Notice ID: 14a6ee54e52f41398e7e04ce71c0265aCombined Synopsis/SolicitationArchived
Welder, Venture
Archived on July 10, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 3:00 PM HST
- Posted
- July 8, 2026
- Notice type
- Combined Synopsis/Solicitation
- Set-aside
- Small Business Set Aside - Total
- NAICS
- 333992: Welding and Soldering Equipment Manufacturing
- Agency
- Department of WarDEFENSE LOGISTICS AGENCY
Notice details
- Office
- DLA MARITIME - PEARL HARBOR
- Place of performance
- JBPHH, 96860
- Last updated
- Oct 28, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- SPMYM4-26-Q-0827
- Notice ID
- 14a6ee54e52f41398e7e04ce71c0265a
Description
This is a COMBINED SYNOPSIS/SOLICITATION for commercial items prepared in accordance with the information in FAR part 12, using Simplified Acquisition Procedures found at (FAR 13), as supplemented with the additional information included in this notice. This announcement constitutes the only solicitation; a written solicitation will not be issued. PAPER COPIES OF THIS SOLICITATION WILL NOT BE AVAILABLE. This combined synopsis/solicitation SHALL be posted to SAM.gov. The RFQ number is SPMYM4-26-Q-0827 for Welder, Venture. This solicitation documents and incorporates provisions and clauses in effect through FAC 2025-06 October 1, 2025, and DFARS Change Notice 20251110. It is the responsibility of the contractor to be familiar with the applicable clauses and provisions. The clauses may be accessed in full text at these address(s): https://www.ecfr.gov https://www.acquisition.gov/content/list-sections-affected http://www.acq.osd.mil/dpap/dars/change_notices.html The FSC Code is 3950 and the NAICS code is 333923. The Small Business Standard is 1250 employees. This requirement is 100% Small Business Set-Aside. Evaluation criteria are Lowest Price Technically Acceptable (LPTA). SPRS will be used to determine vendor responsibility. Potential contractors will be screened for responsibility in accordance with FAR 9.104. DLA Weapons Support, Pearl Harbor requests responses from qualified sources capable of providing the requested item(s). Interested parties must fill out the required request for quote form saved in the attachment section. Requirement is only one quote per vendor. Multiple quotes will not be accepted. Combined Synopsis Solicitaiton document must be filled out and returned as part of your quote Representation section of Clauses full text provisions and clauses must be filled out and returned
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Floyd Shiroma
Documents
Lifecycle
- 3Version 3Combined Synopsis/SolicitationArchivedCurrent
Welder, Venture
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Welding/Generator Machine | 84% | Combined Synopsis | 08/06/2026 |
AMENDING TO CORRECT CLOSING DATE FOR MILLER DYNASTY 800 WELDER PACKAGE | 78% | Combined Synopsis | 08/18/2026 |
MIG WELDER PACKAGE 3) General RequirementsThis section provides the specification requirements for the Welding Machine Package. Note: Every item listed in this section shall be accounted for in the offeror?s proposal for it to be considered (see section 6.).a) System shall meet all applicable OSHA standards and regulations.b) Vendor Shall ensure All Components of the system are compatible. c) Power supply shall have a minimum duty cycle of 100% at 36volts/400 amps.d) Machine Shall be compatible with 480-volt 3 phase power.e) System Shall be able to do the following processes,1. Shielded Metal Arc Welding (SMAW)2. Direct Current Gas Tungsten Arc Welding (DC GTAW)a. High Frequency Startb. Lift Arc3. Gas Metal Arc Welding (GMAW)4. Pulse Gas Metal Arc Welding (GMAW-P)5. Flux Core Arc Welding (FCAW)f) The wire feeder shall be a dual wire setup.1. The Wire feeder shall have a minimum duty cycle of 100% at 100 volts/600 amps.2. The Wire feeder Shall include spool covers for 33lb wire spools.3. The Wire feeder Shall include 2, 15ft (min) 300amp Mig gun assemblies.4. The Wire feeder Shall be compatible with ?Miller style? power pins on the Mig gun assemblies.5. Wire feeder control cable and weld power cable Shall be included.6. 25 ft work sense lead shall be included.7. Vendor Shall include Feeder drive roll kits of the following sizes (Dual size reversable are acceptable).a. .035 V-Grooveb. .045 V-Groovec. .062 V-Groove8. Vendor Shall include Wire Guides of the following sizes.a. .035b. .045c. .062g) System Shall include a wireless remote foot controller.1. Wireless foot control Shall accept ?AA? size batteries.2. Vendor Shall provide batteries to fill the controller not less than 2 times.h) System Shall include a heavy-duty foot control pedal with 20ft of cord.i) System Shall Include 2 Sheild Gas Flow meter regulators.j) System Shall include 2 gas hoses (4ft min).k) Machine must include a cooler.1. Cooler must be removeable for service/repair.l) Machine must have dedicated Tig Torch Connection.m) Machine must have dedicated Tig Gas hose Connection.n) Machine must have dedicated Tig Remote Connection.o) Machine must have dedicated Stick Connection.p) Machine must have dedicated Work cable Connection.q) Running Gear/Cart Shall be included.1. 2 brackets to stow the foot controls Shall be included.r) 25 ft(min) Work Lead Shall be included. | 78% | Combined Synopsis | 01/22/2026 |
WELDING MACHINE PACKAGE | 78% | Combined Synopsis | 12/24/2025 |
CORRECTION: IT IS ANTICIPATED THAT THE SOLICITATION WILL BE POSED ON GSA E-BUY WEBSITE ON OR ABOUT 14 NOVEMBER 2016 WITH PROPOSALS DUE BY 21 NOVEMBER 2016. | 71% | Pre-Solicitation | Open |
Additional Details
Solicitation Number
SPMYM4-26-Q-0827
Archive Date
Jul 10, 2026
Office Address
PEARL HARBOR, HI, 96860-5033