Notice ID: 3cef9a8b74f2af4afda49bbef9b59c72Presolicitation
PANEL, STRUCTURAL
Archived on September 5, 2013. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 10:00 PM UTC+02:00
- Posted
- June 28, 2013
- Notice type
- Presolicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
Notice details
- Place of performance
- DLA AVIATION 8000 JEFFERSON DAVIS HWY, Richmond, 23297-5002
- PSC
- 16: AEROSPACE CRAFT COMPONENTS AND ACCESSORIES
- Last updated
- Dec 5, 2025
Identifiers
- Solicitation number
- SPE4A713R1482
- Notice ID
- 3cef9a8b74f2af4afda49bbef9b59c72
Description
"A copy of the solicitation will be available via the DLA Internet Bid Board System at https://www.dibbs.bsm.dla.mil/RFP on the same issue date cited in the solicitation. Choose the RFP you wish to download. Solicitations are in portable document format (PDF). To download and view these documents you will need the latest version of Adobe Arobat Reader. This software is available free at http://www.adobe.com. A paper copy of the solicitation will not be available to requestors. The solicitation issue date is July 22, 2013." Request 100% SBSA; suitable for competitive acquisition. Purchase Request # 0045532109, NSN 1560014951275, for Panel, Structural. Solicitation number cited as SPE4A713R1482 will result in a definite quantity of 6 each. Government First Article Testing (2each) is required with Government Test/Eval. The item description is in accordance with Basic DWG NR 43999 L3053644 dtd 04/22/1987 Requirements. Request delivery at 375 days total on the following; 90 days FAT delivery; 90 days Government Test/Eval with production lead-time is 195 days after testing approval. FOB Point @ Destination and Inspection & Acceptance at Origin requested. Export Control Certification required. Item is a Critical Application and Configuration Control applies. Item is not commercial and Progress Payments are authorized for this solicitation.
Award Overview
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
No documents available.
Lifecycle
Solicitation:
SPE4A713R1482- Pre-Solicitation
Formal solicitation typically follows within 30–60 days. (estimate)
- Pre-SolicitationCurrentJun 28, 2013
PANEL, STRUCTURAL
Similar Opportunities
Additional Details
Solicitation Number
SPE4A713R1482
Archive Date
Sep 5, 2013