SLAC Sector 11 Utilities – Design-Bid-Build
Archived on January 21, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 5:00 PM PST
- Posted
- December 19, 2025
- Notice type
- Sources Sought
- Set-aside
- No Set aside used
- NAICS
- NAICS 2371 Utility System Construction (reported as 237100)
- Agency
- Department of Energy
Notice details
- Office
- SLAC Natl Accel Lab -DOE Contractor
- Place of performance
- Menlo Park, California, 94025
- Last updated
- Nov 4, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- SLAC_RFP_362275_Sector_11_Utilities
- Notice ID
- 388a58ff39ac41a9938c6c59c959d380
Description
THIS POSTING IS FOR "SOURCES SOUGHT ONLY." PLEASE DO NOT SUMBIT BIDS. While the DRAFT RFP package has been included with this post, the RFP has NOT yet been released.
Interested Vendors should express their interest on the Interested Vendors List through this SAM.GOV posting or emailing the procurement specialist.
SLAC SECTOR 11 UTILITIES – DESIGN-BID-BUILD
The SLAC National Accelerator Laboratory (SLAC) is a U.S. Department of Energy, Office of Science (SC) laboratory that supports a large national and international community of scientific users performing cutting-edge research in support of the Department’s mission.
This project aims to expand the Lab’s current infrastructure into Area 1 of Sector 11, located between North Gallery Road and North Access Road (see picture below). The area outlined in red reflects the approximate landing point for all utilities (electrical, storm, domestic water, sanitary sewer, and communications). The trench for the helium line will solely be installed from the wall of the Klystron Gallery, crossing North Gallery Rd.
MINIMUM QUALIFICATIONS
- The Offeror’s General Contractor’s license has not been revoked within the past five (5) years.
- The Offeror’s company has not been debarred within the past five (5) years from working on any U.S. government contracts/subcontracts.
- Neither the Offeror’s firm, nor any of its owners or officers have been convicted of a crime involving the awarding of the contract of a government (U.S. Federal, State, and City) construction project, or the bidding or performance of a government contract.
- Offeror must have an established local office for a minimum of 2 years in the San Francisco Bay Area. The San Francisco Bay Area is defined as the following 10 counties: Santa Clara, San Mateo, San Francisco, Alameda, Contra Costa, Marin, Napa, Sonoma, Solano, and Santa Cruz Counties
- The Offeror must list any U.S. projects within the past five (5) years that have been terminated for default. The Offeror’s company cannot have any U.S. projects within the past five (5) years that have been terminated for default.
- The Offeror must have previous experience working at Department of Energy (DOE) and/or Department of Defense (DOD) Facilities
SCOPE
The work in this subcontract package shall include all management, oversight, labor, tools, materials, equipment, and other services needed to safely execute the work outlined in the attached BIO approved documents. Work shall be executed with minimal disruption to adjacent operational labs and in full compliance with SLAC, DOE, and ES&H standards. Provide polished concrete flooring (to be installed prior to the cleanroom being assembled)
- This scope of work includes a SLAC National Accelerator Laboratory-approved vendor to work with SLAC personnel to provide installation of the following utilities: electrical, sanitary sewer, storm drain, domestic water, and communications. The installation to be provided must include any civil and structural design required for the excavation, mounting, and installation of all piping, both above-ground or subgrade structures.
- The Subcontractor will be responsible for providing a design for tie-ins (to existing infrastructure, routing the utilities, extending from the gallery level up to the desired handoff point for future connections to be placed, and future hand-off points which may be valves, handholds, manholes, etc. Design and record drawings can be provided upon request. All utility pathways must have utility markers permanently placed over the underground lines at 25’ spacing along the hillside for ease of locating. Any site visit must be coordinated with the Project Manager, who will coordinate with others as needed.
- Domestic water shall connect to the existing 10-inch domestic water mainline between Sector 12 and 13 in the North Gallery Road and run approximately 350 feet in a northern direction up the hill on the south side of the termination location on the south side of the site.
- Sewer shall connect to the existing 6-inch sewer mainline located at a new manhole to be placed between MH-60 and MH-61 between Sector 12 and 13 in the North Gallery Road and run approximately 350 feet.
- The routing for utilities will require the use of a utility bridge to cross over the seasonal drainage swale that runs from West to East, parallel with the LINAC. The bridge shall be elevated sufficiently above the existing swale to ensure that it does not reduce the hydraulic capacity. Utilities will be placed under the bridge to minimize UV degradation and then underground per trench and utility delineation and embedment requirements. HDPE shall be used for lateral domestic water and sanitary sewer connections. PVC will not be used above ground. DR will be 26 or thicker
- Electrical design can utilize the conceptual design referenced in attachments as a guide to developing a fully constructable routing. The following 4 sub points list the equipment that will be purchased and utilized for this project. The engineering firm must work with this equipment in creating a full and complete design.
- Install one (1) GFP Eaton ISG-SD 15 kV class solid dielectric outdoor pad mounted switchgear with two (2) load interrupting switches and two (2) fault interrupting switches built per SLAC drawings: B0090-E01-0151 and B0090-E00-0166, Specification Section 261330.
- Connect GFP pad-mounted switchgear to CUIR-5 overhead armored cable in tray. Run new 5" RMC from termination box on the Klystron Gallery roof To pad-mounted switchgear. See single-line diagram on dwg. E500 for reference.
- Build underground concrete duct-bank with two (2) 5" PVC conduits. Refer to drawings E500 and E502 for references.
- Furnish and install as shown three (3) NEMA-3R hinged door 36"x36"x18" pull boxes.
- Run two (2) new overhead RMC in Klystron Gallery as shown. Provide structural support.
- Furnish and install a new 10’-long ground rod with test well and 4/0AWG bare Cu grounding conductors.
- Build a new 10'x10'x10' electrical manhole as shown on the design drawing E200.
- Build a new 8'x6'x8' electrical vault near CRMF substation mounting pad as shown on design drawing E200.
- Telecommunications will require 3 – 3” conduits to be installed for routing of fiber and coaxial cables from the gallery to the meet me point.
- A cemented open trench from the LINAC Northern wall crossing North Gallery Road, daylighting on the North side of North Gallery Rd. will be required for the future placement of helium lines. Only the engineering of the cemented open trench as well as the (recessed) steel plates to allow drivability over and future access will be required to be installed. The drain as called out in the design for the trench is to be installed under this project scope.
SOURCES SOUGHT DISCLAIMER:
Please note that any responses to this sources sought posting is purely on a voluntary basis. SLAC is not requesting a proposal, any pricing, or any other information that could be considered confidential or proprietary to be submitted in response to this posting or any part of this posting. Any submissions that contain pricing, proprietary information, or confidential information will be discarded by SLAC.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Documents
Files (34)
- Download
DRAFT_B2_01_RFP_Cover_Letter_Sector 11 Utilities.pdf
740 KBAdded in Sources Sought version 3Posted - Download
DRAFT_B2_02_RFP_Section_A_(Subcontract_Form).pdf
827 KBAdded in Sources Sought version 3Posted - Download
DRAFT_B2_03_RFP_Section_B_(Supplies_or_Services_and_Price_Costs).pdf
678 KBAdded in Sources Sought version 3Posted - Download
DRAFT_B2_04.0_RFP_Section_C_Cover_(Specs_SOW).pdf
705 KBAdded in Sources Sought version 3Posted - Download
DRAFT_B2_04.01_Sector 11 - Utilites Construction SOW 12.10.25.pdf
1.3 MBAdded in Sources Sought version 3Posted - Download
DRAFT_B2_04.02_2025-0926_Sector 11 - BIO REVIEW PROJECT MANUAL R1.pdf
16 MBAdded in Sources Sought version 3Posted - Download
DRAFT_B2_04.03_SECTOR 11 - Utilities Design IFC.pdf
28 MBAdded in Sources Sought version 3Posted - Download
DRAFT_B2_04.04_Sector 11 Sewer Calc 2025-12-15.pdf
941 KBAdded in Sources Sought version 3Posted - Download
DRAFT_B2_04.05_SLAC CRMF_Geotechnical Report_FINAL_Published.pdf
15 MBAdded in Sources Sought version 3Posted - Download
DRAFT_B2_04.06_SLAC_Sector_11-Padmount 4-Way Switchgear Assembly.pdf
6.7 MBAdded in Sources Sought version 3Posted - Download
DRAFT_B2_04.07_Seismic Calcs_PadmountSwitch_SLAC_Sector_11.PDF
3.8 MBAdded in Sources Sought version 3Posted - Download
DRAFT_B2_04.08_SLAC_Sector_11-MV_Switches.pdf
20 MBAdded in Sources Sought version 3Posted - Download
DRAFT_B2_04.09_SLAC_Sector_11-LV_Switches.PDF
13 MBAdded in Sources Sought version 3Posted - Download
DRAFT_B2_04.10_Manhole-photos.pdf
13 MBAdded in Sources Sought version 3Posted - Download
DRAFT_B2_05_RFP_Section_F_(Deliveries_Performance).pdf
694 KBAdded in Sources Sought version 3Posted - Download
DRAFT_B2_06.0_RFP_Section_G_(General_TsCs).pdf
694 KBAdded in Sources Sought version 3Posted - Download
DRAFT_B2_06.1_Fixed_Price_Construction_March2024.pdf
2.1 MBAdded in Sources Sought version 3Posted - Download
DRAFT_B2_07_RFP_Section_H_(Special_Terms_Conditions).pdf
737 KBAdded in Sources Sought version 3Posted - Download
DRAFT_B2_08.0_RFP_Section_J_(List_of_Attachments).pdf
706 KBAdded in Sources Sought version 3Posted - Download
DRAFT_B2_08.01_Sec_J_Subcontractor_IIPP_Form.pdf
721 KBAdded in Sources Sought version 3Posted - Download
DRAFT_B2_08.02_Sec_J_ISEMS.pdf
1.9 MBAdded in Sources Sought version 3Posted - Download
DRAFT_B2_08.03_Work_Classification-362275.pdf
1.0 MBAdded in Sources Sought version 3Posted - Download
DRAFT_B2_08.04_DBA_WD_CA20250018_1219025_Mod_21.pdf
978 KBAdded in Sources Sought version 3Posted - Download
DRAFT_B2_08.05_Sec_J_SF1413-13g.pdf
632 KBAdded in Sources Sought version 3Posted - Download
DRAFT_B2_08.06_Sec_J_SubcontractorFormSQF.pdf
770 KBAdded in Sources Sought version 3Posted - Download
DRAFT_B2_08.07_Sec_J_NTP_Submittal_Checklist.pdf
1.1 MBAdded in Sources Sought version 3Posted - Download
DRAFT_B2_08.08_Sec_J_Final_Release.pdf
761 KBAdded in Sources Sought version 3Posted - Download
DRAFT_B2_08.09_Sec_J_Final_Inspection_Report.pdf
694 KBAdded in Sources Sought version 3Posted - Download
DRAFT_B2_09.0_RFP_Section_K_(Rep_and_Certs_Cover).pdf
716 KBAdded in Sources Sought version 3Posted - Download
DRAFT_B2_09.1_RFP_Section_K_Reps_and_Certs_Supplement.pdf
654 KBAdded in Sources Sought version 3Posted - Download
DRAFT_B2_10.0_RFP_Section_L_Instructions_to_Offerors_S11 Utilities Project.pdf
826 KBAdded in Sources Sought version 3Posted - Download
DRAFT_B2_10.1_Sec_L_Sector_11_Utilities-Bid_Breakdown.pdf
681 KBAdded in Sources Sought version 3Posted - Download
DRAFT_B2_10.2_Sec_L_RFP_362275_RFI_Log.pdf
652 KBAdded in Sources Sought version 3Posted - Download
DRAFT_B2_11.0_RFP_Section_M_Evaluation_Factors_S11 Utilities Project.pdf
195 KBAdded in Sources Sought version 3Posted
Lifecycle
- 3Version 3Sources SoughtArchivedCurrent
SLAC Sector 11 Utilities – Design-Bid-Build
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Amendment 8- Extend proposal due date to 03/05/2027- California Oregon Transmission Project (COTP) Two-Phase Design-Build 525kV Series Capacitor Bank Replacement Project | 61% | Solicitation | 03/05/2027 |
Solicitation W912QR27BA003 is issued for the demolition and construction of a Wastewater Treatment Plant (WWTP) at Rough River Lake. We request you submit a price proposal for the demolition and construction of a Wastewater Treatment Plant (WWTP) at Rough River Lake. The project duration is estimated at 400 calendar days from Contract Notice to Proceed (NTP). TYPE OF CONTRACT AND NAICS: This Solicitation will result in one (1) Firm-Fixed-Price (FFP) Contract. The North American Industrial Classification System Code (NAICS) for this effort is 237110 - Water and Sewer Line and Related Structures. TYPE OF SET-ASIDE: This acquisition is unrestricted. A 10% Hubzone Price Evaluation Preference will be applied per Clause 52.219-4. SELECTION PROCESS: Basis for award of this Contract will be made based on Lowest Evaluated Price. SOLICITATION WEBSITES: The official solicitation, when posted, will be available free of charge by electronic posting only and may be found at federal Contract Opportunities website, https://sam.gov and the Procurement Integrated Enterprise Environment (PIEE) Solicitation Module website, https://piee.eb.mil/. Paper copies of the solicitation will not be issued. Telephone and Fax requests for this solicitation will not be honored. Project files are Portable Document Format (PDF) files and can be viewed, navigated, or printed using Adobe Acrobat Reader. To download the solicitation for this project, contractors are required to register at the System for Award Management at https://sam.gov. Amendments, if/when issued, will be posted to the above referenced websites for electronic downloading. This will be the only method of distributing amendments prior to closing; therefore, it is the Offerors responsibility to check the websites periodically for any amendments to the solicitation. The solicitation documents can be downloaded by following the PIEE Solicitation Module Link for W912QR27BA003 Link in the Links / Attachments Section below. REGISTRATIONS: Offerors shall have and shall maintain an active registration in the following database: System for Award Management (SAM): Offerors shall have and shall maintain an active registration in the SAM database at http://www.sam.gov to be eligible for a Government contract award. If the Offeror is a Joint Venture (JV), the JV entity shall have valid SAM registration in the SAM database representing the JV as one business/firm/entity. If at the time of award an Offeror is not actively and successfully registered in the SAM database, the Government reserves the right to award to the next prospective Offeror. POINT-OF-CONTACT: The point-of-contact for this procurement is Kelly Duggins, Kelly.S.Duggins@usace.army.mil. PARTNERING WITH US: https://www.usace.army.mil/Business-With-Us/Partnering/ Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Business-With-Us/Partnering/ and then clicking on: View FFP Contract Changes Playbook Here. | 51% | Solicitation | 12/03/2026 |
Solicitation Number: N4008527R0048 This notice does NOT constitute a request for proposal, request for quote, or invitation for bid. The intent of this pre-solicitation synopsis is to make notice of a proposed contract action for performing construction services for Design-Bid-Build (DBB) Phase III Groundwater Treatment Plant Construction, Naval Weapons Industrial Reserve Plant (NWIRP) Bethpage, Wantagh, New York. PROJECT DESCRIPTION: This Design-Bid-Build project aims to address a plume of contaminated groundwater that has spread south from the former NWIRP and Northrop Grumman properties. This contamination, primarily consisting of chlorinated VOCs (like TCE) and 1,4-dioxane, is being remediated as required by the Navy and the New York State Department of Environmental Conservation. The core of this phase is the construction of a new Groundwater Treatment Plant (GWTP) designed to intercept the leading edge of the plume. The plant will treat the captured water to meet drinking water standards using a process that includes sand filters, an Advanced Oxidation Process (AOP), and Granular Activated Carbon (GAC). The scope of work involves the complete construction and commissioning of the facility. This includes completing three groundwater recovery wells and the associated underground piping to bring contaminated water to the plant. The facility itself will house numerous systems, including large storage tanks, multiple filter types, the AOP system, and granular activated carbon units. The project also covers the construction of two new buildings for the treatment plant and offices, along with all necessary structural, electrical, and plumbing infrastructure. The work includes: buried piping systems, pavements, and miscellaneous items; one underground vault; piping, valves, fittings for three recovery wells and wiring, instruments, and equipment within the conduit, manholes, and vaults; three Reinforced Plastic (FRP) vertical storage tanks; one glass fused Backwash waste steel tank; three Multimedia Vertical Pressure Filters (MMF) unit vessels, two Horizontal Cartridge Filters, one Ozone-Hydrogen Peroxide Advance Oxidation Process (AOP) system; three Liquid Phase Granular Activated Carbon (LGAC) unit vessels; eight pumps with piping, valves, supports and appurtenances; two blowers; chemical feed systems for Sodium Hydroxide, Sodium Hypochlorite and Hydrogen Peroxide; two buildings (treatment plant and office), foundations, and interior/exterior concrete slabs on grade and under-slab utility coordination; structural and architectural roof and systems; one 1200A, 277/480V, 3-phase, 3-Wire Service; an MCC for motor VFDs; heating, ventilation, and air conditioning (HVAC); a PLC and SCADA system, and internet/cellular gateway to enable off- site Phase III System process parameters; earthwork, including pad excavation and site re-grading; site utilities; fencing; and a fire protection system. The completion time for this contract is 1,095 calendar days after award. This solicitation is being advertised as "Unrestricted" for full and open competition. This source selection procurement requires both non-price (technical and past performance) and price proposals and will utilize the best value continuum process at FAR 15.103-1 (DPCAP CD 2026-O0048, Rev 1), Tradeoff approach. The basis for evaluation and evaluation factors for award will be included in the solicitation. Large business concerns are required to submit a subcontracting plan prior to award of the contract. The North American Industry Classification System (NAICS) Code for this project is 237110, Water and Sewer Line and Related Structures Construction, with a small business size standard of $45,000,000. The magnitude of construction for this project is between $25,000,000 and $100,000,000. The anticipated award of this contract is March 2027. An SBA Small Business Search (SBS) and a Sources Sought Notice was conducted and issued on 21 January 2026, seeking eligible Small Businesses, HUBZone Small Business, Small Disadvantaged Businesses, Service-Disabled Veteran-Owned Small Businesses, and Women-Owned Small Businesses to determine the opportunity for a set-aside. The Government invited prospective offerors with the capabilities of performing construction services that meet or exceed the stated requirement to submit a capabilities statement. Respondents were required to submit relevant experience in performing efforts of similar size, scope, and complexity within the last seven (7) years. Based on the market research conducted for this procurement and in accordance with FAR 19.104-1 (DPCAP CD 2026-O0037, Rev 1), the Contracting Officer has determined that there is not a reasonable expectation that an adequate number of Small Business firms would respond to or be qualified to perform the requirements of this solicitation. Successful award and completion of the requirements can be achieved by soliciting the contract as "Unrestricted" for full and open competition. A DD2579 Small Business Coordination Record was approved by the NAVFAC MIDLANT Small Business Professional on 30 March 2026. On 02 April 2026, the Small Business Administration (SBA) Procurement Center Representative (PCR) concurred with this recommendation. The Request for Proposal (RFP) will be issued by NAVFAC Mid-Atlantic CON22 on or about 03 December 2026. The solicitation number will be N4008527R0048. All documents will be in Adobe PDF file format and downloadable from the PIEE and Sam.gov website. The official address to the solicitation is https://piee.eb.mil and https://www.sam.gov. Contractors are encouraged to register for the solicitation when downloading from the website. Only registered contractors will be notified by email when amendments to the solicitation are issued. A free Acrobat Reader, required to view the PDF files, can be downloaded from the Adobe website. IMPORTANT NOTICE: All prospective offerors must be registered in the System for Award Management (SAM). You must have an active registration in SAM to do business with the federal government. For additional information, go to https://www.sam.gov. Questions or comments regarding this notice may be addressed by email to shayna.t.eichner.civ@us.navy.mil | 45% | Pre-Solicitation | 12/03/2026 |
REQUEST FOR INFORMATION (RFI) / MARKET INTELLIGENCE NOTICE This is a Request for Information (RFI) for market intelligence and for informational purposes only. This announcement does not constitute a Solicitation or a Request for Proposal (RFP), and no solicitation is currently available. Participation in this RFI is strictly voluntary. The Government will not be obligated to award any agreement or contract because of this RFI, nor will it reimburse respondents for any costs associated with the preparation or submission of information. Submitting a response will not affect a firm’s ability to submit a proposal should formal solicitation be issued in the future. NAICS Code: 237110 – Water and Sewer Line and Related Structures Construction (Note: While Other Transaction Authority is not subject to FAR-based small businesIntells regulations, this NAICS code is provided for market research to help the Government understand the size and demographics of the interested industrial base.) Small Business Size Standard: $45 Million PROJECT OVERVIEW The U.S. Army Corps of Engineers (USACE), Louisville District, has a requirement for the design and construction of a project to restore and modernize the potable water system and wastewater collection system throughout the Fort Hunter Liggett Installation. The scope of work consists of furnishing all necessary design services, equipment, materials, labor, construction management, supervision, quality control, and supplies to deliver a fully functional and modernized potable water and wastewater systems on the Installation. The Fort Hunter Liggett water distribution system dates back to the 1950’s with a few areas believed to be even older and includes a three (3) well configuration that has sufficient pumping capacity to serve current supply demands, however, the water transmission system is undersized to satisfy the demand of the system. While the current water system storage may be sufficient for normal operation, it cannot sustain the system for more than one day in the event of a pump outage and/or fire flow event during maximum day conditions; therefore, additional system storage is necessary. A new Tank Farm with adequate storage capacity (estimated to be a minimum of 2 million gallons) to be determined and validated in accordance with NSPC, UFC, and NFPA criteria, should be in vicinity of security fence gate 10 (Lat: 35.997638° , Long: -121.224355°). Currently the primary storage tank for the potable water system is on the opposite side of the cantonment from the wells and the transmission main and distribution are combined causing significant pressure variations far in excess of industry standard, causing accelerated deterioration of system components. Many pipelines, valves, and hydrants within the distribution system have currently exceeded their useful life expectancy and have failed or failing. High operating pressures place additional strain on this aging system, requiring operational improvements as well as rehabilitation/replacement of existing assets. Modernizing SCADA components are necessary to increase efficiency and updated to cover any system revisions and future improvements. SCADA infrastructure improvements shall integrate into the existing SCADA infrastructure. Fort Hunter Liggett’s wastewater collection system was installed around the same time as the water potable system. Due to the age of the system and deterioration, replacement and rehabilitation of sanitary sewer lines, manholes, and the waste treatment plant lagoon are needed to return the system to be fully functional and code compliant. The wastewater treatment plant relies on a series of lagoons to treat sewage. There are lagoons that have operational deficiencies and require the replacement of the impermeable liner. In addition, the lagoon currently lacks baffles, which are essential for directing the flow of wastewater in a way that maximizes treatment time and prevents "short circuiting". Estimated Acquisition Magnitude: $70-$80M PRIMARY ACQUISITION STRATEGY UNDER EVALUATION: Progressive Design Build (PDB) via Other Transaction Authority (OTA). The Louisville District is evaluating a Progressive Design Build (PDB) strategy utilizing an Other Transaction (OT) Agreement under the authority of 10 U.S.C. § 2808a. This authority authorizes transactions other than standard contracts to carry out facility repair and construction projects – including planning, design, engineering, piloting and execution – enabling early contractor involvement, commercial pricing transparency, and schedule and cost efficiencies. Currently, the Government has advanced a conceptual design for the following potable water system features below. New transmission main to connect the existing well field to the main distribution system within the cantonment area. New storage infrastructure as required to satisfy requirements for fire safety, emergency needs, and operational storage. Upgrades to existing water supply wells to enhance water-supply reliability and redundancy. A Technical Assessment Report of the condition of Fort Hunter Liggett’s utilities systems and modernization recommendations of the water and sanitary sewer systems was completed in June 2024. The onsite assessments used in developing the Technical Assessment Report were conducted November 28-December 7, 2023. Therefore, the Government is utilizing this RFI to assess industry capability, interest, and the advantages of utilizing PDB utilizing an OT Agreement under the authority of 10 U.S.C. § 2808a. The PDB Course of Action (10 U.S.C. § 2808a): The evaluation process for selection of the most highly qualified design-builder would be qualifications based. A streamlined, two-step Qualifications-Based Selection would occur: Step 1: White Papers/Statement of Qualifications submission. Step 2: Down selected design builders would be invited to Pitch Meetings/Presentations. Most highly qualified firm following pitch meetings would be selected to enter into negotiations. The OT Award would be two phases: Phase 1 (Design & Pre-Construction): The Government team will negotiate the price of Agreement Phase I – Design and Pre-Construction Services with the selected design-builder. work collaboratively to advance the design, conduct open-book cost estimating, and mitigate project risks. Phase 2 (Construction): Upon reaching an agreed-upon level of design (e.g., 60% to 90%), the Awardee will propose a Guaranteed Maximum Price (GMP). If the GMP is accepted, the Government will exercise Phase 2 for construction execution. If a GMP cannot be agreed upon, the Government retains an "off-ramp" to complete the design and construct the facility via alternative methods INFORMATION REQUESTED Interested parties are requested to respond to the following questions to help shape the final acquisition strategy. Responses shall be made using the link or QR code in the attachment: Company Profile: Q1. Firm Name Q2. Address Q3. Point of Contact (Name, Title) Q4. Phone Number Q5. Email Address Q6. Unique Entity ID Q7. CAGE code Q8. Socioeconomic Status (Other Than Small, Small, 8(a), SDVOSB, etc.) Q9. Participating Role (Prime Contractor, Subcontractor, Design Firm, Other) Other Transaction Authority (OTA) & Collaborative Delivery Experience: Q10. OTA Experience: Describe your firm's previous experience (if any) executing projects utilizing OTA. Q11. Collaborative Delivery Experience: Describe your experience executing Construction Management at Risk (CM@Risk), Progressive Design Build (PDB), Integrated Design and Construction (IDAC), Early Contractor Involvement (ECI) or other highly collaborative delivery methods. Fort Hunter Liggett Waterline Q12. Describe your experience/expertise with water and wastewater utility construction. Q13. What are the greatest supply chain, scheduling, or technical risks you foresee on a project of this type at Fort Hunter Liggett, and how could the PDB delivery method help mitigate? Feedback on the Acquisition Strategy & Alternatives: Q14. What project characteristics make PDB particularly advantageous or disadvantageous for this requirement? Q15. Does the proposed PDB-OTA strategy incentivize your firm to participate? Why or why not? Q16. Are there alternative acquisition strategies, phasing approaches, or commercial practices the Government has not considered that would yield a better facility, faster delivery, or lower cost? Q17. Differentiating Evaluation Criteria: To differentiate high-performing collaborative design builders from traditional low-bid general contractors, what evaluation criteria (e.g., past collaborative-delivery, technical approach, key personnel/superintendent experience, trade-partner/subcontractor open-book engagement strategy, or proposed General Conditions fees) should carry the greatest weight in the Government's evaluation? Bonding Capability: Q18. Project Bonding Capacity: Specify your maximum bonding (Single and Aggregate) as a Sole Prime Contractor and/or as a Joint Venture. SUBMISSION INSTRUCTIONS Submission Requirement: The only authorized transmission method of responses is via filling out the survey form. No other transmission method will be accepted. Please limit your capability statement to the space provided within the form. The Market Intelligence Response Form can be accessed at: https://forms.osi.apps.mil/r/Lmjbdft8rU or via the QR Code provided in the attachment. Please submit your responses by 03 November 2026 at 1:00 PM Eastern Time. The questionnaire is the Government's primary mechanism for obtaining detailed market intelligence and addresses industry capability, experience, technical capabilities, construction considerations, and recommended OTA and commercial practices. The Government welcomes candid industry feedback and recommendations regarding commercial practices, agreement terms, project phasing, risk sharing, governance, pricing approaches, and other considerations that could improve successful execution of this project under 10 U.S.C. § 2808a. Interested firms are encouraged to add themselves to the Interested Vendors List associated with this announcement on SAM.gov to receive future updates. Note: Do not submit proprietary trade secrets, protected technologies, or classified information in your response. All feedback received will be handled as public market research to shape the Government's final acquisition approach. | 44% | Market Research | 11/03/2026 |
Design-Build MILCON Project P-481 Energy Resilience Phases 3 and 4 at Mountain Range Warfare Training Center (MWTC), Bridgeport, CA. | 42% | Solicitation | 12/04/2025 |
Additional Details
Solicitation Number
SLAC_RFP_362275_Sector_11_Utilities
Archive Date
Jan 21, 2026
Office Address
Menlo Park, CA, 94025