SLAC LCLSII-HE Anchor and Support Stands Installation
Archived on November 14, 2025. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 5:00 PM PDT
- Posted
- October 22, 2025
- Notice type
- Sources Sought
- Set-aside
- Women-Owned Small Business
- Agency
- Department of Energy
Notice details
- Office
- SLAC Natl Accel Lab -DOE Contractor
- Place of performance
- Menlo Park, California, 94025
- Last updated
- Nov 6, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- SLAC_RFP_360859
- Notice ID
- 53fd9392be7c446bb652b3847c31a9bc
Description
THIS IS FOR SOURCES SOUGHT ONLY, DO NOT SUBMIT BIDS. While the draft documents have been included with this post, the RFP has not been released. Interested vendors should express their interest on the Interested Vendors List through this SAM.gov posting, or by emailing the primary Point of Contact.
THIS PROJECT IS A WOMEN-OWNED SMALL BUSINESS (WOSB) PROGRAM SET-ASIDE.
SLAC LCLSII-HE Anchor and Support Stands Installation
SLAC is posting this Sources Sought to identify potential women-owned small business contractors for the upcoming LCLSII-HE Anchor and Support Stands Installation project. This project has been designated a women-owned small business set-aside, and only women-owned small business contractors will be considered. A draft version of the RFP has been included for reference. Required qualifications for this project include the following:
- An established local office in the San Francisco Bay Area for a minimum of three years. The San Francisco Bay Area is defined as within the following 10 counties: Santa Clara, San Mateo, San Francisco, Alameda, Contra Costa, Marin, Napa, Sonoma, Solano and Santa Cruz counties
- Previous experience working on federally funded projects installing scientific components
SLAC National Accelerator Laboratory (SLAC) is operated by Stanford University as a contractor for the United States Department of Energy (DOE) Office of Science (SC). SLAC supports a large national and international community of scientific users performing innovative research in support of the DOE mission.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Documents
Files (41)
- Download
DRAFT_B2_00.1_Cover_Letter.pdf
751 KBAdded in Sources Sought version 1Posted - Download
DRAFT_B2_00.2_SLAC_Entry_REAL_ID_MAY2025.pdf
769 KBAdded in Sources Sought version 1Posted - Download
DRAFT_B2_01_Section_A_(Subcontract_Form).pdf
744 KBAdded in Sources Sought version 1Posted - Download
DRAFT_B2_02_Section_B_(Supplies_or_Services_and_Price_Costs).pdf
709 KBAdded in Sources Sought version 1Posted - Download
DRAFT_B2_03.0_Section_C_(Specifications_SOW).pdf
709 KBAdded in Sources Sought version 1Posted - Download
DRAFT_B2_03.01_SOW_HE-1.3-SW-1413.pdf
5.6 MBAdded in Sources Sought version 1Posted - Download
DRAFT_B2_03.02_LCLSII-HE-1.3-PP-1100.pdf
1.2 MBAdded in Sources Sought version 1Posted - Download
DRAFT_B2_03.03_LCLSII-HE-1.3-PP-1101.pdf
1.2 MBAdded in Sources Sought version 1Posted - Download
DRAFT_B2_03.04_LCLSII-HE-1.3-PM-1394.pdf
1.2 MBAdded in Sources Sought version 1Posted - Download
DRAFT_B2_03.05_23-049_BIO_Drawings_LCLS-II_HE_Structural_Install_SSA_Racks_&_Wave_Guides.pdf
5.2 MBAdded in Sources Sought version 1Posted - Download
DRAFT_B2_03.06_22-196_BIO_Drawings_LCLSII-HE_Waveguide_Conduit_Penetration_Base_Supports_Installation.pdf
1.9 MBAdded in Sources Sought version 1Posted - Download
DRAFT_B2_03.07_21-255 BIO_Document_LCLS-II-HE_Cryomodule_Install_&_Anchorage.pdf
2.0 MBAdded in Sources Sought version 1Posted - Download
DRAFT_B2_03.08_24-092_BIO_Document_LCLS-II-HE_BR3B_EXT_Anchorage.pdf
10 MBAdded in Sources Sought version 1Posted - Download
DRAFT_B2_03.09_25-145_LCLS-II-HE_AS_BTL_Anchorage.pdf
94 MBAdded in Sources Sought version 1Posted - Download
DRAFT_B2_03.10_DSG-000007866_HE_L4A_S7-S8_CM37-CM48.pdf
1.9 MBAdded in Sources Sought version 1Posted - Download
DRAFT_B2_03.11_DSG-000007867_HE_L4B_S8-S10_CM49-CM59.pdf
1.7 MBAdded in Sources Sought version 1Posted - Download
DRAFT_B2_03.12_DSG-000056783_CM_Stand_Anchor_HW_Kit.pdf
1.0 MBAdded in Sources Sought version 1Posted - Download
DRAFT_B2_03.13_F10037684_Fixed_Adjustable_Support_Assembly.pdf
1004 KBAdded in Sources Sought version 1Posted - Download
DRAFT_B2_03.14_F10063423_Sliding_Adjustable_Support_Assembly.pdf
990 KBAdded in Sources Sought version 1Posted - Download
DRAFT_B2_03.15_DSG-000039220_HE_L3-L4_S7_Warm_Transition.pdf
1.3 MBAdded in Sources Sought version 1Posted - Download
DRAFT_B2_03.16_SA-375-459-35_HPRF_Shield_Support_Base.pdf
872 KBAdded in Sources Sought version 1Posted - Download
DRAFT_B2_03.17_SA-375-520-80_WR650_L-Band_Waveguide_Shield_Anchor_Kit.pdf
662 KBAdded in Sources Sought version 1Posted - Download
DRAFT_B2_04_Section_F_(Deliveries_Performance).pdf
758 KBAdded in Sources Sought version 1Posted - Download
DRAFT_B2_05.0_Section_G_(General_TsCs).pdf
723 KBAdded in Sources Sought version 1Posted - Download
DRAFT_B2_05.1_Fixed_Price_Construction_March2024.pdf
975 KBAdded in Sources Sought version 1Posted - Download
DRAFT_B2_06_Section_H_(Special TsCs).pdf
718 KBAdded in Sources Sought version 1Posted - Download
DRAFT_B2_07.0_Section_J_(List_of_Attachments).pdf
704 KBAdded in Sources Sought version 1Posted - Download
DRAFT_B2_07.01_DBA_WD_CA20250018_26SEPT2025_Mod_18.pdf
4.2 MBAdded in Sources Sought version 1Posted - Download
DRAFT_B2_07.02_Subcontractor_Form_IIPP_052121.pdf
738 KBAdded in Sources Sought version 1Posted - Download
DRAFT_B2_07.03_Work_Classification_Form_360859.pdf
1.4 MBAdded in Sources Sought version 1Posted - Download
DRAFT_B2_07.4_SF1413.pdf
638 KBAdded in Sources Sought version 1Posted - Download
DRAFT_B2_07.5_SubcontractorFormSQF.pdf
776 KBAdded in Sources Sought version 1Posted - Download
DRAFT_B2_07.6_NTP_Submittal_Checklist_061424.pdf
1.1 MBAdded in Sources Sought version 1Posted - Download
DRAFT_B2_07.7_Final_Inspection_Report.pdf
701 KBAdded in Sources Sought version 1Posted - Download
DRAFT_B2_07.8_Construction_Subcontracts_Final_Release.pdf
769 KBAdded in Sources Sought version 1Posted - Download
DRAFT_B2_08.0_Section_K_(Rep_and_Certs).pdf
727 KBAdded in Sources Sought version 1Posted - Download
DRAFT_B2_08.1_Reps_and_Certs_Supplement.pdf
661 KBAdded in Sources Sought version 1Posted - Download
DRAFT_B2_09.0_Section_L_ITO_RFP_360859.pdf
876 KBAdded in Sources Sought version 1Posted - Download
DRAFT_B2_09.1_Section_L_Attachment_A_Proposal_Breakdown_Sheet.pdf
663 KBAdded in Sources Sought version 1Posted - Download
DRAFT_B2_09.2_Section_L_Attachment_B_SLAC_Question&Answer_Log_(RFI).pdf
663 KBAdded in Sources Sought version 1Posted - Download
DRAFT_B2_10_Section_M_Eval_Criteria_RFP_360859.pdf
842 KBAdded in Sources Sought version 1Posted
Lifecycle
- 1Version 1Sources SoughtArchived
SLAC LCLSII-HE Anchor and Support Stands Installation
- 3Version 3Sources SoughtArchivedCurrent
SLAC LCLSII-HE Anchor and Support Stands Installation
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
SLAC_RFP_360859
Archive Date
Nov 14, 2025
Office Address
Menlo Park, CA, 94025