12KV Overhead to Underground Powerline Replacement At DDJC

Archived on December 30, 2023. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
1:00 PM UTC−04:00
Posted
August 4, 2023
Notice type
Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
237130: Power and Communication Line and Related Structures Construction
Agency
Department of WarDEFENSE LOGISTICS AGENCY

Notice details

Office
DLA DISTRIBUTION
Place of performance
Tracy, CA, 95304
Last updated
Dec 4, 2025

Identifiers

Solicitation number
SP330023B0001
Notice ID
6a5a947301c4400f8471aca4a384721e

Description

**** See Attached Bid Abstract as of 6JUL23**** Amendment 0004 is being issued to provide a revised Section I. See attached. Section I is revised by this Amendment to incorporate FAR Clause 52.204-27, Prohibition on a Bytedance Covered Application (June 2023) which was previously omitted. SEE ATTACHMENTS SP330023B00010004 and SECTION I - IFB - 12kV PL Revised as of A4. See Attached SITE VISIT ROSTER entitled "12KV OH to UG Site Visit Roster" Amendment 0003 is being issued to answer vendor questions and provide a revised Attachment 3 regarding Specifications. SEE ATTACHMENTS SP330023B00010003 AND REVISED ATTACHMENT 3. Amendment 0002 is being issued to extend the date for Submission of Questions and extend the Bid Submission process dates. SEE ATTACHMENT SP330023B00010002. ***All questions/Site Visit questions must be recieved by close of business 9 June 2023 instead of 5 June 2023. ***Please use https://dbids-global-enroll.dmdc.mil/preenrollui/#!/ for DBIDs site instead of http://dibs.dmdc.mil for preregistration for site visit. Amendment 0001 is issued to change Site Visit date and time. Please see attached file entitled SP330023B00010001 change to Site Visit Date. 12KV Overhead to Underground Powerline Replacement at DDJC Project Description: The work includes removal of overhead 12kV lines, auxiliary communications equipment (where installed), and poles and the subsequent installation of new underground conduits, duct banks, manholes, lighting poles, transformers and other accessories to ensure a complete working power distribution system. The northern segment of the existing overhead 12kV is located along First Street between Ennis Drive and B Street, while the southern segment runs south from D Street and wraps around the south end of the facility up to 5th Street.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Documents

No documents available.

Lifecycle

Solicitation:SP330023B0001
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. Pre-SolicitationMay 2, 2023

    12KV Overhead to Underground Powerline Replacement

    Notice 7b04f3bd07334c1a9dd390200df56392 on SAM.gov

  2. 10×
    SolicitationCurrentMay 24, 2023

    12KV Overhead to Underground Powerline Replacement At DDJC

    Notice 6a5a947301c4400f8471aca4a384721e on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
Amendment 0004 and RFI Set #4 Posted July 27, 2026***************************Amendment 0003 and RFI Set #3 has been uploaded on July 17, 2026*****************************************************************************The purpose of Amendment 2 is to extend the proposal due date to July 31, 2026 and make revisions to the solicitation. See the summary of changes on page 2 of Amendment 0002. Responses to RFI - Set #2 has been posted. ***********************************The purpose of Amendment 0001 is to extend the proposal due date to July 13, 2026 and make revisions to the solicitation. See the summary of changes on page 2 of the attached amendment. Due to the number of RFIs received, the USACE is still preparing responses and responses will be posted as soon as they are available. A select number of RFIs have been posted with this Amendment. ***************************************************************************************************************************************************************************************************This procurement will be conducted under PSC: Y1MG, NAICS: 237130. The size standard for this code is $45,000,000. This is a total Small Business Set Aside. All questions should be directed to the Contract Specialist, Nairi Freeman, nairi.freeman@usace.army.mil. Estimated Cost Range is between $10,000,000 to $25,000,000. FUNDS ARE NOT PRESENTLY AVAILABLE FOR THIS ACQUISITION. NO CONTRACT AWARD WILL BE MADE UNTIL APPROPRIATED FUNDS ARE MADE AVAILABLE. SEE FAR CLAUSE 52.232-18 AVAILABILITY OF FUNDS. RFP/Solicitation Number: W9123826RA016. Project Title: U.S. Army 63rd Readiness Division MILCON ERCIP Microgrid. Project Location: Mountain View, Santa Clara County, California. This project provides energy resilience for 14+ days for mission critical functions, utilizing renewable and fossil fuel energy sources. Installation of a microgrid system that will have full islanding capability. The microgrid system will incorporate a ground-mounted 750kW photovoltaic (PV) solar system with low voltage switchgear for building energy shifting; a 750kWh battery energy storage system (BESS); an 800kW diesel backup generation system, with a 10,000-gallon fuel storage tank. The microgrid system will include a master microgrid controller, and automatic smart switches controlling the generation resources within the Reserve Center. Microgrid will be installed on a closed restricted network (CRN) requiring an Authority to Operate (ATO) IAW DODI 8510.01. System cybersecurity requirements will be designed IAW UFC 4-010-06 Cybersecurity for Facility Related Control Systems. All proposals will be due on June 29, 2026, at 12:00PM PDT. The specific date and time is identified in the solicitation. OFFERORS ARE ADVISED THIS PROJECT MAY BE DELAYED, CANCELLED, OR REVISED AT ANY TIME DURING SOLICITATION, SELECTION, EVALUATION, AND/OR FINAL AWARD PROCESS. Plans and specs will not be provided in hard copy or CD format. NOTE: a) In preparation for prospective to submit offers when the RFP is issued, it is imperative that all prospective Offerors (including their subcontractors) be registered in the System for Award Management (SAM - www.SAM.gov) and the Procurement Integrated Enterprise Environment (PIEE) website in order to be able to view and download solicitation information, and to submit offers. b) Solicitation documents, plans, and specifications are only available to be download from PIEE, which may be accessed at https://wawf.eb.mil OR https://piee.eb.mil OR https://piee.eb.mil/xhtml/unauth/home/login.xhtml. c) Offers MUST BE submitted electronically through the PIEE website. d) Registration should be completed one (1) week prior to the anticipated solicitation release date. USACE will not notify Offerors of any changes to the solicitation; Offerors must monitor PIEE and SAM for the solicitation to be posted, and for any posted changes or amendments. e) See attachments - PIEE Solicitation Module Vendor Access Instructions-, -SOP PIEE Proposal Manager Offeror-, and -SOP PIEE Posting Offer- for instructions on getting access to the PIEE Solicitation Module and submitting Offeror proposals.
-Solicitation07/31/2026
This procurement will be conducted under PSC: Y1MG, NAICS: 237130. The size standard for this code is $45,000,000. This is a total Small Business Set Aside. All questions should be directed to the Contract Specialist, Nairi Freeman, nairi.freeman@usace.army.mil. Estimated Cost Range is between $10,000,000 to $25,000,000. RFP/Solicitation Number: W9123826RA016. Project Title: U.S. Army 63rd Readiness Division MILCON ERCIP Microgrid. Project Location: Mountain View, Santa Clara County, California. This project provides energy resilience for 14+ days for mission critical functions, utilizing renewable and fossil fuel energy sources. Installation of a microgrid system that will have full islanding capability. The microgrid system will incorporate a ground-mounted 750kW photovoltaic (PV) solar system with low voltage switchgear for building energy shifting; a 750kWh battery energy storage system (BESS); an 800kW diesel backup generation system, with a 10,000-gallon fuel storage tank. The microgrid system will include a master microgrid controller, and automatic smart switches controlling the generation resources within the Reserve Center. Microgrid will be installed on a closed restricted network (CRN) requiring an Authority to Operate (ATO) IAW DODI 8510.01. System cybersecurity requirements will be designed IAW UFC 4-010-06 Cybersecurity for Facility Related Control Systems. The solicitation will be available on/about April 15, 2026, for viewing/downloading. All proposals will be due on/about May 15, 2026, at 12:00PM PDT. The specific date and time will be identified in the solicitation. OFFERORS ARE ADVISED THIS PROJECT MAY BE DELAYED, CANCELLED, OR REVISED AT ANY TIME DURING SOLICITATION, SELECTION, EVALUATION, AND/OR FINAL AWARD PROCESS. Plans and specs will not be provided in hard copy or CD format. NOTE: a) In preparation for prospective to submit offers when the RFP is issued, it is imperative that all prospective Offerors (including their subcontractors) be registered in the System for Award Management (SAM - www.SAM.gov) and the Procurement Integrated Enterprise Environment (PIEE) website in order to be able to view and download solicitation information, and to submit offers. b) Solicitation documents, plans, and specifications are only available to be download from PIEE, which may be accessed at https://wawf.eb.mil OR https://piee.eb.mil OR https://piee.eb.mil/xhtml/unauth/home/login.xhtml. c) Offers MUST BE submitted electronically through the PIEE website. d) Registration should be completed one (1) week prior to the anticipated solicitation release date. USACE will not notify Offerors of any changes to the solicitation; Offerors must monitor PIEE and SAM for the solicitation to be posted, and for any posted changes or amendments. e) See attachments - PIEE Solicitation Module Vendor Access Instructions-, -SOP PIEE Proposal Manager Offeror-, and -SOP PIEE Posting Offer- for instructions on getting access to the PIEE Solicitation Module and submitting Offeror proposals.
-Pre-SolicitationOpen
Design-Build MILCON Project P-481 Energy Resilience Phases 3 and 4 at Mountain Range Warfare Training Center (MWTC), Bridgeport, CA.
-Solicitation12/04/2025
Amendment 7- Extend proposal due date to 11/13/2026- California Oregon Transmission Project (COTP) Two-Phase Design-Build 525kV Series Capacitor Bank Replacement Project
-Solicitation11/13/2026
*** Amendment 0002 has been issued, extending proposals due date to 20 August 2026 at 09:00 AM PST*** ***Site Visit Sign In Sheet and Updated Wage Determinations are posted. See Amendment 0001 for details*** PROJECT TITLE: DDJC CENTRALIZED GAS AND ELECTRIC METERINGPROJECT LOCATION: TRACY, CALIFORNIATHE USACE SACRAMENTO DISTRICT (SPK) HAS A REQUIREMENT FOR DESIGN, FURNISH AND INSTALL OF THE NEW ADVANCED ELECTRIC AND NATURAL GAS METERS AND A CENTRALIZE UTILITY MONITORING STATION AT DEFENSE DISTRIBUTION DEPOT SAN JOAQUIN (DDJC) TRACY, CALIFORNIA. THIS REQUIREMENT CONSISTS PRIMARILY OF STANDARD ELECTRICAL CONSTRUCTION, CONDUIT INSTALLATION, AND THE INTEGRATION OF COMMERCIAL-OFF-THE-SHELF (COTS) METERING EQUIPMENT. THE INSTALLED COTS HARDWARE WILL POSSESS NATIVE, BUILT-IN CAPABILITIES TO OUTPUT STANDARD FORMAT DATA TO A LOCALIZED STATION, ALLOWING FACILITIES STAFF TO MONITOR ROUTINE USAGE AND VERIFY EQUIPMENT FUNCTIONALITY.NAICS: 237130SMALL BUSINESS ADMINISTRATION (SBA) SIZE STANDARD: $45 MILLIONSET-A-ASIDE: WOMEN OWNED SMALL BUSINESSES (WOSB)
-Solicitation08/20/2026

Additional Details

Solicitation Number

SP330023B0001

Archive Date

Dec 30, 2023

Office Address

NEW CUMBERLAND, PA, 17070-5008