Notice ID: b7161e4bc0b4618cc474a1ecb2ba42c9Award NoticeAwarded
54--PANELING MATERIAL,B
Awarded on May 9, 2017. Full description on SAM.gov.
Awarded tounder SPE8ED17P0816 (source: SAM.gov award notice)• $34.2K
Overview
- Posted
- May 9, 2017
- Notice type
- Award Notice
- NAICS
- 332312: Fabricated Structural Metal Manufacturing
Notice details
- PSC
- 54: PREFAB STRUCTURES/SCAFFOLDING
- Last updated
- Dec 3, 2025
- Award date
- May 9, 2017
- Award amount (SAM.gov award notice)
- $34.2K
Identifiers
- Solicitation number
- SPE8ED17Q0494
- Notice ID
- b7161e4bc0b4618cc474a1ecb2ba42c9
- Award number (PIID)
- SPE8ED17P0816
Description
No Description Provided
Award Overview
Award Number
SPE8ED17P0816
Award Amount (SAM.gov award notice)
$34.2K
Award Date
May 9, 2017
Awardee
Awardee UEI
D1D6HBNDQ1L9
Original Solicitation
Notice ID: b7161e4bc0b4618cc474a1ecb2ba42c9
Posted Date: May 9, 2017
Original Response Deadline: Not specified
Contract Details
No FPDS record matches this award number at the same department yet
Contract details typically appear within 2-4 weeks after award; DoD awards are published about 90 days after signature.
Contacts
Contracting Officer
Primary Contact
Francis Brady215-737-9187 francis.brady@dla.mil
Documents
No documents available.
Lifecycle
Solicitation:
SPE8ED17Q0494- Awarded
This opportunity has been awarded.
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
The specificationd are general enough that to cover slip or flange joints. The drawings show flanged joints and that is what is required for this procurement. QUESTIONS AND ANSWERS: 1. Will Smooth Round poles will be a considered as an alternative to 12-sided hexagonal poles. ANSWER = NO. 2. The Quantity of poles in the bid schedule differs from the quantities listed on the engineered drawings. ANSWER = Use the quantities of poles listed in the BID SCHEDULE. 3.The ground sleeve in the drawing is shown at 7?-0 long that is, 5?-0 above grade and 2?-0 below grade. The bid description schedule calls out a 5?-0 ground sleeve 3?-0 above grade and 2?-0 below grade. ANSWER = Use the sleeve lengths specified in the SPECIFICATIONS. | - | Special Notice | Open |
11/10/2026: SOLICITATION AMENDMENT 0004 POSTED Solicitation amendment W912EF27QA011-0004 has been added. See amendment 0004 attachments for details _____________________________________________ 11/9/2026: SOLICITATION AMENDMENT 0003 POSTED Solicitation amendment W912EF27QA011-0003 has been added. See amendment 0003 attachments for details __________________________________________ 11/5/2026: SOLICITATION AMENDMENT 0002 POSTED: Solicitation amendment W912EF27QA011-0002 has been added to correct measurement in CLIN 0003 and clarify delivery location address. See attached for details ____________________________ SOLICITATION AMENDMENT POSTED: 11/2/2026: Solicitation amendment W912EF27QA011-0001 has been added to correct measurement in CLIN 0001 See attached for details _______________ LMA Diffuser Grating See attachments for Soliciation package requirements. | - | Combined Synopsis | 11/13/2026 |
Proposed procurement for NSN 6920014408050 SHOCK ABSORBING SKI: Line 0001 Qty 30 UI EA Deliver To: W1A8 DLA DISTRIBUTION By: 0300 DAYS ADO Line 0002 Qty 1 UI EA Deliver To: W1A8 DLA DISTRIBUTION By: 0180 DAYS ADO All responsible sources may submit a quote which, if timely received, shall be considered. Quotes may be submitted electronically. | - | Combined Synopsis | 11/17/2026 |
Proposed procurement for NSN 5305011025522 SCREW,CLOSE TOLERAN: Line 0001 Qty 23146 UI EA Deliver To: DLA DISTRIBUTION CHERRY POINT By: 0083 DAYS ADO Approved sources are 007R1 ST3M733-3L8; 06710 ST3M733-3L8; 06725 HT4057-3-8A; 06950 HT4057-3-8A; 0ZC92 ST3M733-3L8; 17446 HT4057-3-8A; 1VSL7 ST3M733-3L8; 27624 HT4057-3-8A; 56878 HT4057-3-8A; 58998 ST3M733-3L8; 59563 11935-3L8; 60516 WC4057-3-8; 73197 HT4057-3-8A; 76301 ST3M733-3L8; 80539 HT4057-3-8A; K5673 HT4057-3-8A; L4528 HT4057-3-8A. The solicitation is an RFQ and will be available at the link provided in this notice. Hard copies of this solicitation are not available. Specifications, plans, or drawings are not available. All responsible sources may submit a quote which, if timely received, shall be considered. Quotes must be submitted electronically. | - | Combined Synopsis | 11/17/2026 |
| - | Awarded | Open |
Additional Details
Solicitation Number
SPE8ED17Q0494
Archive Date
May 24, 2017