SSRL B116 & B132 BPM HVAC Replacement
Archived on April 28, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 5:00 PM UTC+00:00
- Posted
- April 2, 2026
- Notice type
- Sources Sought
- Agency
- Department of Energy
Notice details
- Office
- SLAC Natl Accel Lab -DOE Contractor
- Place of performance
- Menlo Park, California, 94025
- Last updated
- Aug 21, 2026
Identifiers
- Solicitation number
- SLAC_RFP_363431
- Notice ID
- fe40acecf45e440383c821d278f8e47c
Description
The subcontractor must provide all labor, oversight, tools, materials, equipment, and services necessary to complete the work safely and in compliance with approved BIO documents as well as SLAC, DOE, and ES&H standards. The subcontractor shall remove and replace, in its entirety, the HVAC systems servicing the Beam Position Monitor (BPM) Rooms in Buildings 116 and 132.
All construction activities must be performed primarily during SSRL’s Summer 2026 shutdown, scheduled from July 21, 2026 through August 31, 2026, with the HVAC system operational no later than September, 2026. If equipment lead times prevent full completion by this date, the project shall be phased to complete as much work as possible during the Summer 2026 shutdown, with any remaining work performed during the Summer 2027 shutdown.
THIS IS FOR SOURCES SOUGHT ONLY, DO NOT SUMBIT BIDS. While the draft RFP package has been included with this post, the RFP has not been released. Interested vendors should express their interest by sending their capabilities statement to Doreen Agbayani at doreena@slac.stanford.edu.
Award Overview
Contacts
Contracting Officer
Primary Contact
Documents
Showing 10 of 41 items
Document | Source | Agency | Posted Date | File Size | Actions | |
|---|---|---|---|---|---|---|
| Sources Sought | ENERGY, DEPARTMENT OF | Apr 2, 2026 | 1.34 MB | |||
| Sources Sought | ENERGY, DEPARTMENT OF | Apr 2, 2026 | 699.95 KB | |||
| Sources Sought | ENERGY, DEPARTMENT OF | Apr 2, 2026 | 125.63 KB | |||
| Sources Sought | ENERGY, DEPARTMENT OF | Apr 2, 2026 | 322.46 KB | |||
| Sources Sought | ENERGY, DEPARTMENT OF | Apr 2, 2026 | 229.22 KB | |||
| Sources Sought | ENERGY, DEPARTMENT OF | Apr 2, 2026 | 65.44 KB | |||
| Sources Sought | ENERGY, DEPARTMENT OF | Apr 2, 2026 | 103.83 KB | |||
| Sources Sought | ENERGY, DEPARTMENT OF | Apr 2, 2026 | 3.3 MB | |||
| Sources Sought | ENERGY, DEPARTMENT OF | Apr 2, 2026 | 643.11 KB | |||
| Sources Sought | ENERGY, DEPARTMENT OF | Apr 2, 2026 | 186.08 KB |
Showing 1 to 10 of 41 results
Lifecycle
SLAC_RFP_363431- Market Research
Pre-solicitation or formal solicitation typically follows within 30–180 days. (estimate)
- 3×Market ResearchCurrentMar 30, 2026
SSRL B116 & B132 BPM HVAC Replacement
Similar Opportunities
Additional Details
Solicitation Number
SLAC_RFP_363431
Archive Date
Apr 28, 2026
Office Address
Menlo Park, CA, 94025