Notice ID: b4a03e97b7cd43b6a0d2151c2bf1ae64Solicitation
Electric Power Resiliency - Bldg.59
Archived on December 31, 2021. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 1:00 PM UTC−04:00
- Posted
- September 3, 2021
- Notice type
- Solicitation
- Set-aside
- Small Business Set Aside - Total
- NAICS
- 238210: Electrical Contractors and Other Wiring Installation Contractors
- Agency
- Department of WarDEFENSE LOGISTICS AGENCY
Notice details
- Office
- DLA DISTRIBUTION
- Place of performance
- 95366
- Last updated
- Sep 25, 2026
Identifiers
- Solicitation number
- SP330021B0001
- Notice ID
- b4a03e97b7cd43b6a0d2151c2bf1ae64
Description
See Added Attached Bid Abstract.. See Attached Amendment 0001 SP330021B00010001 and associated Revised Attachment 2 SOW. See Attached Full Solictation SP330021B0001. Project Description: 1. Contractor is to provide all labor, supervision, materials, tools, and equipment design and install roof mounted 300 KW solar photovoltaic system for building 59. 2. PV electrical output will be interconnected with the existing electric service to the building. 3. All PV generated will be used to displace "behind-the-meter" retail electric consumption. 4. The PV solar panels’ layout of the rooftop PV system shall be designed so as not to interfere with the servicing of existing mechanical equipment, roof drains, or other roof equipment that requires regular servicing. Access aisles will be provided on the rooftop and appropriate clearances to maintain roof top mechanical equipment. 5. PV system shall meet 85 mph 3 second gush wind load. 6. Use maximum ballasts for PV panel anchoring. Repair, seal, weather tight all roof penetration. Coordinate with the roof manufacturer to provide certificate of roof warranty not invalidated by solar PV installation. 7. Output from the PV panels will be converted to AC through inverter mounted on solar panels and then interconnected to the main electrical switchgear. The new PV systems will tie in with the existing Base-wide electrical distribution system. 8. PV system design include appropriate disconnects and grounding systems to safely interface with the government's distribution. All work shall be performed complete and in accordance with the Specifications including Scope of Work and Drawings.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Paul Holbert
Secondary Contact
DONNA A KAUTZ
Documents
No documents available.
Lifecycle
Solicitation:
SP330021B0001- Pre-Solicitation
- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- Pre-SolicitationJul 13, 2021
Electric Power Resiliency - Bldg.59
- 4×SolicitationCurrentJul 28, 2021
Electric Power Resiliency - Bldg.59
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
SP330021B0001
Archive Date
Dec 31, 2021
Office Address
NEW CUMBERLAND, PA, 17070-5002