GovChime
Notice ID: dad3a429e81c4ef0b7526639f2314fc6Sources SoughtArchived

SLAC LCLS-II-HE PCW Skid Upgrade Project

Archived on April 17, 2026. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
5:00 PM PDT
Posted
March 20, 2026
Notice type
Sources Sought
NAICS
238220: Plumbing, Heating, and Air-Conditioning Contractors
Agency
Department of Energy

Notice details

Office
SLAC Natl Accel Lab -DOE Contractor
Place of performance
Menlo Park, California, 94025
Last updated
Nov 2, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
SLAC_RFP_362602
Notice ID
dad3a429e81c4ef0b7526639f2314fc6

Description

THIS POSTING IS FOR "SOURCES SOUGHT ONLY." PLEASE DO NOT SUMBIT BIDS. While the DRAFT RFP package has been included with this post, the RFP has NOT yet been released.

Interested Vendors should express their interest on the Interested Vendors List through this SAM.GOV posting or by emailing the procurement specialist.
 

DISCLAIMER:

Please note that any responses to this sources sought posting is purely on a voluntary basis. SLAC is not requesting a proposal, any pricing, or any other information that could be considered confidential or proprietary to be submitted in response to this posting or any part of this posting. Any submissions that contain pricing, proprietary information, or confidential information will be discarded by SLAC. 

MINIMUM QUALIFICATIONS:

  • The Offeror’s General Contractor’s license has not been revoked within the past five (5) years.
  • The Offeror’s company has not been debarred within the past five (5) years from working on any U.S. government contracts/subcontracts.
  • Neither the Offeror’s firm, nor any of its owners or officers have been convicted of a crime involving the awarding of the contract of a government (U.S. Federal, State, and City) construction project, or the bidding or performance of a government contract.
  • Offeror must have an established local office for a minimum of 2 years in the San Francisco Bay Area. The San Francisco Bay Area is defined as the following 10 counties: Santa Clara, San Mateo, San Francisco, Alameda, Contra Costa, Marin, Napa, Sonoma, Solano, and Santa Cruz Counties
  • The Offeror must list any U.S. projects within the past five (5) years that have been terminated for default. The Offeror’s company cannot have any U.S. projects within the past five (5) years that have been terminated for default.
  • The Offeror must have previous experience working at Department of Energy (DOE) and/or Department of Defense (DOD) Facilities.

PLANNED SCOPE AND DESCRIPTION OF SERVICES:

1. Room 310 CO2 Chiller Infrastructure

Subcontractor shall provide labor, shop drawings, materials, and resources required to complete structural and architectural modifications, mechanical, plumbing, and electrical systems, and necessary demolitions according to the construction authorization and inspection record requirements, construction drawings, and specifications reference #1, #2 and #3. This includes:

  1. Installation of mechanical piping, valves, and associated utilities necessary to support the chiller operation.
  2. Installation of electrical distribution infrastructure, conduit, and wiring to provide power and controls for future SLAC provided CO₂ skids.
  3. Architectural and facility modifications within Room 310 to support equipment access, installation clearances, and safety requirements.
  4. Transportation and relocation of the 4ATS1A-950 transfer switch to the designated new location as identified in the construction drawings supporting the CO₂ Chiller Infrastructure Project.
  5. Coordination with SLAC technical teams and other contractors to ensure seamless interface with the separately managed future SLAC CO₂ skid installation and system commissioning.

2. B950A PCW Skid Demo and Relocation

Subcontractor shall provide labor, shop drawings, materials, and resources required to complete structural and architectural modifications, mechanical, plumbing, and electrical systems, and necessary demolitions according to the construction authorization and inspection record requirements, construction drawings, and specifications reference #4, #6, and #7. This includes:

  1. Disconnect and safely remove the existing B950A PCW skid located in the NEH, including associated mechanical, electrical, and control connections.
  2. Perform necessary demolition of piping, supports, and ancillary equipment for relocation, including flushing.
  3. Relocate reusable components and equipment to the designated staging or storage area identified by SLAC.
  4. Cap and label all disconnected utilities per SLAC standards.
  5. Coordinate with SLAC’s Technical Systems and Facilities Engineering to ensure that no disruption occurs to other critical cooling loops.
  6. Manage and dispose of all demolition debris and fluids per SLAC ESH and waste management procedures.

3. B950 PCW System Upgrade

Subcontractor shall provide labor, shop drawings, materials, and resources required to complete structural and architectural modifications, mechanical, plumbing, and electrical systems, and necessary demolitions according to the construction authorization and inspection record requirements, construction drawings, and specifications reference #4, #5, #6, and #7. This includes:

Installation of New PCW Skid

  1. Receive, offload, and install the new PCW skid at the designated NEH location.
  2. Connect to existing PCW supply and return headers, electrical power, and controls per the design documents.
  3. Perform alignment, anchorage, vibration isolation, and torque verification per manufacturer specifications.
  4. Support start-up, flushing, and commissioning of the new skid in coordination with SLAC Technical Systems and Commissioning teams.
  5. Provide as-built documentation, O&M manuals, and test reports upon completion.

PCW Line Upsizing (Basement and Sub-Basement)

  1. Remove existing PCW piping sections and install new, larger-diameter piping as indicated in the IFC drawings.
  2. Provide temporary scaffolding and access platforms to safely perform work in the sub-basement.
  3. Remove and later reinstall a portion of existing ductwork and one (1) light fixture to gain access to the PCW lines.
  4. Pressure test, flush, and label new piping per SLAC mechanical standards.
  5. Coordinate with SLAC CM to sequence work to minimize disruption to nearby systems.

SUBMISSION INSTRUCTIONS:

Interested construction contractors with the skills, capability, workload capability, and ability to obtain bonding to complete the planned project scope are invited to submit a written response to this Sources Sought. Please provide the following information:

  1. Company Name
  2. Name, telephone number, and email address of a company point of contact who has the authority and knowledge to clarify responses
  3. Bonding capacity

Please provide your response via email to Sam Kallas at skallas@slac.stanford.edu with “SLAC 362602 Sources Sought Response” inserted in the subject line by 5PM PST on April 2, 2026. 

All interested firms must be actively registered in SAM.gov to be eligible.

Full description on SAM.gov

Award Overview

Contacts

Contracting Officer

Primary Contact

Documents

Files (38)

  • DRAFT_B2_01.0_RFP_Cover_Letter_PCW_Skid_Upgrade.pdf

    868 KBAdded in Sources Sought version 3Posted
    Download
  • DRAFT_B2_01.1_SLAC_Entry_REAL_ID.pdf

    187 KBAdded in Sources Sought version 3Posted
    Download
  • DRAFT_B2_01.2_SLAC_Visitor_Map.pdf

    98 KBAdded in Sources Sought version 3Posted
    Download
  • DRAFT_B2_01.3_Grounding_Requirements_for_Generators.pdf

    113 KBAdded in Sources Sought version 3Posted
    Download
  • DRAFT_B2_01.4_GFCI_Protection_of_Temp_Power.pdf

    176 KBAdded in Sources Sought version 3Posted
    Download
  • DRAFT_B2_01.5_Tree_Shrub_Protection_Guideline.pdf

    400 KBAdded in Sources Sought version 3Posted
    Download
  • DRAFT_B2_01.6_SLAC_BIO_Plan_Submittal_Trailer_Conex_Offices.pdf

    353 KBAdded in Sources Sought version 3Posted
    Download
  • DRAFT_B2_01.7_SLAC_Construction_Safety_Requirements_Manual.pdf

    1.3 MBAdded in Sources Sought version 3Posted
    Download
  • DRAFT_B2_02_RFP_Section_A_(Subcontract_Form).pdf

    770 KBAdded in Sources Sought version 3Posted
    Download
  • DRAFT_B2_03_RFP_Section_B_(Supplies_or_Services_and_Price_Costs).pdf

    682 KBAdded in Sources Sought version 3Posted
    Download
  • DRAFT_B2_04.0_RFP_Section_C_Cover_(Specs_SOW).pdf

    707 KBAdded in Sources Sought version 3Posted
    Download
  • DRAFT_B2_04.1_SOW_PCW_Skid_Upgrade_LCLS-II-HE.pdf

    1.8 MBAdded in Sources Sought version 3Posted
    Download
  • DRAFT_B2_04.2_Ref_1_Inspection_Record.pdf

    734 KBAdded in Sources Sought version 3Posted
    Download
  • DRAFT_B2_04.3_Ref_2_CO2_Chillers_Drawing_Set.pdf

    18 MBAdded in Sources Sought version 3Posted
    Download
  • DRAFT_B2_04.4_Ref_3_CO2_Chillers_Specs.pdf

    3.0 MBAdded in Sources Sought version 3Posted
    Download
  • DRAFT_B2_04.5_Ref_4_PCW_Skid_Demo_Drawing_Set.pdf

    5.9 MBAdded in Sources Sought version 3Posted
    Download
  • DRAFT_B2_04.6_Ref_5_XPP_Design_PCW_Branches.pdf

    48 MBAdded in Sources Sought version 3Posted
    Download
  • DRAFT_B2_04.7_Ref_6_XPP_Design_Specs.pdf

    105 MBAdded in Sources Sought version 3Posted
    Download
  • DRAFT_B2_04.8_Ref_7_Inspection_Record_PCW_Skid.pdf

    722 KBAdded in Sources Sought version 3Posted
    Download
  • DRAFT_B2_05_RFP_Section_F_(Deliveries_Performance).pdf

    805 KBAdded in Sources Sought version 3Posted
    Download
  • DRAFT_B2_06.0_RFP_Section_G_(General_TsCs).pdf

    694 KBAdded in Sources Sought version 3Posted
    Download
  • DRAFT_B2_06.1_Fixed_Price_Construction_March2024.pdf

    2.1 MBAdded in Sources Sought version 3Posted
    Download
  • DRAFT_B2_07_RFP_Section_H_(Special_Terms_Conditions).pdf

    729 KBAdded in Sources Sought version 3Posted
    Download
  • DRAFT_B2_08.0_RFP_Section_J_(List_of_Attachments).pdf

    786 KBAdded in Sources Sought version 3Posted
    Download
  • DRAFT_B2_08.1_DB_WD_CA20260018_013026_Mod_4.pdf

    253 KBAdded in Sources Sought version 3Posted
    Download
  • DRAFT_B2_08.2_Subcontractor_IIPP_Form.pdf

    229 KBAdded in Sources Sought version 3Posted
    Download
  • DRAFT_B2_08.3_Work_Classification_Form_Non-Green.pdf

    386 KBAdded in Sources Sought version 3Posted
    Download
  • DRAFT_B2_08.4_SF1413-23a.pdf

    687 KBAdded in Sources Sought version 3Posted
    Download
  • DRAFT_B2_08.5_SubcontractorFormSQF.pdf

    322 KBAdded in Sources Sought version 3Posted
    Download
  • DRAFT_B2_08.6_NTP_Submittal_Checklist.pdf

    582 KBAdded in Sources Sought version 3Posted
    Download
  • DRAFT_B2_08.7_Final_Release.pdf

    768 KBAdded in Sources Sought version 3Posted
    Download
  • DRAFT_B2_08.8_Final_Inspection_Report.pdf

    701 KBAdded in Sources Sought version 3Posted
    Download
  • DRAFT_B2_09.0_RFP_Section_K_(Rep_and_Certs_Cover).pdf

    722 KBAdded in Sources Sought version 3Posted
    Download
  • DRAFT_B2_09.1_Reps_and_Certs_Supplement.pdf

    65 KBAdded in Sources Sought version 3Posted
    Download
  • DRAFT_B2_10.0_RFP_Section_L_Instructions_to_Offerors.pdf

    1.4 MBAdded in Sources Sought version 3Posted
    Download
  • DRAFT_B2_10.1_RFP_Section_L_Bid_Breakdown.pdf

    1.0 MBAdded in Sources Sought version 3Posted
    Download
  • DRAFT_B2_10.2_RFP_Section_L_362602_RFI_Log.pdf

    722 KBAdded in Sources Sought version 3Posted
    Download
  • DRAFT_B2_11_RFP_Section_M_Evaluation_Factors.pdf

    1.4 MBAdded in Sources Sought version 3Posted
    Download

Lifecycle

  1. 3
    Version 3Sources SoughtArchivedCurrent

    SLAC LCLS-II-HE PCW Skid Upgrade Project

    Notice dad3a429e81c4ef0b7526639f2314fc6 on SAM.gov

Similar Opportunities

Additional Details

Solicitation Number

SLAC_RFP_362602

Archive Date

Apr 17, 2026

Office Address

Menlo Park, CA, 94025