Notice ID: c7108302e8224c22a3ba9c73089e63bbSolicitationArchived
Chamber Tubing
Archived on July 10, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 5:00 PM PDT
- Posted
- June 25, 2026
- Notice type
- Solicitation
- NAICS
- NAICS 3333 Commercial and Service Industry Machinery Manufacturing (reported as 333300)
- Agency
- Department of Energy
Notice details
- Office
- SLAC Natl Accel Lab -DOE Contractor
- Place of performance
- Menlo Park, 94025
- PSC
- AJ12: R&D- GENERAL SCIENCE/TECHNOLOGY: PHYSICAL SCIENCES (APPLIED RESEARCH/EXPLORATORY DEVELOPMENT)
- Last updated
- Oct 29, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- SLAC_366191_BoosterChamber_Tubing
- Notice ID
- c7108302e8224c22a3ba9c73089e63bb
Description
SLAC National Accelerator Laboratory is operated by Stanford University for the Department of Energy. As a management and operating contractor, subcontracts awarded by the Laboratory are not Federal procurements, and are not directly subject to the Federal Acquisition Regulations in 48 CFR. Nonetheless, certain Federal laws, Executive Orders, and regulations may affect our DOE approved purchasing system, as required by statute, regulation, or contract terms and conditions. Please review the quote and provide your best and final offer for both price and lead-time. Kindly also have the quotation revised to today’s date and address the quote to my attention. The follow has been attached for you to complete and review: Representations & Certifications Rider Confirm Attached SLAC terms are accepted: FP Commercial Supplies-Services T&Cs (August 2023) Drawing_PF-444-161-25_Rev1 SC-700-8660-47 Rev.19 SC-700-866-49 Rev. 5 INJ-98 Rev.6 Quote# Q_6425_Rev_5 Required item(s) listed below: PF-444-161-25_Rev.01: Length of Tube 17.973 inches – QTY: 90 PF-444-161-25_Rev.01: Length of Tube 4.89 inches – QTY: 36 PF-444-161-25_Rev.01: Length of Tube 22.535 inches – QTY: 9 PF-444-161-25_Rev.01: Length of Tube 25.095 inches – QTY: 9 PF-444-161-25_Rev.01: Length of Tube 20.084 inches – QTY: 8 PF-444-161-25_Rev.01: Length of Tube 17.525 inches – QTY: 7 Quote is for product only; no on-site services permitted. Source selection will be based on Lowest Price and Technically Acceptable Method (LPTA). Technical evaluation criteria are as follows: Material: 316L seamless stainless steel, redrawn from tube produced to ASTM A269 OR 347/316L welded tubes shall be made from strip conformed to ASTM A240/A240M, with surface finish per ASTM A480/A480M, Finish 2B or better. Final product to have outside tube diameter shall be 1.875? +0.000?/?0.007?, and wall thickness shall be 0.012? ±0.001?. (Drawing PF-444-161-25) Overall cut-tube length deviation shall be within ±0.005? from the nominal specified value. Tubes shall be straight to a maximum deviation of 0.001? per 1.0? of tube length. (Applicable to tubing made of a flat strip only) The weld bead shall be a butt joint fusion TIG weld without the use of filler metal. During welding, an inert gas inside purge shall be used along with an inert gas trailing shield on the outside. Tolerance on weld bead projection after planishing shall not exceed 0.002?. Tubing shall be cut to final length using a method that does not deform or collapse the tube wall, and all resulting sharp edges shall be immediately deburred, producing a maximum radius of 0.005?. (Refer to SC-700-866-49) No silicon or sulfur-based cutting fluids shall be used as machining lubricants. Cutting fluids must be approved, as specified in the latest revision of SC-700-866-47. Surface finish of the final product shall not exceed 16 ?in Ra (0.40 ?m Ra) on the tube inner surface and shall not exceed 63 ?in Ra (1.6 ?m Ra) on the tube outer surfaces. Electropolished per ASTM B912 if mechanical polishing was used to achieve required surface finish. Passivated per ASTM A967 (corrosion resistance). No operation causing contaminants to be embedded into vacuum surfaces shall be permitted. Grinding with resin-bonded wheels, emery cloth, crocus cloth, or similar abrasives on vacuum surfaces is prohibited. Cleaning of vacuum surfaces at all stages shall use only approved solvents and methods; chlorinated, brominated, and sulfur-based solvents are prohibited. Fabricated in full accordance with INJ-98 Rev. 6, with quality records and inspections outlined. Please provide a price and lead time quotation by COB 7/3/2026. Please be advised that the requirement was also posted on SAM.gov. Send quote to marissat@SLAC.stanford.edu. Is there any room for additional discount such as for Academic, ICPT, GSA, or Government Institutions? If possible, please provide a link to your webpage for published price list to substantiate for the prices quoted. Buy American Act Certification (BAA) applies to items that have a unit price that is over $15,000. Representations & Certifications Rider is required. Once completed the Reps and Certs is valid for one year until renewal. If you have already completed one within the year please disregard. Otherwise, please complete and return. Please include in your proposals the Harmonized Tariff Schedule (HTS Code) & ECCN if applicable. All subcontractors are required to register in the System for Award Management (www.sam.gov). The resulting purchase order will be issued on a fixed price basis. SLAC National Accelerator Laboratory Terms and Conditions for Fixed Price Commercial Supplies and Services (Rev. August 2023) will be made a part of the resulting order. Payment Terms will be NET-30 (SLAC is unable to do advance payments and or Prepayments). Freight terms will be FOB Destination Prepaid and Add Foreign Vendors Shipments will be made CIP SLAC, Menlo Park, and Duty Unpaid. You are requested to mark and identify proprietary/confidential information provided in response to the solicitation. Contact me directly with any questions. Kind regards, Marissa Tanomrat Procurement Commodities Team SLAC National Accelerator Laboratory 2575 Sand Hill Road Menlo Park, CA 94025 Email: marissat@slac.stanford.edu
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Documents
Files (7)
- Download
A1.e_INJ-98 Rev.6_Injector Booster Vacuum Chamber Tubing Tech Spec Rev.6.pdf
536 KBAdded in Solicitation version 3Posted - Download
A1.d_SC-700-866-49 Rev. 5_Klystron and Vacuum Components Machining, Deburring, Polishing.pdf
156 KBAdded in Solicitation version 3Posted - Download
A1.c_SC-700-8660-47 Rev.19_Spec. KLY&VAC Components Machining Fluids.pdf
86 KBAdded in Solicitation version 3Posted - Download
A1.b_Drawing_PF-444-161-25_Rev1.pdf
102 KBAdded in Solicitation version 3Posted - Download
Reps and certs Rider - September 2022.pdf
983 KBAdded in Solicitation version 3Posted - Download
Fixed_Price_Commercial_Supplies_and_Services_Subcontract_Aug2023.pdf
325 KBAdded in Solicitation version 3Posted - Download
01. BAA_Certification_08.29.2023_(D5) (1).pdf
570 KBAdded in Solicitation version 3Posted
Lifecycle
- 3Version 3SolicitationArchivedCurrent
Chamber Tubing
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
SLAC National Accelerator Laboratory is operated by Stanford University for the Department of Energy. As a management and operating contractor, subcontracts awarded by the Laboratory are not Federal procurements, and are not directly subject to the Federal Acquisition Regulations in 48 CFR. Nonetheless, certain Federal laws, Executive Orders, and regulations may affect our DOE approved purchasing system, as required by statute, regulation, or contract terms and conditions. AMENDMENT 01 Hi, The following Addendum is being issued for the subject Request for Quotation: 368931_DispersiveMirror_SAMPOST Clarification Questions: Yes a brand Name or Equal product would be acceptable. Certain manufacturers designate the primary HR/GDD coating on S2 rather than S1, while maintaining the specified S1 surface quality (5/3 × 0.04) and flatness (PV < λ/10). Would this configuration be considered technically acceptable, provided the optic meets all other specified performance and dimensional requirements? As long as the HR side meets requirements, then yes. Angle of Incidence (AOI): Would an optic specified for an operating AOI range of 5°–6° satisfy the stated 5° AOI requirement? Yes, 5 degrees acceptable. Please provide a price and lead time quotation by COB 11/9/2026. This Addendum modifies the Request for Quotation and must be acknowledged. Failure to acknowledge all addenda could make your proposal non-responsive. Please confirm that the submitted proposal is not changed because of this addendum. If proposal sent is revised because of this, please submit the revised proposal. The following changes are hereby made to the appropriate documents containing the above-mentioned Request for Quotation (RFQ). All other terms and conditions of the RFQ remain the same. Kind regards, Marissa Tanomrat Procurement Commodities Team SLAC National Accelerator Laboratory 2575 Sand Hill Road Menlo Park, CA 94025 Email: marissat@slac.stanford.edu Please review the listed requirements and provide your best and final offer for both price and lead-time. The follow has been attached for you to complete and review: Representations & Certifications Rider Confirm Attached SLAC terms are accepted: FP Commercial Supplies-Services T&Cs (August 2023) Confirm Attached SLAC terms are accepted: SLAC General Terms and Conditions Supplemental Rider (Rev. August 2026) Request for Quote: Required item(s) listed below: HD120+AR Ultra Precision (FS 38.1mm dia. X 12.7mm thk. Pl (192)) QTY: 150 CM2699 (FS 38.1mm dia. X12.7mm thk,PL (192) QTY: 80 Quote is for product only; no on-site services permitted. Source selection will be based on Lowest Price and Technically Acceptable Method (LPTA). Technical evaluation criteria are as follows: Highly Dispersive Mirrors HD120+AR Ultra Precision (FS 38.1mm dia. X 12.7mm thk. Pl (192)) Features: Optics Type: Highly Dispersive Mirror Design Name: HD120 Central Wavelength CW (nm): 1030 Minimal Wavelength WLmin (nm): 935 Maximal Wavelength WLmax (nm): 1125 GDDr (fs²): -200 Angle of Incidence AOI (deg): 5 Minimal Reflectance Rmin (%): 99.9 Polarization: p Surface 2: AR Stress Compensation Substrate (pre-coat spec.) Material: Corning 7980 0F Dimensions: 38.1mm dia. x 12.7mm thk. Diameter tolerance: +0/-0.1mm Thickness tolerance: +/-0.1mm Configuration: Pl/Pl Radius: S1&S2: Infinity S1 & S2 polished, other surfaces fine ground Surface quality: S1: 5/3x0.04, S2: Commercial polish Flatness: S1: PV<1/10L@632.8nm within CA, S2 NA Clear aperture: >80% Parallelism: <10arcmin Chamfer: Break sharp edges Standard: ISO 10110 Marking: UFI log and arrow to S1, 6-digit serial number tracked Qty 150. Chirped mirrors: CM2699 (FS 38.1mm dia. x 12.7mm thk. Pl (192)) Features: Optics Type: Chirped Mirror Design Name: CM2699 Central Wavelength CW (nm): 1035 Minimal Wavelength WLmin (nm): 950 Maximal Wavelength WLmax (nm): 1120 GDDr (fs²): -50 Minimal Reflectance in Average Raver,min (%): 99.9 Angle of Incidence AOI (deg): 5 Polarization: p Surface 2: AR Stress Compensation Substrate (pre-coat spec.) Material: Corning 7980 0F Dimensions: 38.1mm dia. x 12.7mm thk. Diameter tolerance: +0/-0.1mm Thickness tolerance: +/-0.1mm Configuration: Pl/Pl Radius: S1&S2: Infinity S1 & S2 polished, other surfaces fine ground Surface quality: S1: 5/3x0.04, S2: Commercial polish Flatness: S1: PV<1/10L@632.8nm within CA, S2 NA Clear aperture: >80% Parallelism: <10arcmin Chamfer: Break sharp edges Standard: ISO 10110 Marking: UFI log and arrow to S1, 6-digit serial number tracked Qty 80 Past performance: The Offeror will be evaluated for successful completion and delivery of parts of a similar size and complexity in the last four (4) years based on the documentation submitted on prior manufacturing and test plans. SLAC will consider the historical reliability and performance of such parts integration into SLAC systems, if available. Manufacturing capabilities and capacity (including lower-tier subcontractors) Offeror shall submit a manufacturing plan demonstrating that the Offeror’s resources and project management support are adequate to deliver the system on schedule, using a quality-controlled manufacturing process, adequate procurement capabilities, fabrication facilities and testing facilities. Please provide a price and lead time quotation by COB 11/5/2026 Please be advised that the requirement was also posted on SAM.gov. Send quote to marissat@SLAC.stanford.edu. Is there any room for additional discount such as for Academic, ICPT, GSA, or Government Institutions? If possible, please provide a link to your webpage for published price list to substantiate for the prices quoted. Buy American Act Certification (BAA) applies to items that have a unit price that is over $15,000. Representations & Certifications Rider is required. Once completed the Reps and Certs is valid for one year until renewal. If you have already completed one within the year please disregard. Otherwise, please complete and return. Please include in your proposals the Harmonized Tariff Schedule (HTS Code) & ECCN if applicable. All subcontractors are required to register in the System for Award Management (www.sam.gov). The resulting purchase order will be issued on a fixed price basis. SLAC National Accelerator Laboratory Terms and Conditions for Fixed Price Commercial Supplies and Services (Rev. August 2023) and SLAC General Terms and Conditions Supplemental Rider (Rev. August 2026) will be made a part of the resulting order. Please mark up terms and conditions if you wish to negotiate. No mark ups mean that you accept SLAC Terms and Conditions. Payment Terms will be NET-30 (SLAC is unable to make advance payments and or Prepayments). For Small Business, SLAC offers Net 15. Freight terms will be FOB Destination Prepaid and Add Foreign Vendors Shipments will be made CIP SLAC, Menlo Park, and Duty Unpaid. You are requested to mark and identify proprietary/confidential information provided in response to the solicitation. Contact me directly with any questions. Kind regards, Marissa Tanomrat Procurement Commodities Team SLAC National Accelerator Laboratory 2575 Sand Hill Road Menlo Park, CA 94025 Email: marissat@slac.stanford.edu | 74% | Solicitation | 11/05/2026 |
The True Silicone DLP Printing Platform from Los Alamos National Laboratory allows for more geometries in producing genuine silicone parts, gaskets, lattices, prosthetic components or microfluidic devices on an off-the-shelf desktop printer typically required by specialty extrusion equipment. The result is a material whose polymer backbone is built entirely of silicon-oxygen bonds rather than the carbon-based linkages that quietly compromise so-called silicones on the market today. The True Silicone DLP Printing Platform unlocks that capability through a precursor resin and a paired printing workflow that together deliver real silicone parts free of metal catalyst residues, with tunable porosity, geometric complexity and the aging stability that demanding applications require. How it Works The platform begins with a printable resin that blends a polymerizable scaffold with a curable siloxane component, along with a photoinitiator and a small amount of a light-absorbing dye to control polymerization depth. A standard DLP printer cures the acrylic scaffold layer by layer to lock the geometry in place, after which the part is heated so the siloxane oligomers crosslink into a continuous silicone network alongside the scaffold. A wash in ethanol, water or ammonium hydroxide then dissolves the sacrificial scaffold, leaving behind a pure silicone object whose polymer backbone consists solely of silicon–oxygen bonds and retains a porous structure where the sacrificial scaffold was removed. Technology Description At its core, the True Silicone DLP Printing Platform relies on a printable resin that combines two chemistries chosen to work in tandem: an acrylic component that polymerizes quickly under light to hold the printed geometry, and a silicone component that cures more slowly into the final material. During printing, these two phases remain mixed but separate into interwoven networks, an arrangement that lets the silicone retain the intended shape once the acrylic is later removed. A small amount of light-absorbing dye keeps polymerization confined to the intended pattern, and the resin is engineered to flow and cure reliably on standard DLP hardware. After printing, the part is gently heated to complete formation of the silicone network, then soaked in an alcohol or water-based wash, sometimes assisted by UV light or a mild base, to dissolve away the sacrificial acrylic scaffold. What remains is a silicone object whose polymer backbone is built entirely from silicon-oxygen bonds, with mechanical properties and a controllably porous structure whose open pores can be accessed after printing to imbue the silicone with new functionalities, for example by infusing conductive or otherwise active materials. The overall workflow is compatible with inexpensive commodity printers and lends itself to scaling through emerging light-based manufacturing techniques, while the same scaffold-and-wash strategy offers a template for printing other materials that have historically been difficult to fabricate by photopolymer methods. Advantages Produces true silicone with a continuous silicon-oxygen backbone, avoiding the aging and chemical-compatibility weaknesses of pseudo-silicone alternatives Runs on widely available, low-cost DLP printers rather than specialized direct-ink-write equipment Cures whole layers at once, delivering meaningfully higher throughput than extrusion-based silicone printing Yields parts free of residual metal catalysts, simplifying regulatory and biocompatibility pathways Allows tunable mechanical properties and porosity through resin ratios and porogenic solvent choice Extensible in principle to other material systems that currently resist photopolymer printing through the same sacrificial-scaffold approach Market Applications Medical and Consumer Health (prosthetics, wearable devices, soft implants) Sensing (stretchable circuits, soft robotics components) Microfluidics (lab-on-chip components, custom flow cells) Aerospace and Defense (cushioning foams, vibration-isolation components, sealing parts) Optics and Photonics (soft lenses, light-guiding elements) Consumer and Household Goods (kitchenware, mattresses, apparel components) Development Status: TRL 4 U.S. Patent No. 11,939,415 LA-UR-26-24892 LANL Tech Partnerships: Unlock the Innovative Potential Los Alamos National Laboratory offers a wide range of cutting-edge technologies and capabilities that may provide your company with a competitive edge in the market and unlock the innovative potential that can enhance, refine, and revolutionize your products. LANL’s licensing program focuses on moving inventions developed by our researchers to commercial innovations. Patented and patent pending inventions and copyrighted software are available to existing and start-up companies through exclusive and non-exclusive licensing agreements. For specific discussions, please contact licensing@lanl.gov. Note: This is not a call for external services for the development of this technology. https://www.lanl.gov/engage/collaboration/feynman-center/partner-with-us/licensing-technology m.lanl.gov/tech-search | 40% | Special Notice | 01/07/2027 |
SBIR Phase I Proposal #B201A-0017. Laser-based In-situ Testing for Microbes with Ultraviolet Spectroscopy (LITMUS). Photon Systems Inc. | 39% | Awarded | Open |
Additional Details
Solicitation Number
SLAC_366191_BoosterChamber_Tubing
Archive Date
Jul 10, 2026
Office Address
Menlo Park, CA, 94025