SLAC LCLS-II-HE PCW Skid Upgrade Project
Archived on April 17, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 5:00 PM PDT
- Posted
- March 20, 2026
- Notice type
- Sources Sought
- NAICS
- 238220: Plumbing, Heating, and Air-Conditioning Contractors
- Agency
- Department of Energy
Notice details
- Office
- SLAC Natl Accel Lab -DOE Contractor
- Place of performance
- Menlo Park, California, 94025
- Last updated
- Nov 2, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- SLAC_RFP_362602
- Notice ID
- dad3a429e81c4ef0b7526639f2314fc6
Description
THIS POSTING IS FOR "SOURCES SOUGHT ONLY." PLEASE DO NOT SUMBIT BIDS. While the DRAFT RFP package has been included with this post, the RFP has NOT yet been released.
Interested Vendors should express their interest on the Interested Vendors List through this SAM.GOV posting or by emailing the procurement specialist.
DISCLAIMER:
Please note that any responses to this sources sought posting is purely on a voluntary basis. SLAC is not requesting a proposal, any pricing, or any other information that could be considered confidential or proprietary to be submitted in response to this posting or any part of this posting. Any submissions that contain pricing, proprietary information, or confidential information will be discarded by SLAC.
MINIMUM QUALIFICATIONS:
- The Offeror’s General Contractor’s license has not been revoked within the past five (5) years.
- The Offeror’s company has not been debarred within the past five (5) years from working on any U.S. government contracts/subcontracts.
- Neither the Offeror’s firm, nor any of its owners or officers have been convicted of a crime involving the awarding of the contract of a government (U.S. Federal, State, and City) construction project, or the bidding or performance of a government contract.
- Offeror must have an established local office for a minimum of 2 years in the San Francisco Bay Area. The San Francisco Bay Area is defined as the following 10 counties: Santa Clara, San Mateo, San Francisco, Alameda, Contra Costa, Marin, Napa, Sonoma, Solano, and Santa Cruz Counties
- The Offeror must list any U.S. projects within the past five (5) years that have been terminated for default. The Offeror’s company cannot have any U.S. projects within the past five (5) years that have been terminated for default.
- The Offeror must have previous experience working at Department of Energy (DOE) and/or Department of Defense (DOD) Facilities.
PLANNED SCOPE AND DESCRIPTION OF SERVICES:
1. Room 310 CO2 Chiller Infrastructure
Subcontractor shall provide labor, shop drawings, materials, and resources required to complete structural and architectural modifications, mechanical, plumbing, and electrical systems, and necessary demolitions according to the construction authorization and inspection record requirements, construction drawings, and specifications reference #1, #2 and #3. This includes:
- Installation of mechanical piping, valves, and associated utilities necessary to support the chiller operation.
- Installation of electrical distribution infrastructure, conduit, and wiring to provide power and controls for future SLAC provided CO₂ skids.
- Architectural and facility modifications within Room 310 to support equipment access, installation clearances, and safety requirements.
- Transportation and relocation of the 4ATS1A-950 transfer switch to the designated new location as identified in the construction drawings supporting the CO₂ Chiller Infrastructure Project.
- Coordination with SLAC technical teams and other contractors to ensure seamless interface with the separately managed future SLAC CO₂ skid installation and system commissioning.
2. B950A PCW Skid Demo and Relocation
Subcontractor shall provide labor, shop drawings, materials, and resources required to complete structural and architectural modifications, mechanical, plumbing, and electrical systems, and necessary demolitions according to the construction authorization and inspection record requirements, construction drawings, and specifications reference #4, #6, and #7. This includes:
- Disconnect and safely remove the existing B950A PCW skid located in the NEH, including associated mechanical, electrical, and control connections.
- Perform necessary demolition of piping, supports, and ancillary equipment for relocation, including flushing.
- Relocate reusable components and equipment to the designated staging or storage area identified by SLAC.
- Cap and label all disconnected utilities per SLAC standards.
- Coordinate with SLAC’s Technical Systems and Facilities Engineering to ensure that no disruption occurs to other critical cooling loops.
- Manage and dispose of all demolition debris and fluids per SLAC ESH and waste management procedures.
3. B950 PCW System Upgrade
Subcontractor shall provide labor, shop drawings, materials, and resources required to complete structural and architectural modifications, mechanical, plumbing, and electrical systems, and necessary demolitions according to the construction authorization and inspection record requirements, construction drawings, and specifications reference #4, #5, #6, and #7. This includes:
Installation of New PCW Skid
- Receive, offload, and install the new PCW skid at the designated NEH location.
- Connect to existing PCW supply and return headers, electrical power, and controls per the design documents.
- Perform alignment, anchorage, vibration isolation, and torque verification per manufacturer specifications.
- Support start-up, flushing, and commissioning of the new skid in coordination with SLAC Technical Systems and Commissioning teams.
- Provide as-built documentation, O&M manuals, and test reports upon completion.
PCW Line Upsizing (Basement and Sub-Basement)
- Remove existing PCW piping sections and install new, larger-diameter piping as indicated in the IFC drawings.
- Provide temporary scaffolding and access platforms to safely perform work in the sub-basement.
- Remove and later reinstall a portion of existing ductwork and one (1) light fixture to gain access to the PCW lines.
- Pressure test, flush, and label new piping per SLAC mechanical standards.
- Coordinate with SLAC CM to sequence work to minimize disruption to nearby systems.
SUBMISSION INSTRUCTIONS:
Interested construction contractors with the skills, capability, workload capability, and ability to obtain bonding to complete the planned project scope are invited to submit a written response to this Sources Sought. Please provide the following information:
- Company Name
- Name, telephone number, and email address of a company point of contact who has the authority and knowledge to clarify responses
- Bonding capacity
Please provide your response via email to Sam Kallas at skallas@slac.stanford.edu with “SLAC 362602 Sources Sought Response” inserted in the subject line by 5PM PST on April 2, 2026.
All interested firms must be actively registered in SAM.gov to be eligible.
Award Overview
Contacts
Contracting Officer
Primary Contact
Documents
Files (38)
- Download
DRAFT_B2_01.0_RFP_Cover_Letter_PCW_Skid_Upgrade.pdf
868 KBAdded in Sources Sought version 3Posted - Download
DRAFT_B2_01.1_SLAC_Entry_REAL_ID.pdf
187 KBAdded in Sources Sought version 3Posted - Download
DRAFT_B2_01.2_SLAC_Visitor_Map.pdf
98 KBAdded in Sources Sought version 3Posted - Download
DRAFT_B2_01.3_Grounding_Requirements_for_Generators.pdf
113 KBAdded in Sources Sought version 3Posted - Download
DRAFT_B2_01.4_GFCI_Protection_of_Temp_Power.pdf
176 KBAdded in Sources Sought version 3Posted - Download
DRAFT_B2_01.5_Tree_Shrub_Protection_Guideline.pdf
400 KBAdded in Sources Sought version 3Posted - Download
DRAFT_B2_01.6_SLAC_BIO_Plan_Submittal_Trailer_Conex_Offices.pdf
353 KBAdded in Sources Sought version 3Posted - Download
DRAFT_B2_01.7_SLAC_Construction_Safety_Requirements_Manual.pdf
1.3 MBAdded in Sources Sought version 3Posted - Download
DRAFT_B2_02_RFP_Section_A_(Subcontract_Form).pdf
770 KBAdded in Sources Sought version 3Posted - Download
DRAFT_B2_03_RFP_Section_B_(Supplies_or_Services_and_Price_Costs).pdf
682 KBAdded in Sources Sought version 3Posted - Download
DRAFT_B2_04.0_RFP_Section_C_Cover_(Specs_SOW).pdf
707 KBAdded in Sources Sought version 3Posted - Download
DRAFT_B2_04.1_SOW_PCW_Skid_Upgrade_LCLS-II-HE.pdf
1.8 MBAdded in Sources Sought version 3Posted - Download
DRAFT_B2_04.2_Ref_1_Inspection_Record.pdf
734 KBAdded in Sources Sought version 3Posted - Download
DRAFT_B2_04.3_Ref_2_CO2_Chillers_Drawing_Set.pdf
18 MBAdded in Sources Sought version 3Posted - Download
DRAFT_B2_04.4_Ref_3_CO2_Chillers_Specs.pdf
3.0 MBAdded in Sources Sought version 3Posted - Download
DRAFT_B2_04.5_Ref_4_PCW_Skid_Demo_Drawing_Set.pdf
5.9 MBAdded in Sources Sought version 3Posted - Download
DRAFT_B2_04.6_Ref_5_XPP_Design_PCW_Branches.pdf
48 MBAdded in Sources Sought version 3Posted - Download
DRAFT_B2_04.7_Ref_6_XPP_Design_Specs.pdf
105 MBAdded in Sources Sought version 3Posted - Download
DRAFT_B2_04.8_Ref_7_Inspection_Record_PCW_Skid.pdf
722 KBAdded in Sources Sought version 3Posted - Download
DRAFT_B2_05_RFP_Section_F_(Deliveries_Performance).pdf
805 KBAdded in Sources Sought version 3Posted - Download
DRAFT_B2_06.0_RFP_Section_G_(General_TsCs).pdf
694 KBAdded in Sources Sought version 3Posted - Download
DRAFT_B2_06.1_Fixed_Price_Construction_March2024.pdf
2.1 MBAdded in Sources Sought version 3Posted - Download
DRAFT_B2_07_RFP_Section_H_(Special_Terms_Conditions).pdf
729 KBAdded in Sources Sought version 3Posted - Download
DRAFT_B2_08.0_RFP_Section_J_(List_of_Attachments).pdf
786 KBAdded in Sources Sought version 3Posted - Download
DRAFT_B2_08.1_DB_WD_CA20260018_013026_Mod_4.pdf
253 KBAdded in Sources Sought version 3Posted - Download
DRAFT_B2_08.2_Subcontractor_IIPP_Form.pdf
229 KBAdded in Sources Sought version 3Posted - Download
DRAFT_B2_08.3_Work_Classification_Form_Non-Green.pdf
386 KBAdded in Sources Sought version 3Posted - Download
DRAFT_B2_08.4_SF1413-23a.pdf
687 KBAdded in Sources Sought version 3Posted - Download
DRAFT_B2_08.5_SubcontractorFormSQF.pdf
322 KBAdded in Sources Sought version 3Posted - Download
DRAFT_B2_08.6_NTP_Submittal_Checklist.pdf
582 KBAdded in Sources Sought version 3Posted - Download
DRAFT_B2_08.7_Final_Release.pdf
768 KBAdded in Sources Sought version 3Posted - Download
DRAFT_B2_08.8_Final_Inspection_Report.pdf
701 KBAdded in Sources Sought version 3Posted - Download
DRAFT_B2_09.0_RFP_Section_K_(Rep_and_Certs_Cover).pdf
722 KBAdded in Sources Sought version 3Posted - Download
DRAFT_B2_09.1_Reps_and_Certs_Supplement.pdf
65 KBAdded in Sources Sought version 3Posted - Download
DRAFT_B2_10.0_RFP_Section_L_Instructions_to_Offerors.pdf
1.4 MBAdded in Sources Sought version 3Posted - Download
DRAFT_B2_10.1_RFP_Section_L_Bid_Breakdown.pdf
1.0 MBAdded in Sources Sought version 3Posted - Download
DRAFT_B2_10.2_RFP_Section_L_362602_RFI_Log.pdf
722 KBAdded in Sources Sought version 3Posted - Download
DRAFT_B2_11_RFP_Section_M_Evaluation_Factors.pdf
1.4 MBAdded in Sources Sought version 3Posted
Lifecycle
- 3Version 3Sources SoughtArchivedCurrent
SLAC LCLS-II-HE PCW Skid Upgrade Project
Similar Opportunities
Additional Details
Solicitation Number
SLAC_RFP_362602
Archive Date
Apr 17, 2026
Office Address
Menlo Park, CA, 94025