SLAC CUIR Subproject 1 – IR-12 Substation SCADA Hardware Installation Sources Sought Notification
Archived on January 23, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 5:00 PM UTC−08:00
- Posted
- December 16, 2025
- Notice type
- Sources Sought
- Agency
- Department of Energy
Notice details
- Office
- SLAC Natl Accel Lab -DOE Contractor
- Place of performance
- Menlo Park, California, 94025
- Last updated
- Aug 21, 2026
Identifiers
- Solicitation number
- SLAC_RFP_360055
- Notice ID
- 30da91a1367f4746b05aaccabc4e839d
Description
This is a Sources Sought Notice to identify construction contractors capable of completing the planned IR-12 Substation SCADA Hardware Installation under Subproject 1 of the Critical Utilities Infrastructure Revitalization (CUIR) Project. This is not a solicitation for proposal or quotations and no award will be made from this Notice. SLAC intends to issue a formal solicitation later based on responses from this Source Sought Notice.
BACKGROUND
Many of SLAC’s utilities were installed in the 1960s as part of the original laboratory construction. These utilities were not designed to support the experimental parameters needed for science research today and in the future. The purpose of the Critical Utilities Infrastructure Revitalization (CUIR) Project is to modernize utility infrastructure to provide reliable and sustainable operations, enabling SLAC National Accelerator Laboratory (SLAC) to remain mission-ready and enhance the impact of Department of Energy (DOE) scientific programs.
PLANNED SCOPE AND DESCRIPTION OF SERVICES
SLAC is seeking the services of a qualified construction contractor to complete the scope in the attached Statement of Work (SOW), which includes demolition of existing equipment and installation of Government Furnished Property (GFP) such as pre-fabricated switchgear door plates, communication devices, and new Circuit Breaker Remote Operation Panel (CBROP). The attached SOW includes a base and optional scope.
SOURCES SOUGHT RESPONSE
A required qualification for this project includes that the Offeror is at least 5 years in business and has at least one office within 200 miles of SLAC for at least 3 years.
Interested construction contractors with the skills, capability, workload capability, and ability to obtain bonding to complete the planned project scope are invited to submit a written response to this Sources Sought Notice. Please provide the following information:
- Company Name
- Name, telephone number, and email address of a company point of contact who has the authority and knowledge to clarify responses.
- Bonding capacity
Please provide your response to Quyen Weng at quyen@slac.stanford.edu by 5pm PST on January 08, 2026.
SOURCES SOUGHT DISCLAIMER:
Please note that any responses to this sources sought posting is purely on a voluntary basis. SLAC is not requesting a proposal, any pricing, or any other information that could be considered confidential or proprietary to be submitted in response to this posting or any part of this posting. Any submissions that contain pricing, proprietary information, or confidential information will be discarded by SLAC.
Award Overview
Contacts
Contracting Officer
Primary Contact
Documents
Showing 10 of 36 items
Document | Source | Agency | Posted Date | File Size | Actions | |
|---|---|---|---|---|---|---|
| Sources Sought | ENERGY, DEPARTMENT OF | Dec 16, 2025 | 1.08 MB | |||
| Sources Sought | ENERGY, DEPARTMENT OF | Dec 16, 2025 | 726.86 KB | |||
| Sources Sought | ENERGY, DEPARTMENT OF | Dec 16, 2025 | 2.12 MB | |||
| Sources Sought | ENERGY, DEPARTMENT OF | Dec 16, 2025 | 734.66 KB | |||
| Sources Sought | ENERGY, DEPARTMENT OF | Dec 16, 2025 | 674.63 KB | |||
| Sources Sought | ENERGY, DEPARTMENT OF | Dec 16, 2025 | 645.64 KB | |||
| Sources Sought | ENERGY, DEPARTMENT OF | Dec 16, 2025 | 776.04 KB | |||
DRAFT_B2_03.07_C03_B726_Region_12_12KV_Switchgear_Demolition_Drawings.pdf | Sources Sought | ENERGY, DEPARTMENT OF | Dec 16, 2025 | 70.57 MB | ||
| Sources Sought | ENERGY, DEPARTMENT OF | Dec 16, 2025 | 638.13 KB | |||
| Sources Sought | ENERGY, DEPARTMENT OF | Dec 16, 2025 | 740.6 KB |
Showing 1 to 10 of 36 results
Lifecycle
SLAC_RFP_360055- Market Research
Pre-solicitation or formal solicitation typically follows within 30–180 days. (estimate)
- Market ResearchCurrentDec 16, 2025
SLAC CUIR Subproject 1 – IR-12 Substation SCADA Hardware Installation Sources Sought Notification
Similar Opportunities
Additional Details
Solicitation Number
SLAC_RFP_360055
Archive Date
Jan 23, 2026
Office Address
Menlo Park, CA, 94025