SLAC Job Order Contract
Archived on October 13, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 5:00 PM PDT
- Posted
- September 21, 2026
- Notice type
- Sources Sought
- NAICS
- 236220: Commercial and Institutional Building Construction
- Agency
- Department of Energy
Notice details
- Office
- SLAC Natl Accel Lab -DOE Contractor
- Place of performance
- Menlo Park, California, 94025
- Last updated
- Oct 28, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- SLAC_RFP_368624
- Notice ID
- f63c57df6b6245008db7e2e184005f5a
Description
THIS POSTING IS FOR "SOURCES SOUGHT ONLY".
PLEASE DO NOT SUMBIT BIDS.
While the DRAFT RFP package has been included with this post, the RFP has NOT yet been released. Interested Vendors should express their interest on the Interested Vendors List through this SAM.GOV posting or by emailing the procurement specialist.
SLAC Job Order Contracting
SLAC has a requirement for Job Order Contract (JOC) services to support construction, alteration, and repair of scientific, industrial, office, civil, utility projects, and minimal design on the SLAC campus. SLAC also has a need for project management, planning, estimating, labor, transportation, materials, equipment, tools, supervision, and other associated tasks necessary to fulfill the construction requirements of each JOC Task Order.
The Contract Documents include a Construction Task Catalog® containing Prepriced Tasks for construction work with preset Unit Prices. All Unit Prices are based on local labor, material and equipment costs and are for the direct cost of construction.
This contract will provide for a one (1) year Base Period and up to four (4) Option Periods. All Task Orders issued during any term of this Contract shall be valid and in effect notwithstanding that the Detailed Scope of Work may be performed, payments may be made, and the guarantee period may continue, after such period has expired. All terms and conditions of the Contract apply to each Task Order.
As Projects are assigned, the Contractor will attend a Joint Scope Meeting with SLAC to review and discuss the proposed work. SLAC will prepare a Detailed Scope of Work and issue a Task Order Request for Proposal to the Contractor. The Contractor will then prepare a Task Order Proposal including a Price Proposal, construction schedule, list of proposed subcontractors, and other requested documentation.
Full project details and requirements can be found in the SOW and supporting documentation.
MINIMUM QUALIFICATIONS
- The Offeror’s General Contractor’s license has not been revoked within the past five (5) years.
- The Offeror’s company has not been debarred within the past five (5) years from working on any U.S. government contracts/subcontracts.
- Neither the Offeror’s firm, nor any of its owners or officers have been convicted of a crime involving the awarding of the contract of a government (U.S. Federal, State, and City) construction project, or the bidding or performance of a government contract.
- Offeror must have an established local office for a minimum of 2 years in the San Francisco Bay Area. The San Francisco Bay Area is defined as the following 10 counties: Santa Clara, San Mateo, San Francisco, Alameda, Contra Costa, Marin, Napa, Sonoma, Solano, and Santa Cruz Counties
- The Offeror must list any U.S. projects within the past five (5) years that have been terminated for default. The Offeror’s company cannot have any U.S. projects within the past five (5) years that have been terminated for default.
- The Offeror must have previous experience working at Department of Energy (DOE) and/or Department of Defense (DOD) Facilities
SOURCES SOUGHT RESPONSE
Interested firms with the skills and capability to complete the above scopes are invited to submit a written response to this Sources Sought Notice. Please provide the following information:
- Firm’s name
- Name, telephone number, and email address of a company point of contact who has the authority and knowledge to clarify responses
Please provide your response to Matt Mezzetta at mezzetta@slac.stanford.edu by 5 pm PST on September 28, 2026.
SOURCES SOUGHT DISCLAIMER:
Please note that any responses to this sources sought posting is purely on a voluntary basis. SLAC is not requesting a proposal, any pricing, or any other information that could be considered confidential or proprietary to be submitted in response to this posting or any part of this posting. Any submissions that contain pricing, proprietary information, or confidential information will be discarded by SLAC.
Award Overview
Contacts
Contracting Officer
Primary Contact
Documents
Files (35)
- Download
B2_DRAFT_00_RFP_Cover_Letter_JOC.pdf
1.0 MBAdded in Sources Sought version 3Posted - Download
B2_DRAFT_01_RFP_Section_A_(Subcontract_Form).pdf
759 KBAdded in Sources Sought version 3Posted - Download
B2_DRAFT_02_RFP_Section_B_(Supplies or Services and Price_Costs).pdf
1.1 MBAdded in Sources Sought version 3Posted - Download
B2_DRAFT_03.0_RFP_Section_C_SOW_Cover_JOC.pdf
878 KBAdded in Sources Sought version 3Posted - Download
B2_DRAFT_03.1_Section_C_Statement_of_Work_JOC.pdf
1.5 MBAdded in Sources Sought version 3Posted - Download
B2_DRAFT_03.2_Section_C_Construction_Task_Catalog_INCORPORATED_BY_REFERENCE.pdf
789 KBAdded in Sources Sought version 3Posted - Download
B2_DRAFT_03.3_Section_C_Appendix_B_SLAC_Electrical_Design_Standards.pdf
944 KBAdded in Sources Sought version 3Posted - Download
B2_DRAFT_03.4_Section_C_AppendixC_SLAC_Design_Procedures_Sewer_Services.pdf
872 KBAdded in Sources Sought version 3Posted - Download
B2_DRAFT_03.5_Section_C_Appendix_D_SLAC_Design_Procedures_Water_Services.pdf
830 KBAdded in Sources Sought version 3Posted - Download
B2_DRAFT_03.6_Section_C_Appendix E_SLAC_Space_Standards.pdf
939 KBAdded in Sources Sought version 3Posted - Download
B2_DRAFT_03.7_Section_C_Appendix F_SLAC_Landscape_Vegetation_Planting_Guidance.pdf
696 KBAdded in Sources Sought version 3Posted - Download
B2_DRAFT_03.8_Section_C_Appendix G_SLAC_Seismic_Design_Specifications.pdf
1.1 MBAdded in Sources Sought version 3Posted - Download
B2_DRAFT_03.9_Section_C_Appendix H_SLAC_Drawing_Deliverables.pdf
2.2 MBAdded in Sources Sought version 3Posted - Download
B2_DRAFT_03.10_Section_C_Appendix_I_INCORPORATED_BY_REFERENCE.pdf
845 KBAdded in Sources Sought version 3Posted - Download
B2_DRAFT_03.11_Section_C_Appendix J_DOE-STD-1066-2023.pdf
3.9 MBAdded in Sources Sought version 3Posted - Download
B2_DRAFT_04_RFP_Section_F_(Deliveries_Performance).pdf
722 KBAdded in Sources Sought version 3Posted - Download
B2_DRAFT_05.0_RFP_Section_G_(General_TsCs).pdf
867 KBAdded in Sources Sought version 3Posted - Download
B2_DRAFT_05.1_Fixed_Price_Construction_March2024.pdf
432 KBAdded in Sources Sought version 3Posted - Download
B2_DRAFT_05.2_SLAC_General_Ts_Cs_Supplemental_Rider_Aug2026.pdf
805 KBAdded in Sources Sought version 3Posted - Download
B2_DRAFT_07_RFP_Section_H_(Special_Terms_Conditions).pdf
888 KBAdded in Sources Sought version 3Posted - Download
B2_DRAFT_08.0_RFP_Section_J_Cover.pdf
886 KBAdded in Sources Sought version 3Posted - Download
B2_DRAFT_08.1_Sec_J_DBA_WD_CA20260018_09172026_Mod_08.pdf
1.1 MBAdded in Sources Sought version 3Posted - Download
B2_DRAFT_08.2_Sec_J_Subcontractor_IIPP_Form.pdf
292 KBAdded in Sources Sought version 3Posted - Download
B2_DRAFT_08.3_Sec_J_SF1413_exp_05-2027.pdf
687 KBAdded in Sources Sought version 3Posted - Download
B2_DRAFT_08.4_Subcontractor_Safety_Qualification_Form.pdf
791 KBAdded in Sources Sought version 3Posted - Download
B2_DRAFT_08.5_NTP_Submittal_Checklist.pdf
1.0 MBAdded in Sources Sought version 3Posted - Download
B2_DRAFT_08.6_Final_Inspection_Report.pdf
603 KBAdded in Sources Sought version 3Posted - Download
B2_DRAFT_08.7_Final_Release.pdf
670 KBAdded in Sources Sought version 3Posted - Download
B2_DRAFT_09.0_RFP_Section_K_(Rep_and_Certs_Cover).pdf
623 KBAdded in Sources Sought version 3Posted - Download
B2_DRAFT_09.1_RFP_Section_K_Reps_and_Certs_Supplement_08.25.22.pdf
561 KBAdded in Sources Sought version 3Posted - Download
B2_DRAFT_10.0_RFP_Section_L_(Instructions_to_Offerors).pdf
1.5 MBAdded in Sources Sought version 3Posted - Download
B2_DRAFT_10.1_Section_L_Attachment_A_(Past_Performance).pdf
1.5 MBAdded in Sources Sought version 3Posted - Download
B2_DRAFT_10.2_Section_L_Attachment_B_(Bid_Form).pdf
1.2 MBAdded in Sources Sought version 3Posted - Download
B2_DRAFT_10.3_Section_L_Attachment_C_(Q&A_Log).pdf
686 KBAdded in Sources Sought version 3Posted - Download
B2_DRAFT_11_RFP_Section_M_(Evaluation_Factors).pdf
1.5 MBAdded in Sources Sought version 3Posted
Lifecycle
- 3Version 3Sources SoughtArchivedCurrent
SLAC Job Order Contract
Similar Opportunities
Additional Details
Solicitation Number
SLAC_RFP_368624
Archive Date
Oct 13, 2026
Office Address
Menlo Park, CA, 94025