RPC Power Factor Correction Work Package 1 - Demolition
Archived on July 24, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 10:00 AM PDT
- Posted
- July 17, 2026
- Notice type
- Sources Sought
- Set-aside
- No Set aside used
- Agency
- Department of Energy
Notice details
- Office
- SLAC Natl Accel Lab -DOE Contractor
- Place of performance
- Menlo Park, California, 94025
- Last updated
- Oct 28, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- SLAC_RFP_367094
- Notice ID
- 99bbf7310e21477c91b960e33506e947
Description
Introduction and Overview:
The subcontractor must provide all labor, oversight, tools, materials, equipment, and services necessary to complete the work safely and in compliance with approved BIO documents as well as SLAC, DOE, and ES&H standards. SLAC receives power at its Master Substation (MSS) from a PG&E 230kV transmission line via two 230kV/12.47kV stepdown transformers. SLAC identifies that its AC power system encounters power factor issues at the point of connection (POC) with PG&E, where the power factor strays outside the contractual range (0.97 lag to 0.99 lead). This deviation stems from various factors, including reactive power imbalances, capacitive or inductive loads, etc. Consequently, suboptimal power factor conditions can result in increased power losses, reduced system efficiency, and involve potential penalties imposed by PG&E. To address this challenge, SLAC plans to implement power factor correction measures through the installation of two switched power factor correction (PFC) systems – one on 12.47 kV Bus-1 and another on 12.47kV Bus-2 at the Master Substation (MSS). These PFC units will dynamically improve reactive power flow, compensating for system reactive power demand, and maintaining the overall power factor within the required range. Enhancing power factor correction in this manner will optimize energy utilization, reduce system losses, and ensure continued compliance with PG&E contractual requirements.
Purpose:
Prior to the installation of the new power factor correction equipment, it is necessary to demolish existing buildings (B308 and B311) with equipment inside them to create adequate space within the MSS Yard. This Statement of Work outlines the scope for the demolition, disassembly, and removal of existing assets, including metal buildings B308 and B311, a non-operational synchronous condenser, and the associated electrical equipment and cabling and wiring serving the condenser. All identified buildings and equipment are located in the SLAC MSS Yard.
THIS IS FOR SOURCES SOUGHT ONLY, DO NOT SUMBIT BIDS. While the draft RFP package has been included with this post, the RFP has not been released. Interested vendors should express their interest by sending their capabilities statement to Doreen Agbayani at doreena@slac.stanford.edu.
Award Overview
Contacts
Contracting Officer
Primary Contact
Documents
Files (25)
- Download
B2_07.1_DBA_WD_CA20260018_7.14.26_Mod_06_DRAFT.pdf
3.7 MBAdded in Sources Sought version 3Posted - Download
B2_05.1_Fixed_Price_Construction_March2024_DRAFT.pdf
1.3 MBAdded in Sources Sought version 3Posted - Download
B2_09.2_Section_L_Attachment_B_SLAC_Question&Answer_Log_(RFI)_DRAFT.pdf
754 KBAdded in Sources Sought version 3Posted - Download
B2_07.4_SF1413_DRAFT.pdf
699 KBAdded in Sources Sought version 3Posted - Download
B2_07.3_Work_Classification_Form_367094_DRAFT.pdf
649 KBAdded in Sources Sought version 3Posted - Download
B2_04_Section_F_(Deliveries_Performance)_DRAFT.pdf
641 KBAdded in Sources Sought version 3Posted - Download
B2_07.6_NTP_Submittal_Checklist_061424_DRAFT.pdf
582 KBAdded in Sources Sought version 3Posted - Download
B2_09.0_Section_L_Instruction_to_Offerors_DRAFT.pdf
322 KBAdded in Sources Sought version 3Posted - Download
B2_07.5_SubcontractorFormSQF_DRAFT.pdf
322 KBAdded in Sources Sought version 3Posted - Download
B2_10_Section_M_Evaluation_Methodology_DRAFT.pdf
241 KBAdded in Sources Sought version 3Posted - Download
B2_05.0_Section_G_(General_TsCs)_DRAFT.pdf
235 KBAdded in Sources Sought version 3Posted - Download
B2_07.2_Subcontractor_Form_IIPP_052121_DRAFT.pdf
228 KBAdded in Sources Sought version 3Posted - Download
B2_07.8_Construction_Subcontracts_Final_Release_DRAFT.pdf
186 KBAdded in Sources Sought version 3Posted - Download
B2_07.0_Section_J_(List_of_Attachments)_DRAFT.pdf
170 KBAdded in Sources Sought version 3Posted - Download
B2_06_Section_H_(Special TsCs)_DRAFT.pdf
185 KBAdded in Sources Sought version 3Posted - Download
B2_08.0_Section_K_(Rep_and_Certs)_DRAFT.pdf
163 KBAdded in Sources Sought version 3Posted - Download
B2_07.7_Final_Inspection_Report_DRAFT.pdf
123 KBAdded in Sources Sought version 3Posted - Download
B2_09.1_Section_L_Attachment_A_Proposal_Breakdown_Sheet_DRAFT.pdf
122 KBAdded in Sources Sought version 3Posted - Download
B2_08.1_Reps_and_Certs_Supplement_DRAFT.pdf
65 KBAdded in Sources Sought version 3Posted - Download
B2_01_Section_A_(Subcontract_Form)_DRAFT.pdf
634 KBAdded in Sources Sought version 3Posted - Download
B2_02_Section_B_(Supplies_or_Services_and_Price_Costs)_DRAFT.pdf
631 KBAdded in Sources Sought version 3Posted - Download
B2_00_RFP_Cover_DRAFT.pdf
622 KBAdded in Sources Sought version 3Posted - Download
B2_03.0_Section_C_(Specifications_SOW)_DRAFT.pdf
586 KBAdded in Sources Sought version 3Posted - Download
B2_03.3_SLAC BIO Adopted Codes and Standards (Updated 01012025)_DRAFT.pdf
466 KBAdded in Sources Sought version 3Posted - Download
B2_03.1_SOW_RPC WP1 Demolition_R3_DRAFT.pdf
386 KBAdded in Sources Sought version 3Posted
Lifecycle
- 3Version 3Sources SoughtArchivedCurrent
RPC Power Factor Correction Work Package 1 - Demolition
Similar Opportunities
Additional Details
Solicitation Number
SLAC_RFP_367094
Archive Date
Jul 24, 2026
Office Address
Menlo Park, CA, 94025