GovChime
Notice ID: 3be8608767414c899711299117d1db32Special NoticeArchived

Heat Treat System with Integral Quench Furnace (IQF)

Archived on November 27, 2025. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
4:00 PM EST
Posted
October 28, 2025
Notice type
Special Notice
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
333517: Machine Tool Manufacturing
Agency
Department of WarDEFENSE LOGISTICS AGENCY

Notice details

Office
DLA AVIATION.DLA AV RICHMOND.DLA AVIATION
Place of performance
San Diego, California, 92135
Last updated
Nov 6, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
SPE4A826Q00010001
Notice ID
3be8608767414c899711299117d1db32

Description

The purpose of this amendment is to:

1. The solicitation SPE4A8-26-Q-0001, for One (1) Heat Treat System to include a Integral Quench Furnace (IQF), a parts washing station, and a tempering furnace and conveyor system with required BRAND NAME Components in accordance with Purchase Description VIBB 25-40-1013, Dated 26 June 2025, close date will be extended until COB 12 November 2025.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Documents

Files (3)

  • SPE4A826Q0001 Attachments.pdf

    1.8 MBAdded in Solicitation version 7Posted
    Download
  • SF30_SPE4A826Q0001_0001.pdf

    3.6 MBAdded in Special Notice version 6Posted
    Download
  • SF1449_SPE4A826Q0001.pdf

    268 KBAdded in Solicitation version 7Posted
    Download

Lifecycle

  1. 4
    Version 4SolicitationArchived

    Heat Treat System with Integral Quench Furnace (IQF)

    Notice 4715115e43d34144ae51265ab1d29d1b on SAM.gov

  2. 6
    Version 6Special NoticeArchivedCurrent

    Type changed from Solicitation to Special Notice

    Heat Treat System with Integral Quench Furnace (IQF)

    Notice 3be8608767414c899711299117d1db32 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
Heat Treat Ovens
62%
Combined Synopsis06/23/2026
Solicitation is in accordance with FAR 12 Simplified Procedures for Certain Commercial Products and Commercial Services. RFQ SPE4A8-27-Q-0007. Procurement of COOLANT SEPARATION SYSTEM in accordance with Purchase Request 26-65-1115 Dated September16, 2026. The contractor shall provide Coolant Separation System for Mattison Grinder Model LSG, Serial Number 21623, IL.GY.002-00 FILTRATION SYSTEM 132 GALLON TANK, PLS35/1000/100 FILTER MEDIA - 35 MICRON - POLYESTER FILTER MEDIA 35 MICRON, MK.001-003.01 UTOMAG 150 MAGNETIC PRE- FILTER, IUID TAG, and SHIPPING. Place Of Performance DLA IPE Services Division Mechanicsburg, PA 17050. This solicitation will be solicited for award of a Firm Fixed Priced Contract. Solicitation is Full and Open Competition. FOB at Destination with Inspection at Destination and Acceptance at Destination. All contractual performance period requirements shall be completed within 42 days after receipt of award. The final contract award decision may be based upon a combination of lowest price technically acceptable (LPTA), past performance and other evaluation factors as described in the solicitation. The estimated solicitation issue date is November 5, 2026. A copy of the solicitation will be available via the DLA Intranet Bid Board System (DIBBS) at https://www.dibbs.dla.mil/RFQ to obtain a copy of the solicitation. Choose the RFQ you wish to download. Solicitations are in portable document format (PDF). To download and view these documents you will need the latest version of Adobe Acrobat reader. This software is available free at http://www.abode.com.
54%
Pre-Solicitation11/05/2026
Industrial Router System
54%
Combined Synopsis07/24/2026
Onsite 2 day training course included for up to 10 people by a Certified Laser Safety Officer. Remote training online is an optional alternative. Training program includes mandatory online training. power and draws up to 15A.Fume Extractor Manufacturer: Fumex Inc.Origin: Made in USAModel: FA5-2 (Custom for GCLS)Dimensions: W 22.875?x L 20.5? x H 35.25?Input Power: 120V - 240VAC 60Hz (15.8A @120V)CFM: 450 cfm @ 39? wcFilters: Pre-filter, HEPA, Carbon/Gas/OdorVOC Sensor: Integrated VOC sensorGC-300 Laser System SpecificationsManufacturer: G.C. Laser Systems Inc.Model: GC-300Origin: Made in USADimensions: W 16.25?x L29? x H 22?Input Power: 100V-240V AC 50/60HzOutput Power: 300WLaser Class: Class 4Wavelength: 1064nmPulse Duration: 20ns ? 500ns (tunable)Pulse Energy: 2.0 mJ (max)Pulse Frequency: 10,000Hz ? 4,000,000HzScan Speed: 3,000-15,000 RPMInterface: Touchscreen. Integrated custom software. No external computers required.Important Notes: System will be configured to operate with existing YPG Robotic Laser Cleaning Copper Crusher Gauge System. For the GC-300 common accessories package, the laser system comes with 10 additional laser safety glasses, a large (4 foot cubed) laser cleaning cube, fume capture chamber, 450CFM fume extractor, 1 extra scan lens, 5 extra protective windows, and a rolling modular 12?x12? portable enclosure booth with one interlocked door and laser safety viewing window. Assembled 12?x12? enclosure setup with interlocked door and laser window. Door closed. Assembled 12?x12? enclosure setup with interlocked door and laser window. Door open with laser,fume extractor, and other items visible inside. place inside the cube, without the need to wear laser safety goggles. Only the laser operator, who enters the cube from the opening at the back wears laser safety goggles and everyone else can stand approximately 180 degrees around the front of the cube. No one stands behind the cube unless they have laser goggles on, and the cube should be positioned so that the back is facing a curtain or a wall and observers can only see it from the front and sides. A fume extractor is inserted into the cube from the back as well. The laser is only fired at samples or parts inside the middle of this cube that are placed on the bottom surface. Three sides and the top of the cube are made of laser safety windows. The laser safety windows in this cube have an OD of 9+ @1064nm. A standard cube measures 48? x 48? and is 48? tall. Other custom size cubes can be made on request. Materials being cleaned should be placed at the bottom of the cube so the laser is fired downward. The laser operator wears laser goggles while cleaning a sample inside the cube and anyone standing in front of the cube (in the green zone) does not need to wear laser goggles as they are viewing the process through the laser safety windows.
53%
Solicitation01/23/2026
LBNL’s Engineering Division provides advanced mechanical engineering, fabrication, and manufacturing support for scientific research across multiple DOE Office of Science facilities and programs. A large format wire EDM system supports this mission by enabling high-precision, non-contact machining of oversized, complex, or high-density components such as accelerator structures, detector chassis, superconducting magnet components, and specialized tooling ensuring parts meet the strict geometric tolerances, surface finish requirements, and material integrity essential for scientific instrumentation.
53%
Market Research11/18/2026

Additional Details

Solicitation Number

SPE4A826Q00010001

Archive Date

Nov 27, 2025

Office Address

RICHMOND, VA, 23237