Notice ID: 4e6861abbb45f2e3f3bff89d446e2c0aCombined Synopsis/Solicitation
OPTICAL CRYOGENIC SYSTEM
Archived on July 26, 2012. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 9:30 PM UTC+02:00
- Posted
- July 10, 2012
- Notice type
- Combined Synopsis/Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 334516: Analytical Laboratory Instrument Manufacturing
- Agency
- Department of CommerceNATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY
Notice details
- Office
- DEPT OF COMMERCE NIST
- Place of performance
- 100 BUREAU DRIVE, Gaithersburg, 20899
- PSC
- 66: INSTRUMENTS AND LABORATORY EQPT
- Last updated
- Dec 5, 2025
Identifiers
- Solicitation number
- SB1341-12-RQ-0355
- Notice ID
- 4e6861abbb45f2e3f3bff89d446e2c0a
Description
AMENDMENT 2: THE PURPOSE OF THIS AMENDMENT IS TO ANSWER QUESTIONS AND AMEND SPECIFICATION NUMBER 8. QUESTION 1: IS THE 15 MINUTE COOLDOWN TO 10K A STRICT REQUIREMENT? ANSWER 1: YES IT IS. QUESTION 2: IS THE AUTOMATION A STRICT REQUIREMENT? ANSWER 2: THE FULLY AUTOMATED TEMPERATURE CONTROL OVER THE WHOLE TEMPERATURE RANGE VIA COMPUTER INTERFACE IS A STRICT REUQIREMENT, HOWEVER, AUTOMATION FOR THE PUMP IS NOT. SPECIFICATION 8 IS AMENDED BELOW. QUESTION 3: DOES THE CRYOSTAT NEED A CONSTANT SUPPLY OF LN2 AND LIQUID HELIUM: ANSWER 3: THE CRYOSTAT WILL USE A CONSTANT SUPPLY OF CRYOGEN TO RUN EXPERIMENTS AT A DESIRED TEMPERATURE. IT WUILL USE EITHER LN2 (>77K) ONLY OR L HE (>4 K) FOR MEASUREMENTS. THE CRYOGEN IS SEPARATE AND THE CRYOGEN SUPPLY IS NOT PART OF THIS SOLICITATION. QUESTION 4: ARE THERE TWO SEPARATE HOSES FOR THE TWO CRYOGENS (HELIUM AND LN2)? ANSWER 4: NO QUESTION 5: IS A TRIPLE WALLED HOSE REQUIRED IN WHICH THE LIQUID NITROGEN IS KEEPING THE LIQUID HELIUM SUB-COOLED? ANSWER 5: NO SPECIFICATION 8 IS HEREBY AMENDED AS FOLLOWS: FROM: COOL-DOWN AND PUMP-OUT MUST BE FULLY AUTOMATED AND CONTROLLED VIA COMPUTER INTERFACE. TO: COOL-DOWN MUST BE FULLY AUTOMATED AND CONTROLLED VIA COMPUTER INTERFACE. PUMP-OUT MAY BE MANUALLY CONTROLLED OR FULLY AUTOMATED. ALL OTHER TERMS REMAIN UNCHANGED.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
No documents available.
Lifecycle
Solicitation:
SB1341-12-RQ-0355- Combined Synopsis
- 3×Combined SynopsisCurrentJun 22, 2012
OPTICAL CRYOGENIC SYSTEM
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
SB1341-12-RQ-0355
Archive Date
Jul 26, 2012