Notice ID: 6701b37ff8a354f27e69f2c795fca3cbPresolicitation
TIMER DELAY ASSEMBLY
Archived on January 1, 2022. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 5:00 PM UTC−05:00
- Posted
- May 9, 2018
- Notice type
- Presolicitation
- NAICS
- 314999: All Other Miscellaneous Textile Product Mills
Notice details
- PSC
- 16: AEROSPACE CRAFT COMPONENTS AND ACCESSORIES
- Last updated
- Dec 6, 2025
Identifiers
- Solicitation number
- SPE4A718R1130
- Notice ID
- 6701b37ff8a354f27e69f2c795fca3cb
Description
PR 0073309913 NSN 1670-01-099-2380 Issue Date: May 24, 2018 Close Date: June 25, 2018 TIMER DELAY ASSEMBLY IAW BASIC DRAWING NR 81337 11-1-894 Requirement is a 100% Small Business Set-Aside, only small business will be considered for award. Electronic quotes are NOT acceptable for this solicitation. This Solicitation will result in a Firm Fixed Price, Definite Quantity Contract for a total quantity of 1745 each. Past Performance Information Retrieval System (PPIRS) applies. This is a Life Support Item therefore Surplus Material WILL NOT be accepted. Government First Article Test Requirement Government Production Lot Test Requirement Army Critical Safety Item Higher Level Quality is required. The required production lead-time is after receipt of order (ARO). FOB: Origin I: Origin A: Origin Phased delivery is not requested but acceptable. The final contract award decision may be based upon a combination of price, past performance, and other evaluation factors as described in the solicitation. Solicitations are in portable document format (PDF) to download and view these documents you will need the latest version of the Adobe Acrobat Reader. This software is available free at http://www.adobe.com. A paper copy of this solicitation will not be available to requestors. Electronic quotes are NOT acceptable for this solicitation. The solicitation package must be completed in its entirety prior to submission. Specifications, plans, or drawings relating to the procurement may be accessed on the "C folders" link from the DIBBS website. A copy of the solicitation will be available via the DLA Internet Bid Board System at https://www.dibbs.bsm.dla.mil/RFP on the issue date cited in the RFP on June 25, 2018.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
SPE4A718R1130- Pre-Solicitation
Formal solicitation typically follows within 30–60 days. (estimate)
- Pre-SolicitationCurrentMay 9, 2018
TIMER DELAY ASSEMBLY
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
SPE4A718R1130
Archive Date
Jan 1, 2022