Notice ID: 20d9b519fb148b113dc1e5565e59556bPresolicitation
GAGE, PRESSURE, MUNIT
Archived on July 16, 2019. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 12:00 PM UTC−05:00
- Posted
- June 14, 2019
- Notice type
- Presolicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 334513: Instruments and Related Products Manufacturing for Measuring, Displaying, and Controlling Industrial Process Variables
Notice details
- Place of performance
- SEE ABOVE
- PSC
- 10: WEAPONS
- Last updated
- Dec 6, 2025
Identifiers
- Solicitation number
- SPE7L319R0040
- Notice ID
- 20d9b519fb148b113dc1e5565e59556b
Description
Contract Specialist: Sheri Race Email: Sheri.Race@dla.mil Solicitation will be issued on or about: 07/02/19 Solicitation will close on or about: 08/06/19 NSN: 1095-01-640-8107 Nomenclature: GAGE, PRESSUE MUNIT Set-Aside Type: TOTAL SBSA Quantity: 15 BX (25 EACH BOX) Option: N/A FOB, Inspection, and Acceptance points as required per the solicitation. Required Delivery: 336 DAYS* *Includes GFAT & PLT 90 Days GFAT 45 Days Gov't Review 156 Days Production 45 Days PLT Ship-To Address: W25G1U W1A8 DLA DISTRIBUTION DDSP NEW CUMBERLAND FACILITY 2001 NORMANDY DRIVE DOOR 113 TO 134 NEW CUMBERLAND PA 17070-5002 US Approved Source(s) - GAGE, PRESSURE, DIAL UNIT OF ISSUE IS BX, BX = 25 RP001: DLA PACKAGING REQUIREMENTS FOR PROCUREMENT RA001: THIS DOCUMENT INCORPORATES TECHNICAL AND/OR QUALITY REQUIREMENTS (IDENTIFIED BY AN 'R' OR AN 'I' NUMBER) SET FORTH IN FULL TEXT IN THE DLA MASTER LIST OF TECHNICAL AND QUALITY REQUIREMENTS FOUND ON THE WEB AT: http://www.dla.mil/HQ/Acquisition/Offers/eProcurement.aspx. FOR SIMPLIFIED ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE SOLICITATION ISSUE DATE OR THE AWARD DATE CONTROLS. FOR LARGE ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE RFP ISSUE DATE APPLIES UNLESS A SOLICITATION AMENDMENT INCORPORATES A FOLLOW-ON REVISION, IN WHICH CASE THE AMENDMENT DATE CONTROLS. RQ001: HIGHER LEVEL CONTRACT QUALITY REQUIREMENTS (MANUFACTURERS AND NON-MANUFACTURERS) RQ002: CONFIGURATION CHANGE MANAGEMENT - ENGINEERING CHANGE PROPOSAL REQUEST FOR VARIANCE (DEVIATION OR WAIVER) RQ009: INSPECTION AND ACCEPTANCE AT ORIGIN RQ011: REMOVAL OF GOVERNMENT IDENTIFICATION FROM NON-ACCEPTED SUPPLIES RT001: MEASURING AND TEST EQUIPMENT _______________EXCEPTION DATA____________________ QAP 180: CHANGE GFAT QUANTITY FROM TWENTY (20) TO FIVE (5) CHANGE GPLT QUANTITY FROM TWENTY (20) TO FIVE (5) ON PAGE 4 OF 6: REMOVE (See Figure 1 for a cross section of a gauge.) Manufacture of the gauges shall be in accordance with the following: (a),,This gauge shall be manufactured in accordance with Dwg No. 0180. (b),,Serial Numbers for the gauges shall start at 0000. (c),,All tolerances, finishes, and treatment of materials shall be in strict conformance with dimensions and specifications shown on Dwg No. 0180. (d),,In the manufacture of this gauge, precision tool procedures are extremely critical to the successful production of the gauges to meet the requirements. (e),,All components must be free of burs, scratch marks, or any other defect which can affect the interchangeability of components as well as overall serviceability of the gauges. Preservation, Packaging, Packing, and Marking: (a),,All finished steel gauge components shall be given a coat of light oil by the manufacturer prior to shipping. (b),,Assembled gauges shall be individually wrapped in waxed or greased paper. They shall be shipped either in individual pasteboard cartons, and properly marked for identification. (c),,Marking for shipment shall be in accordance with MIL-STD-129. ______________END OF EXCEPTIONS__________________ THE ITEM BEING PROCURED IS A CRITICAL GUN PART ITEM WITH UNIQUE REQUIREMENTS. GOVERNMENT FAT APPLIES. AFTER RECEIPT OF QUOTES, OFFERORS MAY BE CONTACTED TO PRICE THE FAT REQUIREMENT. TWENTY (20) EXHIBITS ARE REQUIRED: TWENTY (20) MACHINED BUT NOT ASSEMBLED AND WITHOUT COATING. EXHIBIT DISPOSITION INSTRUCTIONS: TWENTY (20) PARTS WILL BE RETURNED TO THE CONTRACTOR AND CAN BE INCLUDED IN THE PRODUCTION QUANTITY. ZERO (0) WILL BE DAMAGED IN TESTING AND RETURNED TO THE CONTRACTOR. HARDNESS TESTING WILL BE PERFORMED ON ALL FAT EXHIBITS. PRODUCT INSPECTION WILL BE CONDUCTED BY THE DCMA QAR AT THE ACTUAL MANUFACTURER'S FACILITY. THE IDENTIFICATION OF THE ACTUAL MANUFACTURER MUST BE SUBMITTED TO THE CONTRACTING OFFICER FOR INCLUSION IN THE AWARD. UPON AWARD, ANY CHANGES TO THE ABOVE MUST BE APPROVED BY THE PCO VIA FORMAL CONTRACT MODIFICATION. PRODUCT VERIFICATION TESTING (PVT) IN ACCORDANCE WITH PROCUREMENT NOTE E05, MAY BE INVOKED FOR THE REFERENCED CONTRACT. IF INVOKED, PVT SAMPLES MUST BE INSPECTED, PACKAGED AND MARKED AS REQUIRED IN THE CONTRACT. ONE (1) SAMPLE MAY BE DESTROYED DURING TESTING. PRODUCT VERIFICATION TESTING, IF INVOKED<(>,<)> WILL BE PERFORMED PRIOR TO ACCEPTANCE OF EACH SHIPMENT. THE CONTRACTOR MUST PROVIDE PVT SAMPLES FROM EACH (SUB)CONTRACTOR USED IN THE PRODUCTION OF PARTS ON THIS CONTRACT. FIVE (5) PVT SAMPLES, UNLESS OTHERWISE SPECIFIED, WILL BE REQUIRED TO BE IDENTIFIED TO THOSE (SUB)CONTRACTORS WHEN THEY ARE SENT IN FOR TESTING. CERTIFICATE OF CONFORMANCE IS NOT AUTHORIZED. FIRST ARTICLE TESTING AND PRODUCTION LOT TESTING ARE REQUIRED FOR THIS CONTRACT IN ACCORDANCE WITH LATEST REVISION OF 0180 QAP (UNLESS WAIVED BY THE PROCUREMENT ACTIVITY). GFAT & PLT TESTING SHIP TO ADDRESS: W81C5M U.S. ARMY ABERDEEN TEST CENTER ATTN: TEDT-AT-SLE (Mr. Kevin Dowell) 400 COLLERAN ROAD ABERDEEN PROVING GROUND, MD 21005-5059 CONTRACTOR SHALL MARK EXTERIOR CONTAINER WITH 2" RED LETTERING AS FOLLOWS: "FIRST ARTICLE", OR "PRODUCTION LOT TESTING". CONTRACTOR SHALL PROVIDE PREPAID SHIPPING LABEL FOR RETURN OF FIRST ARTICLES/PRODUCTION LOT TESTING. FAT AND PLT EXHIBIT DUE DATES ARE BASELINES FOR SOLICITATION PURPOSES, PRIOR TO NEGOTIATION. CLASS I OZONE DEPLETING CHEMICALS ARE NOT TO BE USED NOR INCORPORATED IN ANY ITEMS TO BE DELIVERED UNDER THIS CONTRACT.THIS PROHIBITION SUPERSEDES ALL SPECIFICATION REQUIREMENTS BUT DOES NOT ALLEVIATE ANY PRODUCT REQUIREMENTS. SUBSTITUTE CHEMICALS MUST BE SUBMITTED FOR APPROVAL UNLESS THEY ARE AUTHORIZED BY THE SPECIFICATION REQUIREMENTS. WHEN FIRST ARTICLE IS REQUIRED IN THE CONTRACT, THE CONTRACTOR SHALL MARK THE OUTER SHIPPING CONTAINER IN 2 INCH BOLD, RED LETTERS "FIRST ARTICLE". THE CONTRACTOR SHALL ALSO PROVIDE THE TESTING FACILITY WRITTEN NOTIFICATION OF WHEN THE FIRST ARTICLES EXHIBITS WILL BE SHIPPED TWO WEEKS BEFORE THE SHIP DATE. This item has technical data some or all of which is subject to export-control of either the International Traffic in Arms Regulations (ITAR) or the Export Administration Regulations (EAR) and cannot be exported without the authorization of either the Department of State or the Department of Commerce prior to export. Export includes disclosure of technical data to foreign nationals whether located in the United States or abroad. This requirement applies equally to foreign national employees or U.S. companies and their foreign subsidiaries. DLA has enhanced its Joint Certification Program (JCP) registration and validation procedures. Selected National Stock Numbers (NSNs) will require additional permissions to access the associated technical data. In the event a vendor cannot access the technical data for a NSN in DLA cFolders, the vendor must submit a onetime request to jcpvalidation@dla.mil for technical data access consideration. If a vendor has inquiries after having submitted required information to the JCP office, these inquiries are to be directed to DLAJ344DataCustodian@dla.mil. DLA processes the vendor's technical data request on a first come, first served basis. Failure to comply timely with required information may result in lack of consideration for DLA solicitations. It is vitally important that vendors provide correct company official name(s) and contact information in all correspondence. DLA will work diligently on validating vendor requests. Vendors will be notified within 3 business days of when their requests were approved. However, DLA cannot guarantee that it can complete all validation requests by the due date for any solicitation responses. Serial numbers: In order for the contractor to fulfill this requirement, it will be necessary for the contractor to have or initiate serial number controls for each designated item and follow the government approved instructions. The serial number requirement applies to the end item(s) to be delivered under this contract and to any components of the end items(s) required to be serialized as required by this contract, whether produced by the Contractor or a subcontractor. If subcomponents are Government Furnished Parts (GFP), no reporting is required. Unless other specified, serial numbers for assets shall be assigned by the manufacturer performing the production operations and shall be assigned at the earliest preproduction opportunity in order to maintain traceability. Sequence: In the event the contractor does not have a serial number development and assignment system for production, the contractor shall submit a request for serial number assigned by the government engineering support activity. Duplication: In no event shall the contractor assign the serial numbers approved by the government for this contract to any other application WITH THE SAME BASE PART NUMBER, such as commercial sales of a different government contract; nor shall the contractor re-use a serial number assigned to a complete list of serial numbers delivered under this contract. Serial numbers not delivered under the contract must also be reported. EXAMPLE: Serial number XXXX assigned to an item was scrapped, or serial number XXXX did not meet contract requirements and was mutilated. Physical: During manufacture, if subsequent processes remove the serial number, provisions shall be made to relocate the serial number on another surface or tag before the original number is omitted. Documentation: The supplier and sub-contractors shall be responsible for maintaining traceability of all serial number(s) throughout manufacturing operations. The serial number shall be identified on all documentation i.e.; Process Certifications, NDT Certifications, Laboratory Certifications, Production Records, and Shipping Documents. Records shall be maintained for a period of seven (7) years postproduction. IAW BASIC DRAWING NR 52195 0180 REVISION NR DTD 07/21/2016 PART PIECE NUMBER: IAW REFERENCE QAP 16236 0180 REVISION NR DTD 06/21/2017 PART PIECE NUMBER: While pricing may be a significant factor in the evaluation of offers, the final award decision will be based on a combination of price, delivery, and performance. Reverse Auction procedures may be utilized in the final determination of price. All offers shall be in the English language and US dollars. All interested parties may submit an offer. DLA Internet Bid Board System (DIBBS) offers are acceptable for this solicitation. Offerors must complete the entire solicitation. Offers must be submitted on a hard copy of this SF 33 Request for Proposal (RFP), scanned, and uploaded through DIBBS (PREFERRED METHOD) or email proposals to: SHERI.RACE@DLA.MIL. One or more of the items under this acquisition may be subject to an Agreement on Government Procurement approved and implemented in the US by the Trade Agreements Act of 1979. All offers shall be in the English language and in US dollars. All interested suppliers may submit an offer. Based on market research this item is manufactured for military use only and is not commercial; therefore, the Government is not using the policies contained in FAR Part 12 in its solicitation for this item. However, interested persons may identify to the contracting officer their interest and capability to satisfy the Government's requirement with a commercial item with 15 days of this notice. This requirement will be solicited per FAR part 15.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
SPE7L319R0040- Pre-Solicitation
Formal solicitation typically follows within 30–60 days. (estimate)
- Pre-SolicitationCurrentJun 14, 2019
GAGE, PRESSURE, MUNIT
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
SPE7L319R0040
Archive Date
Jul 16, 2019