet the stated requirement. 8. Contractor equipment, software, and access Question: May the Contractor use its own handheld scanners and inventory software? Are specific scanning devices, software platforms, or VA network integrations required? What security and access requirements apply? Government Response: The Contractor may use its own scanners and inventory software, provided they meet the SOW requirements. 9. Pharmacy inventory scope and storage locations Question: Does outpatient inventory include satellite pharmacies and other pharmacy-controlled storage locations? Are medications stored in specialized or low-temperature refrigerators included? Government Response: The number and type of outpatient and satellite pharmacy locations vary by facility. All applicable medications under pharmacy control, including medications stored in specialized refrigeration units, shall be included unless specifically excluded by the SOW. The Contractor shall coordinate the inventory areas with each facility. 10. Incumbent contractor and historical contract information Question: Is this a new requirement or a recompete? If there is an incumbent contractor, what is the previous contract number, awarded contract value, and total price? Government Response: Professional Inventory Control Systems INC, 36C24926P0139, $19,200.00, $19,200.00. 11. Subcontractor participation and on-site staffing Question: May a small business prime contractor use a subcontractor to perform physical inventories under the prime's management and quality control? Must the prime contractor provide its own personnel on-site during each inventory? Government Response: No 12. Past performance evaluation Question: Will an offeror without directly relevant past performance receive a Neutral rating rather than an Unacceptable rating? Government Response: Neutral 13. Insurance and bonding Question: What insurance coverage and bonding requirements apply, including minimum limits, when evidence must be submitted, and whether a subcontractor's insurance may satisfy any part of the requirement? Government Response: Please reference the SOW. 14. Service Contract Labor Standards wage determination Question: The SOW references an applicable Department of Labor wage determination, but none is attached. Which wage determination applies to this requirement? Government Response: No Wage Determination applies. 15. Implementation plan submission Question: Is the implementation plan required with the technical quotation, or may it be submitted after contract award? Government Response: No 16. Solicitation status and amendments Question: Are the posted SOW and evaluation criteria final for quotation purposes, or does the Government anticipate issuing an amendment to clarify or revise the requirements? Government Response: Final. | 49% | Combined Synopsis | 11/15/2026 |
Department of Veterans Affairs Veterans Health Administration Program Contracting Activity Central (PCAC) November 4, 2026 PRESOLICITATION NOTICE Initial Outfitting, Transition, and Activation Services in support of the North Kansas OPC 100% SDVOSB SET ASIDE This is a Pre-Solicitation Notice that the Veterans Health Administration (VHA) intends to solicit quotes to provide non-personal Initial Outfitting, Transition, and Activation (IOT&A) services for the North Kansas Outpatient Clinic (OPC). This requirement supports VHA's mission by providing contractor support services to help bring the hospital into full planned operations that will provide health care services to Veterans. This will be a firm-fixed-price contract with an estimated Period of Performance of 38-months. This project proposes to lease an approximately 102,736 NUSF replacement and expanded Outpatient Clinic in the vicinity of Kansas City, MO, including 700 parking spaces. The new facility allows for decompression of the Kansas City VAMC. The lease would allow VA to enhance outpatient services by closing space gaps identified in the SCIP process. The new lease would expand the current Primary Care space, allowing for the full implementation of the PACT model of care delivery, improving operational efficiencies and the Veteran experience. The newly leased right-sized, state-of-the-art, energy-efficient health care facility would provide Primary Care, Mental Health, Specialty Care, Outpatient Surgery and Ancillary services to Veterans in the Kansas City area. The scope includes project support for planning, activating, outfitting, and transitioning the staff and Veterans/patients associated with the project. The scope of services includes Comprehensive Project Management, Comprehensive Interior Design, FF&E, and Space Planning Support; CONOPS and Transitioning Planning; Acquisition Support Services to include package development, Activation, Delivery, Relocation and Installation, Training, and Turnover and Post Occupancy Support for the identified project. This requirement will be set-aside 100% for Service-Disabled Veteran-Owned Small Businesses (SDVOSBs) using FAR Part 12 and 37. To be eligible for an SDVOSB set aside under VA s Veterans First Contracting Program, SDVOSBs must: be verified by the Department of Veterans Affairs (VA) as SDVOSB (see https://search.certifications.sba.gov/ for details) and meet the small business size standard for NAICS 541614. The solicitation is anticipated to be posted on Contract Opportunities for download on or about 19 November 2026. Potential offerors are advised that there may be truncated response time on the solicitation that will follow this Pre-Solicitation notice. Anticipated closing date of the solicitation will be 18 December 2026. Solicitation initial posting date and the closing date are subject to change as necessary. Any questions for this Pre-solicitation notice should be sent via e-mail to both Katherine.Johnson6@va.gov and Kathleen.Klotzbach@va.gov. No telephone requests/questions will be accepted. This Pre-Solicitation notice does not constitute a request for proposals. P.O.C: Katherine.Johnson6@va.gov, Contract Specialist and Kathleen.Klotzbach@va.gov, Contracting Officer | 49% | Pre-Solicitation | 12/18/2026 |
Additional Details
Solicitation Number
SAQMMA15R0191
Archive Date
Dec 31, 2015