GovChime
Notice ID: 084b769c870c48f699a6dab7f2b675feSources Sought

70 CAL INTERFACE ASSY

Archived on August 16, 2026. Original response deadline: . Full description on SAM.gov.

Description

DLA Maritime Mechanicsburg is seeking sources capable of supplying the following items:

NSN 0OH 7025 016922013

NOM: CAL INTERFACE ASSY

QTY: 16

P/N:    8624537-1

Approved Design Cage Code:  Naval Sea Systems Command (53711)

Any source interested in supplying this item who is not the Original Equipment Manufacturer (OEM) must provide complete traceability information tracing material back to the OEM when offer is submitted.  Failure to provide this information may render your offer as non-responsive.

Sources capable of and interested in supplying this item should complete the attached market survey and return the completed copy via email to Brianne.Cracker@dla.mil by 2:00 PM EST on 08 June 2026.

DISCLAIMER:

THIS SOURCES SOUGHT NOTICE IS FOR INFORMATIONAL PURPOSES ONLY.  THIS IS NOT A REQUEST FOR PROPOSAL.  IT DOES NOT CONSTITUTE A SOLICITATION AND SHALL NOT BE CONSTRUED AS A COMMITMENT BY THE GOVERNMENT.  RESPONSES IN ANY FORM ARE NOT OFFERS AND THE GOVERNMENT IS UNDER NO OBLIGATION TO AWARD A CONTRACT AS A RESULT OF THIS ANNOUNCEMENT.  NO FUNDS ARE AVAILABLE TO PAY FOR PREPARATION OF RESPONSES TO THIS ANNOUNCEMENT.  ANY INFORMATION SUBMITTED BY RESPONDENTS TO THIS TECHNICAL DESCRIPTION IS STRICTLY VOLUNTARY.

Full description on SAM.gov

Overview

Agency:
Department of WarDEFENSE LOGISTICS AGENCY
Office:DLA MARITIME.DLA MARITIME MECHANICSBURG.SPRMM1 DLA MECHANICSBURG
Posted:June 1, 2026
NAICS:334111: Electronic Computer Manufacturing
Last Updated:Aug 21, 2026
PSC:Not specified
Set-Aside:No Set aside used
Type:Sources Sought
Place of Performance:Not specified

Award Overview

Possible prior contracts

Sign in to see possible prior contracts for this requirement (matched by agency, NAICS and place of performance; not confirmed).

Contacts

Contracting Officer

Primary Contact

Documents

Showing 1 of 1 items

Document
Source
Agency
Posted Date
File Size
Actions
Sources SoughtDEFENSE LOGISTICS AGENCYJun 1, 2026370.33 KB

Lifecycle

Solicitation:SPRMM126RGE20
  1. Market Research

Pre-solicitation or formal solicitation typically follows within 30–180 days. (estimate)

  1. Market ResearchCurrentJun 1, 2026

    70 CAL INTERFACE ASSY

    Notice 084b769c870c48f699a6dab7f2b675fe on SAM.gov

Similar Opportunities

Title
Phase
Agency
NAICS
Set Aside
Posted
Deadline
Location
ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|||X|ISO 9001 OR HIGHER||||| STOP-WORK ORDER (AUG 1989)|1|| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|TBD||TBD|TBD|TBD|TBD|TBD|TBD||||||||| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|Robyn Grinarml| VALUE ENGINEERING (JUN 2020)|3|||| INTEGRITY OF UNIT PRICES (NOV 2021)|1|| EQUAL OPPORTUNITY FOR VETERANS (DEV 2026-O0040)(FEB 2026)|4||||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (DEV 2026-O0040)(FEB 2026)|4||||| TRANSPORTATION OF SUPPLIES BY SEA (OCT 2024)|2||| FIRST ARTICLE APPROVAL--CONTRACTOR TESTING (DEV 2026-O0042)(FEB 2026)|10||||||||||| FIRST ARTICLE APPROVAL--GOVERNMENT TESTING (DEV 2026-O0042)(FEB 2026)|7|||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| WARRANTY OF DATA-BASIC (DEVIATION 2026-O0035) (FEB 2026)|2||| LIMITATION OF LIABILITY--HIGH-VALUE ITEMS (FEB 1997)|1|| ESTIMATE OF PERCENTAGE OF RECOVERED MATERIAL CONTENT FOR EPA DESIGNATED PRODUCTS (MAY 2008))|1|| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| ROYALTY INFORMATION (APR 1984)|1|| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||X| ONLY ONE OFFER (DEVIATION 2026-O0048)(MAR 2026)|1|| EVALUATION OF FIRST ARTICLE TESTING|3|||| THIS AMMENDMENT IS ISSUED TO UPDATE THE TDP VERSION FROM 002 TO 003. ALL OTHER TERMS & CONDITIONS REMAIN UNCHANGED. This solicitation is being issued under Emergency Acquisition Flexibilities (EAF) Authority formally known as Special Emergency Procurement Authority (SEPA). THIS IS A CRITICAL APPLICATION ITEM (CAI). Please email copy of quote/proposal to kenneth.lauber@dla.mil Drawings are not available. ALL PAR (POST AWARD REQUESTS) MUST BE SUBMITTED THROUGH THE NAVSUP WSS VENDOR PORTAL. PLEASE SEE CLAUSE WSSTERMHZ17 FOR DETAILED INSTRUCTIONS. PROCEDURES FOR CONTRACTORS TO REQUEST ACCESS TO WORKFLOW PRO (WFP) MOD ASSIST Please use the following address to open the NAVSUP WSS Workflow Pro (WFP) Mod Assist Vendor page: https://mynavsup.nag.navy.mil/apps/ops$workflow_pro.home To request an account, navigate to the bottom of the page and click Request Account. Fill in the information to create the user profile, you must select Robyn Grinarml as the POC from the drop-down menu. Select Privacy Act Agreement; after reading the statement, click Agree. When all data has been entered on the form, click the blue Submit button. Notification will be sent when the account is established. Should the Contractor experience concerns with the use of Mod Assist, the Contractor must contact Robyn Grinarml, robyn.grinarml@dla.mil \ 1. SCOPE 1.1 . Markings shall be in accordance with MIL-STD-130. 1.2 PRE-AWARD / POST AWARD REQUIREMENTS: Due to the critical use of this item and its quality history, a pre-award survey and post-award conference may be required for all new manufacturers. For all previous sources, a post-award conference may be recommended. 1.3 The components being acquired under this solicitation have been classified as Flight Critical requiring engineering source approval by the Naval Air Systems Command. Only those companies who have submitted requests for source approval and been approved will be eligible for award under this solicitation. Any company not previously approved may submit a Source Approval Request to the contracting officer, Naval Inventory Control Point, (See Block 10 of the SF33 for name and code). The Source Approval Request shall contain the following documentation and shall be submitted by the closing date of this solicitation: (A) Copy of complete configuration drawings for a similar item(s) which your company has produced within the past three years, including test procedures for which your company (1) has been qualified to manufacture and (2) which is similar, i.e., requires the same materials, manufacturing processes, inspections, tolerances and similar application as the item(s) for which you are seeking approval. (B) Copy of the complete process/operation sheets used to manufacuture the similar item, including but not limited to, detailed shop sketches. These plans must note those operations and processes performed by subcontractors/ vendors. (C) Complete copies of purchase orders, shipping documents, etc. that document delivery of production quantities of the part to the Original Equipment Manufacturer or Military service. Provide the most recent copies of the documents. (D) A detailed comparative analysis of the differences/similarities between the similar part and the part(s) for which you are seeking approval. This analysis should include materials, configuration, tolerances, process requirements, dimensions, castings, forgings, etc. (E) Copy of inspection method sheets used in the manufacturing and at final inspection. These sheets should include actual tolerance, print requirements, inspection devices, sources performing the operation and level of inspection. Critical characteristics should be discernible from all other characteristics. The above requirements are a subset of requirements specified in the ASO Source Approval Information Brochure dated January 1995. The submission of this data subset is contingent upon and in consideration of the submitting contractor meeting all other requirements specified in this solicitation to include a bilateral agreement with MDA which includes availability of complete data, MRB disposition, etc. Any company not having such agreement, but desiring to seek engineering source approval, will be required to submit data meeting all requirements of the ASO/NAVICP Source Approval Brochure. 1.4 Sampling rates (AQLs) indicated below shall be used in accordance with ANSI Z1.4 for Single Sampling and a General Inspection Level of II. 1.5 In addition to the 100% PCO Mandatory, critical and major characteristics, attributes for plating, hardness and non-destructive testing will be inspected one hundred percent. 1.6 Contractor shall develop a system for identification of individual piece parts for traceability purposes. Markings shall not be permanent. 1.7 An AQL of 1.5 will be used for Class 3 threads and dimensions, and geometric feature controls with a tolerance range of .010 or less. 1.8 For minor characteristics, a sampling rate determined by the contractor and subject to QAR approval will be used. 1.9 The material covered in this contract/purchase order will be used in a crucial shipboard system enabling the launch and/or recovery of aircraft. The use of incorrect or defective material would create a high probability of failure resulting in a serious personnel injury, loss of life, loss of vital shipboard systems or loss of aircraft. Therefore,the material has been designated as Critical material and special control procedures are invoked to ensure receipt of correct material. 1.10 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;3429AS6920; drawing number ( ;(30003); ) ;REVSION NONE; , Revision ;NAWC LAKEHURST; and all details and specifications referenced therein. 1.11 Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.12 If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C. 2. APPLICABLE DOCUMENTS DRAWING DATA=NAWCADLKE-MISC-482300-0480 |30003| D| |D| | | | DRAWING DATA=NAWCADLKE-MISC-482300-0546 |30003| -| |D| | | | DRAWING DATA=3429AS4108 |30003| D| |D| | | | DRAWING DATA=3429AS4900 |30003| F| |D| | | | DRAWING DATA=3429AS4914 |30003| D| |D| | | | DRAWING DATA=3429AS4918 |30003| D| |D| | | | DRAWING DATA=3429AS4960 |30003| A| |D| | | | DRAWING DATA=3429AS4961 |30003| C| |D| | | | DRAWING DATA=3429AS6920 |30003| -| |D| | | | DRAWING DATA=3429AS6924 |30003| -| |D| | | | DRAWING DATA=3429AS6926 |30003| -| |D| | | | DRAWING DATA=3429AS6927 |30003| -| |D| | | | DRAWING DATA=3429AS6928 |30003| -| |D| | | | 3. REQUIREMENTS - NOT APPLICABLE 4. QUALITY ASSURANCE QUALITY ASSURANCE REQUIREMENTS 1.The contractor shall perform Quality Conformance and Lot Sampling Inspection for all associated features that are present in the drawings and specifications: a. Features/attributes/requirements classified as Critical and Major on the drawing(s) or within the technical specification shall be inspected and shall have the actual dimensions documented 100%; b. Attributes for plating, hardness, and non-destructive testing shall be inspected 100%; c. Class 3 Threads, dimensions, and geometric feature controls with a tolerance range of .010 or less shall be inspected using an AQL of 1.5 and the General Inspection Level II as defined by ANSI Z1.4 d. Minor Characteristics: Sampling shall be inspected using an AQL of 4.0 and the General Inspection Level II as de-fined by ANSI Z1.4. 2. First Article Testing: The contractor shall conduct First Article testing on this item of ALRE/SE and must address all elements listed below and prepare a First Article Test Report documenting the outcome. Unless otherwise specified, the report and its acceptance shall be per the provisions of the applicable Contract Data Requirements List (CDRL). a. Requirements: i. First Article quantity is one (1); in uncoated condition. ii. The First Article shall be available for Government evaluation per the contract schedule. The Evaluation shall be conducted in the presence of the Government personnel. iii. The contractor shall provide facilities and personnel sufficient to conduct all necessary tests to establish conformance; iv. The contractor shall have available for review all certifications, test reports, in-process inspection documents needed to substantiate product quality; this same documentation shall also be included in the First Article test report; v. The contractor shall, at the time of First Article, have corrected any problem areas deemed significant and documented as deficient by the Government within his/her Quality Assurance system not previously identified during prior evaluations and/or surveys; any problems identified during the conduct of the test will also require correction. b. Testing and evaluation: i. The contractor shall accomplish 100% inspection and/or testing of all critical, major, and minor dimensions and/or requirements identified in the drawings, drawing notes, and process and fabrication specifications. Results shall consist of actual dimensions, measurements, and test outcomes and shall be recorded and included in the First Article test report. c. Acceptance/reject criteria: i. Satisfactorily meeting all requirements cited in the First Article Testing "Requirements" paragraph above and satisfactorily demonstrating100% conformance to the test and evaluation elements cited in the First Article Testing "Testing and evaluation" paragraph above shall constitute acceptance of the First Article: ii. Failure to meet any of the conditions in the First Article Testing "Requirements" paragraph above or the First Article Testing "Testing and evaluation" paragraph above shall be cause for rejection. d. Delivery: i. The accepted First Article exhibit may be delivered and counted along with the contract production quantities providing the item has not been damaged during testing, and has been found to be conforming; ii. The contractor is responsible for preparing the First Article Test Report in accordance with CDRL's. 3.Production Lot Special Tests: N/A 4.N/A 5.N/A 4.1 Review documentation as provided under DD 1423 requirements. 4.2 The test to be performed under the First Article approval clause (FAR 52.209-3) of the contract are listed below 4.2.1 Dimensional test (special) ;APPLIES; 4.2.2 Requirements of: ;NAWC LAKEHURST; 4.2.3 Form ;APPLIES; 4.2.4 Fit ;N/A; 4.2.5 Function ;N/A; 4.2.6 Compliance with drawing ( ;(30003); ) ;3429AS6920; , Revision ;REVISION NONE; and specifications referenced therein. 4.3 In addition to the above tests, the First Article(s) to be inspected hereunder shall also be subjected to those tests which will demonstrate that the article(s) comply with the contract requirements 4.4 The contractor shall be responsible for providing the necessary parts and repair of the First Article Sample(s) during inspection 4.5 The contractor shall notify the PCO, ACO, and QAR fourteen (14) days prior to conducting the First Article test so that the Government may witness such testing. 4.5.1 The QAR shall be present to witness all First Article Testing. 4.5.2 The following additional personnel shall witness the First Article Testing: ;DCMA QAR; 4.6 Disposition of FAT samples 4.6.1 ; ; Sample(s) may be destroyed during testing. 4.6.2 ;APPLIES; Unless otherwise provided for in the contract, sample(s) shall remain at the contractor and may be considered as production items under the contract provided the sample(s) can be refurbished to ready for issue condition and provided the sample(s) have inspection approval of the cognizant DCMC QAR. Sample(s) may be shipped as production items only after all other units required under the contract have been produced and are ready for shipment. 4.7 Test Sample Coating Instructions 4.7.1 Samples are to be unpainted. Corrosive areas are to be coated with a light preservative if required. 4.8 Notice to Government of Testing at the contractors facility. 4.8.1 FAR 52.209-3 applies (A) The contractor shall present ;ONE; ; unit(s) of the following CAGE( ;(30003); ; ), Part Number ;3429AS6920-1; ; , Revision ;REVISION NONE; ; as specified in this contract. At least fourteen (14) calendar days before the beginning of the First Article testing, the contractor shall notify the contracting officer, in writing, of the time and location of the testing so that the Government may witness the tests. (B) The contractor shall submit the First Article Test Report within 15 calendar days from the date of testing to: ;P.C.O; ; The contractor shall mark the report "First Article Test Report" and cite the contract number and lot/item number. Review documentation as provided under the DD1423 requirements. (C) Within 45 calendar days after the Government inspects the First Article, the contracting officer shall notify the contractor, in writing, of the approval, conditional approval, or disapproval of the First Article. The notice of approval, conditional approval, or disapproval shall not relieve the contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the contractor. A notice of disapproval shall cite reasons for disapproval. (D) If the First Article is disapproved, the contractor, upon Government request shall repeat any or all First Article Tests. After each request for additional tests, the contractor shall make any necessary changes, modifications, or repairs to the First Article or select another First Article for testing. All costs related to these tests are to be borne by the contractor, including any and all costs for additional tests following a disapproval. The contractor shall then conduct the tests and deliver another report to the Government under the terms and conditions and within the time specified in paragraph B above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule or for any additional costs to the Government related to these tests. (E) If the contractor fails to present any First Article on time, or the contracting officer disapproves any First Article, the contractor shall be deemed to have failed to make delivery within the meaning of the default clause of this contract. (F) Unless otherwise provided in the contract, and if the approved First Article is not consumed or destroyed in testing, the contractor may deliver the approved First Article as part of the contract quantity if it meets all contract requirements for acceptance. (G) If the Government does not act within the time specified in paragraph (C) above the contracting officer, shall, upon timely written request from the contractor, equitably adjust under the Changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay. (H) Before First Article Approval, the acquisition of materials or components for, or the commencement of production or, the balance of the contract quantity is at the sole risk of the contractor. Before First Article approval, the costs thereof shall not be allocated to this contract for 1) progress payments, or 2) termination settlements if the contract is terminated for the convenience of the Government. The contractor is responsible for providing operating and maintenance instructions, spare parts, and repair of the First Article during any First Article test. (I) The contractor shall produce both the First Article and the production quantity at the same facility and shall submit a certification to the effect with each First Article. (J) The test report (2 copies) shall be in accordance with MIL-STD-831, unless otherwise specified on the DD1423, and shall be submitted via the cognizant DCMC to NAVSUP, ATTN: (Cite name and code in Block 10.a of the SF33). The DCMC shall provide comments on Form DD1222 (2 copies) which shall be forwarded with the test report. Approval of the test report is the PCO's responsibility. Upon notification of approval, condition approval, the ACO shall execute the DD250 to indicate Government acceptance of the test report. 4.9 Alternate Offers - Waiver of First Article Approval Requirements. (The following provisions supersede any waiver of First Article Approval Requirements terms set forth in clause 52.209-3 or 52.209-4 as appropriate) (A) Unless otherwise specified in the solicitation, NAVSUP WSS reserves the right to waive the First Article Approval Requirements specified herein for offerors who have previously furnished identical production articles accepted by the Government or the Original Equipment Manufacturer/Prime Manufacturer. An offeror requesting waiver of First Article Requirements shall submit evidence with its offer establishing that: (I) the last production unit was delivered within three (3) years of the issue date of this solicitation, and (II) the production location to be used for this requirement is the same as used for the previous production run. Additionally, the offeror shall submit a certification, to be executed by the officer or employee for the offer, stating that: (I) the articles to be provided will be produced using the same facilities, processes, sequences of operations and approved subcontractors as those previously delivered and accepted by the Government or the Original Equipment Manufacturer/Prime Manufacturer, and (II) the previous production units were manufactured without Material Review Board disposition or waiver/deviation request or rejection of pre-production samples for cause. (NOTE: This certification concerns a matter within the jurisdiction of an agency of the United States and the making of a false, fictitious, or fraudulent certification may render the maker subject to prosecution under Title 18, United States Code, Section 1001.) (B) Offerors requesting waiver of First Article Approval Requirements under the provisions of this clause are cautioned to submit two prices for articles required herein - one that is based on compliance with the First Article Approval Requirements and one that is based on a waiver of such requirements. Where an offeror submits only one price and fails to clearly state that the price is based on waiver of the First Article Approval Requirements it will be deemed to be based on compliance with the First Article Approval Requirements (C) In the event of the First Article Approval Requirement is granted, the delivery schedule for the production items shall be reduced by the number of days designated for delivery of First Article Test unit plus the number of calendar days indicated for the government notification of conditional approval or approval. These requirements are specified in the quality assurance section of this solicitation. If the offeror is unable to meet the desired schedule, he shall insert below the alternate delivery schedule he offers to the government. Offeror's Proposed Alternate Delivery Schedule (Based on waiver of First Article Approval Requirements) Within Days: Item No. _____________ Quantity:_______ After Date of Contract:_________ 4.10 . Mandatory Inspection Requirements: 100% Procurement Contracting Officer (PCO) mandatory inspection is required and shall be accomplished at source under the surveillance and final approval of the cognizant DCMAO Quality Assurance Representative (QAR). During production, mandatory inspection is required to be accomplished by the contractor as follows: A. Level of Inspection (LOI). 1. Critical characteristics: 100% inspection shall apply. 2. Major and Minor characteristics: LOI shall be in accordance with a sampling plan acceptable to the QAR. B. Critical characteristics: ;DCMA QAR; C. Major and Minor characteristics 1. Shall be defined by the contractor subject to QAR concurrence, unless defined on applicable drawings and associated specifications. 4.11 FINAL INSPECTION REQUIREMENT:Due to the critical nature of this item, representatives of the buying office/and the cognizant field activity, NAWC Lakehurst, shall be notified by the successful contractor at least 14 days prior to presentation to the DCM QAR of the items for final inspection so that they may have the option of witnessing the final inspection. The contractor shall notify by email or TELEFAX PCO and NAWC Lakehurst QA ;DCMA QAR; to arrange for the final inspection.The authority of the QAR shall not be abrogated. If the notification is not given to both sites then the QAR shall not accept the units. 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE THIS IS AN ALRE CRITICAL APPLICATION ITEM. FOR DRAWING UPDATES, SEE ATTACHED NAWC LKE DRAWING UPDATE SHEET. NAVSUP REFERENCE ONLY: PROCUREMENT TDR (25-10143): THE COMPONENTS BEING ACQUIRED UNDER THIS SOLICITATION HAVE BEEN CLASSIFIED AS "CRITICAL" REQUIRING ENGINEERING SOURCE APPROVAL BY NAVAL AIR SYSTEMS COMMAND ONLY THOSE COMPANIES WHO HAVE SUBMITTED AND BEEN APPROVED WILL BE ELIGIBLE FORAWARD UNDER THIS SOLICITATION. ANY COMPANY MAY SUBMIT A SOURCE APPROVAL REQUEST AS OUTLINED IN THIS SOLICITATION. All records pertaining to ALRE CSI/CAI manufacture and inspection/test shall be provided to the ALRE Cognizant Technical Authority. All records shall be maintained by LKE QA and by the manufacturer for a period of seven years. DATE OF FIRST SUBMISSION=ASREQ 16. REMARKS: (Block 12) DATE OF FIRST SUBMISSION: Concurrently with delivery of FAT Items Inspection/Certification data needed to substantiate the Quality of the First Article Test unit shall be included in First Article unit packaging. The outside of the package that contains the data shall be clearly marked "INSPECTION/CERTIFICATION DATA INCLUDED". Data Requirements: a. Copies of all approved requests for variations. b. Material properties per Drawing 3429AS6920. c. Identification, including photos of all identifiers on the part, per Drawing 3429AS6920, 3429AS4108, 3429AS4900, 3429AS4918, 3429AS4960, 3429AS4961, 3429AS6924, 3429AS6926, 3429AS6927, 3429AS6928. d. Assembly/installation per Drawing 3429AS6920, 3429AS4900, 3429AS4914, 3429AS4960, 3429AS4961. e. Software installation per Drawing 3429AS6920. f. Testing per Drawing 3429AS6920. g. Dimensional inspection per Drawing 3429AS6920, 3429AS4961. h. Handling and storage per Drawing 3429AS4918. i. Environmental requirements per Drawing 3429AS4918. DATE OF FIRST SUBMISSION=ASREQ 16. REMARKS: (Block 12) DATE OF FIRST SUBMISSION: Concurrently with Final Inspection Data Requirements a. Copies of all approved requests for variations. b. Material properties per Drawing 3429AS6920. c. Identification, including photos of all identifiers on the part, per Drawing 3429AS6920, 3429AS4108, 3429AS4900, 3429AS4918, 3429AS4960, 3429AS4961, 3429AS6924, 3429AS6926, 3429AS6927, 3429AS6928. d. Assembly/installation per Drawing 3429AS6920, 3429AS4900, 3429AS4914, 3429AS4960, 3429AS4961. e. Software installation per Drawing 3429AS6920. f. Testing per Drawing 3429AS6920. g. Dimensional inspection per Drawing 3429AS6920, 3429AS4961. h. Handling and storage per Drawing 3429AS4918. i. Environmental requirements per Drawing 3429AS4918. j. Plating per Drawing 3429AS4918.
Solicitation334111No Set-Aside10/22/202610/30/2026-
ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION AND ACCEPTANCE - SHORT VERSION|8|X||X|||||| INSPECTION AND ACCEPTANCE OF SUPPLIES|26||||||||||||||||||||||||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT (COMBO)||TBD|SPRMM1|TBD|TBD|TBD|TBD|||TBD|||||TBD| NOTE FOR CONTRACTOR/ADMINISTRATIVE CONTRACTING OFFICER|3|||| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|| NOTICE OF CYBERSECURITY MATURITY MODEL CERTIFICATION LEVEL REQUIREMENTS (NOV 2025))|1|| FEDERAL ACQUISITION SUPPLY CHAIN SECURITY ACT ORDERS-PROHIBITION (DEC 2023)|12||||||||||||| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| 1. All contractual documents (i.e. contracts, purchase orders, task orders, Delivery orders, and modifications) related to the instant procurement are considered to be "issued" by the government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, such as email. The government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein. 2. Drawings or technical data are not available for this item. 3. Delivery days_________ARO. 4. Offer valid for _____ days. 5. When submitting quotes via Electronic Data Interchange (EDI), make sure you specify any exceptions (i.e. Mil specs/standards, packaging, Inspection & Acceptance (I&A), packaging houses etc) or follow up with a hardcopy of the exceptions. If nothing is indicated or received, award will be based upon solicitation requirements. Changes or requests for changes after award will have consideration costs deducted on modifications. 6. If you are not the manufacturer of the material you are offering, you MUST state who the Original Equipment Manufacturer (OEM) is �Commercial and Government Entity Code (CAGE) code� and the part number you are offering. 7. Please provide an email address for follow up communications. ____________________________________________________________ 8. It is recommended that vendors provide contact information to NAVSUP Weapon System Support (WSS) Mechanicsburg in order to receive automated notifications from Navy Electronic Commerce Online (NECO) when contracts/modifications are issued by Defense Logistics Agency (DLA) Weapons Support Mechanicsburg and posted on Procurement Integrated Enterprise Environment (PIEE) Electronic Data Access (EDA). To receive these notifications, contact: NAVSUPWSS code 025, procurement systems design and contract support division Via email at NAVSUPWSSITIMPHelpdesk@navy.mil. Please include the following information with your request: CAGE code, company name, address and Point-of-Contact (POC) with phone number and email address. 9. Contractors can view their orders, contracts and modifications at the EDA web tool. This web tool is located at the PIEE website. It is recommended that the contractor register for EDA at https://piee.eb.mil/. Click on new user and registration. Any order resulting from this Request for Quotation will require electronic submittal of Invoice and Receiving Report (COMBO) through PIEE-WAWF. 10. The following DLA Procurement Notes are applicable to this requirement: E06 Inspection and Acceptance at Source (JUN 2018) 11. INSPECTION OF MATERIAL WILL BE AT (CAGE & ADDRESS): ______________________________________________________________ INSPECTION OF PACKAGING AND FINAL ACCEPTANCE OF MATERIAL WILL BE AT (CAGE & ADDRESS): ______________________________________________________________ INSPECTION OF PACKAGING AND FINAL ACCEPTANCE OF MATERIAL WILL BE AT (CAGE & ADDRESS): ______________________________________________________________ We are requesting that the quote's validity extend for 90 days from thesubmitted proposal quote date. 12. UCF SECTION F PRODUCTION FACILITY CHANGES (a) The performance of any of the work contracted for in any place other than that named in the contract is prohibited unless specifically approved by the Contracting Officer. Written requests for a change in production facilities must be submitted in writing to the Contracting Officer. Changes inproduction facilities may be approved, provided: (1) Performance by small business or in labor surplus areas as required by the contract will not be changed; (2) The change will not cause a delay in delivery or necessitate a change in the purchase description; (3) The free on board (f.o.b.) point is not changed; and (4) Each request is supported by a price reduction of $250.00 to cover the Government's administrative costs to process the change. (b) The Government reserves the right to deny approval even if these four elements are met. \ 1. SCOPE 1.1 This contract/purchase order contains the requirements for manufacture and the contract quality requirements for the SNGL BOARD COMPUTER . 2. APPLICABLE DOCUMENTS 2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.1.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 3. REQUIREMENTS 3.1 Cage Code/Reference Number Items - The SNGL BOARD COMPUTER furnished under this contract/purchase order shall be the design represented by Cage Code(s) reference number(s). Cage _______ ref. no. ;06401 67207-03; 3.2 Marking - This item shall be physically identified in accordance with ;MIL-STD-130, REV N, 16 NOV 2012; . 3.3 Changes in Design, Material Servicing, or Part Number - Except for a Code 1 change, which shall be processed as provided in the code statement shown below, no substitution of items shall be made until the NAVICP-MECH Contracting Officer has notified and approval has been given by issuance of a written change order. When any change in design, material, servicing or part number is made to replace or substitute any item to be furnished on this contract/purchase order, the Contractor shall furnish, for the substituting/replacement item, a drawing and an explanation of the reason for the change, explaining the reason therefor. If finished detail drawings are not available, shop drawings in the form used by the manufacturer will be acceptable for Government evaluation. When notifying the Procurement Contracting Officer of the reasons for making substitutions, the type of change shall be indicated by code number in accordance with one of the following statements: Code 1: PART NUMBER CHANGE ONLY - If the Manufacturer's Part Number indicated thereon has changed, but the parts are identical in all respects, supply the item and advise NAVICP-MECH immediately of the new part number. Code 2: Assembly (or set or kit) not furnished - Used following detail parts. Code 3: Part not furnished separately - Use assembly. Code 4: Part redesigned - Old and new parts are completely interchangeable. Code 5: Part redesigned - New part replaces old. Old part cannot replace new. Code 6: Part redesigned - Parts not interchangeable. 4. QUALITY ASSURANCE 4.1 Responsibility for Inspection - Unless otherwise specified in the contract/purchase order, the Contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the contract/purchase order, the Contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements. 4.2 Responsibility for Compliance - All items must meet all requirements of this contract/purchase order. The inspection set forth in this specification shall become a part of the Contractor's overall inspection system or quality program. The absence of any inspection requirements shall not relieve the Contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract/purchase order. Sampling in quality conformance does not authorize submission of known defective material, either indicated or actual, not does it commit the Government to acceptance of defective material. 4.3 Records - Records of all inspection work by the Contractor shall be kept complete and available to the Government during the performance of contract/purchase order and for a period of 365 calendar days after final delivery of supplies. 5. PACKAGING 5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking shall be in accordance with the Contract/Purchase Order Schedule and as specified below. MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES 6.1 Ordering Information for Document References - The Department of Defense Single Stock Point (DODSSP), Website http://www.dsp.dla.mil/, provides product information for the Department Of Defense Index Of Specifications and Standards (DODISS) (i.e.Military/Federal Specifications and Standards), Data Item Descriptions (DIDs), and other DODSSP Products. Most Specifications can obtained directly from http://quicksearch.dla.mil/ A. Availability of Cancelled Documents - The DODSSP offers cancelled documentsthat are required by private industry in fulfillment of contractual obligationsin paper format. Documents can be requested by phoning the Subscription Services Desk. B. Commercial Specifications, Standards, and Descriptions - These specifications, standards and descriptions are not available from Government sources. Theymay be obtained from the publishers of the applicable societies. C. Ordnance Standards (OS), Weapons Specifications (WS), and NAVORD OSTD 600 Pages - These type publications may be obtained by submitting a request to: Commander, Indian Head Division, Naval Surface Warfare Center Code 8410P, 101 Strauss Avenue Indian Head, MD 20640-5035 D. On post-award actions, requests for "Official Use Only" and "NOFORN" (Not Releasable To Foreign Nationals) documents must identify the Government ContractNumber, and must be submitted via the cognizant Defense Contract Management Command (DCMC) for certification of need for the document. On pre-award actions such requests must be submitted to the PCO for certification of need for the document. E. NOFORN Military Specifications and Standards (including Amendments, Change Notices and Supplements, but NOT interim Changes) to be ordered from: Contracting Officer NAVSUP-WSS Code 87321 5450 Carlisle Pike P.O. Box 2020 Mechanicsburg, Pa. 17055-0788 F. Nuclear Reactor Publications Assigned NAVSEA Documents and Identification Numbers (i.e. NAVSEA Welding Standard, NAVSEA 250-1500-1) are to be ordered enue: Commanding Officer NAVSUP-WSS Code 009 5450 Carlisle Pike P.O. Box 2020 Mechanicsburg, Pa. 17055-0788 G. Technical Manuals Assigned NAVSEA Identification Numbers (i.e. NAVSEA Welding And Brazing Procedure, NAVSEA S9074-AQ-GIB-010/248) are to be ordered from: Commanding Officer NAVSUP-WSS Code 1 Support Branch 700 Robbins Avenue Philadelphia, Pa. 19111-5094 H. Interim Changes and Classified Specifications must be obtained by submitting a request on DD Form 1425 to NAVSUP-WSS. 6.2 In accordance with OPNAVINST 5510.1 all documents and drawings provided by the U.S. Navy to perspective Contractors must include a "Distribution Statement" to inform the contractor of the limits of distribution, and the safeguarding of the information contained on those documents and drawings. There are 7 (seven) seperate distribution statement codes used for non-classified documents and drawings. The definition for each is as follows: A... approved for public release; distribution is unlimited. B... distribution authorized to US Governments agencies only. C... distribution authorized to US Government agencies and their contractors. D... distribution authorized to DoD and DoD contractors only. E... distribution authorized to DoD Components only. F... further distribution only as directed by Commander, Naval Sea Systems Command, code 09T. X... distribution is authorized to US Government agencies and private individuals or enterprises eligible to obtain export controlled technical data in accordance with OPNAVINST 5510.161. 6.3 Notice To Distributors/Offerors - Consideration for award of contract shall be given only to authorized distributors of the original manufacturer's item represented in this solicitation. If you desire to be considered as a potential source for award of this contract, proof of being an authorized distributor shall be provided on company letterhead signed by a responsible company official and sent with your offer to the Procurement Contracting Officer.
Solicitation334111No Set-Aside10/22/202611/02/2026-
ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|||X|ISO 9001 OR HIGHER||||| STOP-WORK ORDER (AUG 1989)|1|| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|TBD||TBD|TBD|TBD|TBD|TBD|TBD||||||||| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|Robyn Grinarml| VALUE ENGINEERING (JUN 2020)|3|||| INTEGRITY OF UNIT PRICES (NOV 2021)|1|| EQUAL OPPORTUNITY FOR VETERANS (DEV 2026-O0040)(FEB 2026)|4||||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (DEV 2026-O0040)(FEB 2026)|4||||| TRANSPORTATION OF SUPPLIES BY SEA (OCT 2024)|2||| FIRST ARTICLE APPROVAL--CONTRACTOR TESTING (DEV 2026-O0042)(FEB 2026)|10||||||||||| FIRST ARTICLE APPROVAL--GOVERNMENT TESTING (DEV 2026-O0042)(FEB 2026)|7|||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| WARRANTY OF DATA-BASIC (DEVIATION 2026-O0035) (FEB 2026)|2||| LIMITATION OF LIABILITY--HIGH-VALUE ITEMS (FEB 1997)|1|| ESTIMATE OF PERCENTAGE OF RECOVERED MATERIAL CONTENT FOR EPA DESIGNATED PRODUCTS (MAY 2008))|1|| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| ROYALTY INFORMATION (APR 1984)|1|| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||X| ONLY ONE OFFER (DEVIATION 2026-O0048)(MAR 2026)|1|| EVALUATION OF FIRST ARTICLE TESTING|3|||| This solicitation is being issued under Emergency Acquisition Flexibilities (EAF) Authority formally known as Special Emergency Procurement Authority (SEPA). THIS IS A CRITICAL APPLICATION ITEM (CAI). Please email copy of quote/proposal to kenneth.lauber@dla.mil Drawings are not available. ALL PAR (POST AWARD REQUESTS) MUST BE SUBMITTED THROUGH THE NAVSUP WSS VENDOR PORTAL. PLEASE SEE CLAUSE WSSTERMHZ17 FOR DETAILED INSTRUCTIONS. PROCEDURES FOR CONTRACTORS TO REQUEST ACCESS TO WORKFLOW PRO (WFP) MOD ASSIST Please use the following address to open the NAVSUP WSS Workflow Pro (WFP) Mod Assist Vendor page: https://mynavsup.nag.navy.mil/apps/ops$workflow_pro.home To request an account, navigate to the bottom of the page and click Request Account. Fill in the information to create the user profile, you must select Robyn Grinarml as the POC from the drop-down menu. Select Privacy Act Agreement; after reading the statement, click Agree. When all data has been entered on the form, click the blue Submit button. Notification will be sent when the account is established. Should the Contractor experience concerns with the use of Mod Assist, the Contractor must contact Robyn Grinarml, robyn.grinarml@dla.mil \ 1. SCOPE 1.1 . Markings shall be in accordance with MIL-STD-130. 1.2 PRE-AWARD / POST AWARD REQUIREMENTS: Due to the critical use of this item and its quality history, a pre-award survey and post-award conference may be required for all new manufacturers. For all previous sources, a post-award conference may be recommended. 1.3 The components being acquired under this solicitation have been classified as Flight Critical requiring engineering source approval by the Naval Air Systems Command. Only those companies who have submitted requests for source approval and been approved will be eligible for award under this solicitation. Any company not previously approved may submit a Source Approval Request to the contracting officer, Naval Inventory Control Point, (See Block 10 of the SF33 for name and code). The Source Approval Request shall contain the following documentation and shall be submitted by the closing date of this solicitation: (A) Copy of complete configuration drawings for a similar item(s) which your company has produced within the past three years, including test procedures for which your company (1) has been qualified to manufacture and (2) which is similar, i.e., requires the same materials, manufacturing processes, inspections, tolerances and similar application as the item(s) for which you are seeking approval. (B) Copy of the complete process/operation sheets used to manufacuture the similar item, including but not limited to, detailed shop sketches. These plans must note those operations and processes performed by subcontractors/ vendors. (C) Complete copies of purchase orders, shipping documents, etc. that document delivery of production quantities of the part to the Original Equipment Manufacturer or Military service. Provide the most recent copies of the documents. (D) A detailed comparative analysis of the differences/similarities between the similar part and the part(s) for which you are seeking approval. This analysis should include materials, configuration, tolerances, process requirements, dimensions, castings, forgings, etc. (E) Copy of inspection method sheets used in the manufacturing and at final inspection. These sheets should include actual tolerance, print requirements, inspection devices, sources performing the operation and level of inspection. Critical characteristics should be discernible from all other characteristics. The above requirements are a subset of requirements specified in the ASO Source Approval Information Brochure dated January 1995. The submission of this data subset is contingent upon and in consideration of the submitting contractor meeting all other requirements specified in this solicitation to include a bilateral agreement with MDA which includes availability of complete data, MRB disposition, etc. Any company not having such agreement, but desiring to seek engineering source approval, will be required to submit data meeting all requirements of the ASO/NAVICP Source Approval Brochure. 1.4 Sampling rates (AQLs) indicated below shall be used in accordance with ANSI Z1.4 for Single Sampling and a General Inspection Level of II. 1.5 In addition to the 100% PCO Mandatory, critical and major characteristics, attributes for plating, hardness and non-destructive testing will be inspected one hundred percent. 1.6 Contractor shall develop a system for identification of individual piece parts for traceability purposes. Markings shall not be permanent. 1.7 An AQL of 1.5 will be used for Class 3 threads and dimensions, and geometric feature controls with a tolerance range of .010 or less. 1.8 For minor characteristics, a sampling rate determined by the contractor and subject to QAR approval will be used. 1.9 The material covered in this contract/purchase order will be used in a crucial shipboard system enabling the launch and/or recovery of aircraft. The use of incorrect or defective material would create a high probability of failure resulting in a serious personnel injury, loss of life, loss of vital shipboard systems or loss of aircraft. Therefore,the material has been designated as Critical material and special control procedures are invoked to ensure receipt of correct material. 1.10 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;3429AS6920; drawing number ( ;(30003); ) ;REVSION NONE; , Revision ;NAWC LAKEHURST; and all details and specifications referenced therein. 1.11 Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.12 If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C. 2. APPLICABLE DOCUMENTS DRAWING DATA=NAWCADLKE-MISC-482300-0480 |30003| D| |D| | | | DRAWING DATA=NAWCADLKE-MISC-482300-0546 |30003| -| |D| | | | DRAWING DATA=3429AS4108 |30003| C| |D| | | | DRAWING DATA=3429AS4900 |30003| D| |D| | | | DRAWING DATA=3429AS4914 |30003| C| |D| | | | DRAWING DATA=3429AS4918 |30003| C| |D| | | | DRAWING DATA=3429AS4960 |30003| A| |D| | | | DRAWING DATA=3429AS4961 |30003| B| |D| | | | DRAWING DATA=3429AS6920 |30003| -| |D| | | | DRAWING DATA=3429AS6924 |30003| -| |D| | | | DRAWING DATA=3429AS6926 |30003| -| |D| | | | DRAWING DATA=3429AS6927 |30003| -| |D| | | | DRAWING DATA=3429AS6928 |30003| -| |D| | | | 3. REQUIREMENTS - NOT APPLICABLE 4. QUALITY ASSURANCE QUALITY ASSURANCE REQUIREMENTS 1.The contractor shall perform Quality Conformance and Lot Sampling Inspection for all associated features that are present in the drawings and specifications: a. Features/attributes/requirements classified as Critical and Major on the drawing(s) or within the technical specification shall be inspected and shall have the actual dimensions documented 100%; b. Attributes for plating, hardness, and non-destructive testing shall be inspected 100%; c. Class 3 Threads, dimensions, and geometric feature controls with a tolerance range of .010 or less shall be inspected using an AQL of 1.5 and the General Inspection Level II as defined by ANSI Z1.4 d. Minor Characteristics: Sampling shall be inspected using an AQL of 4.0 and the General Inspection Level II as de-fined by ANSI Z1.4. 2. First Article Testing: The contractor shall conduct First Article testing on this item of ALRE/SE and must address all elements listed below and prepare a First Article Test Report documenting the outcome. Unless otherwise specified, the report and its acceptance shall be per the provisions of the applicable Contract Data Requirements List (CDRL). a. Requirements: i. First Article quantity is one (1); in uncoated condition. ii. The First Article shall be available for Government evaluation per the contract schedule. The Evaluation shall be conducted in the presence of the Government personnel. iii. The contractor shall provide facilities and personnel sufficient to conduct all necessary tests to establish conformance; iv. The contractor shall have available for review all certifications, test reports, in-process inspection documents needed to substantiate product quality; this same documentation shall also be included in the First Article test report; v. The contractor shall, at the time of First Article, have corrected any problem areas deemed significant and documented as deficient by the Government within his/her Quality Assurance system not previously identified during prior evaluations and/or surveys; any problems identified during the conduct of the test will also require correction. b. Testing and evaluation: i. The contractor shall accomplish 100% inspection and/or testing of all critical, major, and minor dimensions and/or requirements identified in the drawings, drawing notes, and process and fabrication specifications. Results shall consist of actual dimensions, measurements, and test outcomes and shall be recorded and included in the First Article test report. c. Acceptance/reject criteria: i. Satisfactorily meeting all requirements cited in the First Article Testing "Requirements" paragraph above and satisfactorily demonstrating100% conformance to the test and evaluation elements cited in the First Article Testing "Testing and evaluation" paragraph above shall constitute acceptance of the First Article: ii. Failure to meet any of the conditions in the First Article Testing "Requirements" paragraph above or the First Article Testing "Testing and evaluation" paragraph above shall be cause for rejection. d. Delivery: i. The accepted First Article exhibit may be delivered and counted along with the contract production quantities providing the item has not been damaged during testing, and has been found to be conforming; ii. The contractor is responsible for preparing the First Article Test Report in accordance with CDRL's. 3.Production Lot Special Tests: N/A 4.N/A 5.N/A 4.1 Review documentation as provided under DD 1423 requirements. 4.2 The test to be performed under the First Article approval clause (FAR 52.209-3) of the contract are listed below 4.2.1 Dimensional test (special) ;APPLIES; 4.2.2 Requirements of: ;NAWC LAKEHURST; 4.2.3 Form ;APPLIES; 4.2.4 Fit ;N/A; 4.2.5 Function ;N/A; 4.2.6 Compliance with drawing ( ;(30003); ) ;3429AS6920; , Revision ;REVISION NONE; and specifications referenced therein. 4.3 In addition to the above tests, the First Article(s) to be inspected hereunder shall also be subjected to those tests which will demonstrate that the article(s) comply with the contract requirements 4.4 The contractor shall be responsible for providing the necessary parts and repair of the First Article Sample(s) during inspection 4.5 The contractor shall notify the PCO, ACO, and QAR fourteen (14) days prior to conducting the First Article test so that the Government may witness such testing. 4.5.1 The QAR shall be present to witness all First Article Testing. 4.5.2 The following additional personnel shall witness the First Article Testing: ;DCMA QAR; 4.6 Disposition of FAT samples 4.6.1 ; ; Sample(s) may be destroyed during testing. 4.6.2 ;APPLIES; Unless otherwise provided for in the contract, sample(s) shall remain at the contractor and may be considered as production items under the contract provided the sample(s) can be refurbished to ready for issue condition and provided the sample(s) have inspection approval of the cognizant DCMC QAR. Sample(s) may be shipped as production items only after all other units required under the contract have been produced and are ready for shipment. 4.7 Test Sample Coating Instructions 4.7.1 Samples are to be unpainted. Corrosive areas are to be coated with a light preservative if required. 4.8 Notice to Government of Testing at the contractors facility. 4.8.1 FAR 52.209-3 applies (A) The contractor shall present ;ONE; ; unit(s) of the following CAGE( ;(30003); ; ), Part Number ;3429AS6920-1; ; , Revision ;REVISION NONE; ; as specified in this contract. At least fourteen (14) calendar days before the beginning of the First Article testing, the contractor shall notify the contracting officer, in writing, of the time and location of the testing so that the Government may witness the tests. (B) The contractor shall submit the First Article Test Report within 15 calendar days from the date of testing to: ;P.C.O; ; The contractor shall mark the report "First Article Test Report" and cite the contract number and lot/item number. Review documentation as provided under the DD1423 requirements. (C) Within 45 calendar days after the Government inspects the First Article, the contracting officer shall notify the contractor, in writing, of the approval, conditional approval, or disapproval of the First Article. The notice of approval, conditional approval, or disapproval shall not relieve the contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the contractor. A notice of disapproval shall cite reasons for disapproval. (D) If the First Article is disapproved, the contractor, upon Government request shall repeat any or all First Article Tests. After each request for additional tests, the contractor shall make any necessary changes, modifications, or repairs to the First Article or select another First Article for testing. All costs related to these tests are to be borne by the contractor, including any and all costs for additional tests following a disapproval. The contractor shall then conduct the tests and deliver another report to the Government under the terms and conditions and within the time specified in paragraph B above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule or for any additional costs to the Government related to these tests. (E) If the contractor fails to present any First Article on time, or the contracting officer disapproves any First Article, the contractor shall be deemed to have failed to make delivery within the meaning of the default clause of this contract. (F) Unless otherwise provided in the contract, and if the approved First Article is not consumed or destroyed in testing, the contractor may deliver the approved First Article as part of the contract quantity if it meets all contract requirements for acceptance. (G) If the Government does not act within the time specified in paragraph (C) above the contracting officer, shall, upon timely written request from the contractor, equitably adjust under the Changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay. (H) Before First Article Approval, the acquisition of materials or components for, or the commencement of production or, the balance of the contract quantity is at the sole risk of the contractor. Before First Article approval, the costs thereof shall not be allocated to this contract for 1) progress payments, or 2) termination settlements if the contract is terminated for the convenience of the Government. The contractor is responsible for providing operating and maintenance instructions, spare parts, and repair of the First Article during any First Article test. (I) The contractor shall produce both the First Article and the production quantity at the same facility and shall submit a certification to the effect with each First Article. (J) The test report (2 copies) shall be in accordance with MIL-STD-831, unless otherwise specified on the DD1423, and shall be submitted via the cognizant DCMC to NAVSUP, ATTN: (Cite name and code in Block 10.a of the SF33). The DCMC shall provide comments on Form DD1222 (2 copies) which shall be forwarded with the test report. Approval of the test report is the PCO's responsibility. Upon notification of approval, condition approval, the ACO shall execute the DD250 to indicate Government acceptance of the test report. 4.9 Alternate Offers - Waiver of First Article Approval Requirements. (The following provisions supersede any waiver of First Article Approval Requirements terms set forth in clause 52.209-3 or 52.209-4 as appropriate) (A) Unless otherwise specified in the solicitation, NAVSUP WSS reserves the right to waive the First Article Approval Requirements specified herein for offerors who have previously furnished identical production articles accepted by the Government or the Original Equipment Manufacturer/Prime Manufacturer. An offeror requesting waiver of First Article Requirements shall submit evidence with its offer establishing that: (I) the last production unit was delivered within three (3) years of the issue date of this solicitation, and (II) the production location to be used for this requirement is the same as used for the previous production run. Additionally, the offeror shall submit a certification, to be executed by the officer or employee for the offer, stating that: (I) the articles to be provided will be produced using the same facilities, processes, sequences of operations and approved subcontractors as those previously delivered and accepted by the Government or the Original Equipment Manufacturer/Prime Manufacturer, and (II) the previous production units were manufactured without Material Review Board disposition or waiver/deviation request or rejection of pre-production samples for cause. (NOTE: This certification concerns a matter within the jurisdiction of an agency of the United States and the making of a false, fictitious, or fraudulent certification may render the maker subject to prosecution under Title 18, United States Code, Section 1001.) (B) Offerors requesting waiver of First Article Approval Requirements under the provisions of this clause are cautioned to submit two prices for articles required herein - one that is based on compliance with the First Article Approval Requirements and one that is based on a waiver of such requirements. Where an offeror submits only one price and fails to clearly state that the price is based on waiver of the First Article Approval Requirements it will be deemed to be based on compliance with the First Article Approval Requirements (C) In the event of the First Article Approval Requirement is granted, the delivery schedule for the production items shall be reduced by the number of days designated for delivery of First Article Test unit plus the number of calendar days indicated for the government notification of conditional approval or approval. These requirements are specified in the quality assurance section of this solicitation. If the offeror is unable to meet the desired schedule, he shall insert below the alternate delivery schedule he offers to the government. Offeror's Proposed Alternate Delivery Schedule (Based on waiver of First Article Approval Requirements) Within Days: Item No. _____________ Quantity:_______ After Date of Contract:_________ 4.10 . Mandatory Inspection Requirements: 100% Procurement Contracting Officer (PCO) mandatory inspection is required and shall be accomplished at source under the surveillance and final approval of the cognizant DCMAO Quality Assurance Representative (QAR). During production, mandatory inspection is required to be accomplished by the contractor as follows: A. Level of Inspection (LOI). 1. Critical characteristics: 100% inspection shall apply. 2. Major and Minor characteristics: LOI shall be in accordance with a sampling plan acceptable to the QAR. B. Critical characteristics: ;DCMA QAR; C. Major and Minor characteristics 1. Shall be defined by the contractor subject to QAR concurrence, unless defined on applicable drawings and associated specifications. 4.11 FINAL INSPECTION REQUIREMENT:Due to the critical nature of this item, representatives of the buying office/and the cognizant field activity, NAWC Lakehurst, shall be notified by the successful contractor at least 14 days prior to presentation to the DCM QAR of the items for final inspection so that they may have the option of witnessing the final inspection. The contractor shall notify by email or TELEFAX PCO and NAWC Lakehurst QA ;DCMA QAR; to arrange for the final inspection.The authority of the QAR shall not be abrogated. If the notification is not given to both sites then the QAR shall not accept the units. 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE THIS IS AN ALRE CRITICAL APPLICATION ITEM. FOR DRAWING UPDATES, SEE ATTACHED NAWC LKE DRAWING UPDATE SHEET. NAVSUP REFERENCE ONLY: PROCUREMENT TDR (25-10143): THE COMPONENTS BEING ACQUIRED UNDER THIS SOLICITATION HAVE BEEN CLASSIFIED AS "CRITICAL" REQUIRING ENGINEERING SOURCE APPROVAL BY NAVAL AIR SYSTEMS COMMAND ONLY THOSE COMPANIES WHO HAVE SUBMITTED AND BEEN APPROVED WILL BE ELIGIBLE FORAWARD UNDER THIS SOLICITATION. ANY COMPANY MAY SUBMIT A SOURCE APPROVAL REQUEST AS OUTLINED IN THIS SOLICITATION. All records pertaining to ALRE CSI/CAI manufacture and inspection/test shall be provided to the ALRE Cognizant Technical Authority. All records shall be maintained by LKE QA and by the manufacturer for a period of seven years. DATE OF FIRST SUBMISSION=ASREQ 16. REMARKS: (Block 12) DATE OF FIRST SUBMISSION: Concurrently with delivery of FAT Items Inspection/Certification data needed to substantiate the Quality of the First Article Test unit shall be included in First Article unit packaging. The outside of the package that contains the data shall be clearly marked "INSPECTION/CERTIFICATION DATA INCLUDED". Data Requirements: a. Copies of all approved requests for variations. b. Material properties per Drawing 3429AS6920. c. Identification, including photos of all identifiers on the part, per Drawing 3429AS6920, 3429AS4108, 3429AS4900, 3429AS4918, 3429AS4960, 3429AS4961, 3429AS6924, 3429AS6926, 3429AS6927, 3429AS6928. d. Assembly/installation per Drawing 3429AS6920, 3429AS4900, 3429AS4914, 3429AS4960, 3429AS4961. e. Software installation per Drawing 3429AS6920. f. Testing per Drawing 3429AS6920. g. Dimensional inspection per Drawing 3429AS6920, 3429AS4961. h. Handling and storage per Drawing 3429AS4918. i. Environmental requirements per Drawing 3429AS4918. DATE OF FIRST SUBMISSION=ASREQ 16. REMARKS: (Block 12) DATE OF FIRST SUBMISSION: Concurrently with Final Inspection Data Requirements a. Copies of all approved requests for variations. b. Material properties per Drawing 3429AS6920. c. Identification, including photos of all identifiers on the part, per Drawing 3429AS6920, 3429AS4108, 3429AS4900, 3429AS4918, 3429AS4960, 3429AS4961, 3429AS6924, 3429AS6926, 3429AS6927, 3429AS6928. d. Assembly/installation per Drawing 3429AS6920, 3429AS4900, 3429AS4914, 3429AS4960, 3429AS4961. e. Software installation per Drawing 3429AS6920. f. Testing per Drawing 3429AS6920. g. Dimensional inspection per Drawing 3429AS6920, 3429AS4961. h. Handling and storage per Drawing 3429AS4918. i. Environmental requirements per Drawing 3429AS4918. j. Plating per Drawing 3429AS4918.
Solicitation334111No Set-Aside10/21/202610/19/2026-
ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION AND ACCEPTANCE - SHORT VERSION|8|X||X|||||| INSPECTION AND ACCEPTANCE OF SUPPLIES|26||||||||||||||||||||||||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT (COMBO)||TBD|SPRMM1|TBD|TBD|TBD|TBD|||TBD|||||TBD| NOTE FOR CONTRACTOR/ADMINISTRATIVE CONTRACTING OFFICER|3|||| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|| NOTICE OF CYBERSECURITY MATURITY MODEL CERTIFICATION LEVEL REQUIREMENTS (NOV 2025))|1|| FEDERAL ACQUISITION SUPPLY CHAIN SECURITY ACT ORDERS-PROHIBITION (DEC 2023)|12||||||||||||| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| This solicitation is being issued under SEPA-EAF Authority. 1. All contractual documents (i.e. contracts, purchase orders, task orders, Delivery orders, and modifications) related to the instant procurement are considered to be "issued" by the government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, such as email. The government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein. 2. Drawings or technical data are not available for this item. 3. Delivery days_________ARO. 4. Offer valid for _____ days. 5. When submitting quotes via Electronic Data Interchange (EDI), make sure you specify any exceptions (i.e. Mil specs/standards, packaging, Inspection & Acceptance (I&A), packaging houses etc) or follow up with a hardcopy of the exceptions. If nothing is indicated or received, award will be based upon solicitation requirements. Changes or requests for changes after award will have consideration costs deducted on modifications. 6. If you are not the manufacturer of the material you are offering, you MUST state who the Original Equipment Manufacturer (OEM) is �Commercial and Government Entity Code (CAGE) code� and the part number you are offering. 7. Please provide an email address for follow up communications. ____________________________________________________________ 8. It is recommended that vendors provide contact information to NAVSUP Weapon System Support (WSS) Mechanicsburg in order to receive automated notifications from Navy Electronic Commerce Online (NECO) when contracts/modifications are issued by Defense Logistics Agency (DLA) Weapons Support Mechanicsburg and posted on Procurement Integrated Enterprise Environment (PIEE) Electronic Data Access (EDA). To receive these notifications, contact: NAVSUPWSS code 025, procurement systems design and contract support division Via email at NAVSUPWSSITIMPHelpdesk@navy.mil. Please include the following information with your request: CAGE code, company name, address and Point-of-Contact (POC) with phone number and email address. 9. Contractors can view their orders, contracts and modifications at the EDA web tool. This web tool is located at the PIEE website. It is recommended that the contractor register for EDA at https://piee.eb.mil/. Click on new user and registration. Any order resulting from this Request for Quotation will require electronic submittal of Invoice and Receiving Report (COMBO) through PIEE-WAWF. 10. The following DLA Procurement Notes are applicable to this requirement: E06 Inspection and Acceptance at Source (JUN 2018) 11. INSPECTION OF MATERIAL WILL BE AT (CAGE & ADDRESS): ______________________________________________________________ INSPECTION OF PACKAGING AND FINAL ACCEPTANCE OF MATERIAL WILL BE AT (CAGE & ADDRESS): ______________________________________________________________ We are requesting that the quote's validity extend for 90 days from thesubmitted proposal quote date. 12. UCF SECTION F PRODUCTION FACILITY CHANGES (a) The performance of any of the work contracted for in any place other than that named in the contract is prohibited unless specifically approved by the Contracting Officer. Written requests for a change in production facilities must be submitted in writing to the Contracting Officer. Changes in Production facilities may be approved, provided: (1) Performance by small business or in labor surplus areas as required by the contract will not be changed; (2) The change will not cause a delay in delivery or necessitate a change in the purchase description; (3) The free on board (f.o.b.) point is not changed; and (4) Each request is supported by a price reduction of $250.00 to cover the Government's administrative costs to process the change. (b) The Government reserves the right to deny approval even if these four elements are met. \ 1. SCOPE 1.1 This contract/purchase order contains the requirements for manufacture and the contract quality requirements for the SNGL BOARD COMPUTER . 2. APPLICABLE DOCUMENTS 2.1 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.1.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. 3. REQUIREMENTS 3.1 Cage Code/Reference Number Items - The SNGL BOARD COMPUTER furnished under this contract/purchase order shall be the design represented by Cage Code(s) reference number(s). Cage _______ ref. no. ;82340 67207-03; 3.2 Marking - This item shall be physically identified in accordance with ;MIL-STD-130, REV N, 16 NOV 2012; . 3.3 Changes in Design, Material Servicing, or Part Number - Except for a Code 1 change, which shall be processed as provided in the code statement shown below, no substitution of items shall be made until the NAVICP-MECH Contracting Officer has notified and approval has been given by issuance of a written change order. When any change in design, material, servicing or part number is made to replace or substitute any item to be furnished on this contract/purchase order, the Contractor shall furnish, for the substituting/replacement item, a drawing and an explanation of the reason for the change, explaining the reason therefor. If finished detail drawings are not available, shop drawings in the form used by the manufacturer will be acceptable for Government evaluation. When notifying the Procurement Contracting Officer of the reasons for making substitutions, the type of change shall be indicated by code number in accordance with one of the following statements: Code 1: PART NUMBER CHANGE ONLY - If the Manufacturer's Part Number indicated thereon has changed, but the parts are identical in all respects, supply the item and advise NAVICP-MECH immediately of the new part number. Code 2: Assembly (or set or kit) not furnished - Used following detail parts. Code 3: Part not furnished separately - Use assembly. Code 4: Part redesigned - Old and new parts are completely interchangeable. Code 5: Part redesigned - New part replaces old. Old part cannot replace new. Code 6: Part redesigned - Parts not interchangeable. 4. QUALITY ASSURANCE 4.1 Responsibility for Inspection - Unless otherwise specified in the contract/purchase order, the Contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the contract/purchase order, the Contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements. 4.2 Responsibility for Compliance - All items must meet all requirements of this contract/purchase order. The inspection set forth in this specification shall become a part of the Contractor's overall inspection system or quality program. The absence of any inspection requirements shall not relieve the Contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract/purchase order. Sampling in quality conformance does not authorize submission of known defective material, either indicated or actual, not does it commit the Government to acceptance of defective material. 4.3 Records - Records of all inspection work by the Contractor shall be kept complete and available to the Government during the performance of contract/purchase order and for a period of 365 calendar days after final delivery of supplies. 5. PACKAGING 5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking shall be in accordance with the Contract/Purchase Order Schedule and as specified below. MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES 6.1 Ordering Information for Document References - The Department of Defense Single Stock Point (DODSSP), Website http://www.dsp.dla.mil/, provides product information for the Department Of Defense Index Of Specifications and Standards (DODISS) (i.e.Military/Federal Specifications and Standards), Data Item Descriptions (DIDs), and other DODSSP Products. Most Specifications can obtained directly from http://quicksearch.dla.mil/ A. Availability of Cancelled Documents - The DODSSP offers cancelled documentsthat are required by private industry in fulfillment of contractual obligationsin paper format. Documents can be requested by phoning the Subscription Services Desk. B. Commercial Specifications, Standards, and Descriptions - These specifications, standards and descriptions are not available from Government sources. Theymay be obtained from the publishers of the applicable societies. C. Ordnance Standards (OS), Weapons Specifications (WS), and NAVORD OSTD 600 Pages - These type publications may be obtained by submitting a request to: Commander, Indian Head Division, Naval Surface Warfare Center Code 8410P, 101 Strauss Avenue Indian Head, MD 20640-5035 D. On post-award actions, requests for "Official Use Only" and "NOFORN" (Not Releasable To Foreign Nationals) documents must identify the Government ContractNumber, and must be submitted via the cognizant Defense Contract Management Command (DCMC) for certification of need for the document. On pre-award actions such requests must be submitted to the PCO for certification of need for the document. E. NOFORN Military Specifications and Standards (including Amendments, Change Notices and Supplements, but NOT interim Changes) to be ordered from: Contracting Officer NAVSUP-WSS Code 87321 5450 Carlisle Pike P.O. Box 2020 Mechanicsburg, Pa. 17055-0788 F. Nuclear Reactor Publications Assigned NAVSEA Documents and Identification Numbers (i.e. NAVSEA Welding Standard, NAVSEA 250-1500-1) are to be ordered enue: Commanding Officer NAVSUP-WSS Code 009 5450 Carlisle Pike P.O. Box 2020 Mechanicsburg, Pa. 17055-0788 G. Technical Manuals Assigned NAVSEA Identification Numbers (i.e. NAVSEA Welding And Brazing Procedure, NAVSEA S9074-AQ-GIB-010/248) are to be ordered from: Commanding Officer NAVSUP-WSS Code 1 Support Branch 700 Robbins Avenue Philadelphia, Pa. 19111-5094 H. Interim Changes and Classified Specifications must be obtained by submitting a request on DD Form 1425 to NAVSUP-WSS. 6.2 In accordance with OPNAVINST 5510.1 all documents and drawings provided by the U.S. Navy to perspective Contractors must include a "Distribution Statement" to inform the contractor of the limits of distribution, and the safeguarding of the information contained on those documents and drawings. There are 7 (seven) seperate distribution statement codes used for non-classified documents and drawings. The definition for each is as follows: A... approved for public release; distribution is unlimited. B... distribution authorized to US Governments agencies only. C... distribution authorized to US Government agencies and their contractors. D... distribution authorized to DoD and DoD contractors only. E... distribution authorized to DoD Components only. F... further distribution only as directed by Commander, Naval Sea Systems Command, code 09T. X... distribution is authorized to US Government agencies and private individuals or enterprises eligible to obtain export controlled technical data in accordance with OPNAVINST 5510.161. 6.3 Notice To Distributors/Offerors - Consideration for award of contract shall be given only to authorized distributors of the original manufacturer's item represented in this solicitation. If you desire to be considered as a potential source for award of this contract, proof of being an authorized distributor shall be provided on company letterhead signed by a responsible company official and sent with your offer to the Procurement Contracting Officer.
Solicitation334111No Set-Aside10/20/202611/04/2026-
ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|||X|ISO 9001 OR HIGHER||||| STOP-WORK ORDER (AUG 1989)|1|| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|TBD||TBD|TBD|TBD|TBD|TBD|TBD||||||||| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|Robyn Grinarml| VALUE ENGINEERING (JUN 2020)|3|||| INTEGRITY OF UNIT PRICES (NOV 2021)|1|| EQUAL OPPORTUNITY FOR VETERANS (DEV 2026-O0040)(FEB 2026)|4||||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (DEV 2026-O0040)(FEB 2026)|4||||| TRANSPORTATION OF SUPPLIES BY SEA (OCT 2024)|2||| FIRST ARTICLE APPROVAL--CONTRACTOR TESTING (DEV 2026-O0042)(FEB 2026)|10||||||||||| FIRST ARTICLE APPROVAL--GOVERNMENT TESTING (DEV 2026-O0042)(FEB 2026)|7|||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| WARRANTY OF DATA-BASIC (DEVIATION 2026-O0035) (FEB 2026)|2||| LIMITATION OF LIABILITY--HIGH-VALUE ITEMS (FEB 1997)|1|| ESTIMATE OF PERCENTAGE OF RECOVERED MATERIAL CONTENT FOR EPA DESIGNATED PRODUCTS (MAY 2008))|1|| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| ROYALTY INFORMATION (APR 1984)|1|| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||X| ONLY ONE OFFER (DEVIATION 2026-O0048)(MAR 2026)|1|| EVALUATION OF FIRST ARTICLE TESTING|3|||| This solicitation is being issued under Emergency Acquisition Flexibilities (EAF) Authority formally known as Special Emergency Procurement Authority (SEPA). THIS IS A CRITICAL APPLICATION ITEM (CAI). Please email copy of quote/proposal to kenneth.lauber@dla.mil Drawings are not available. ALL PAR (POST AWARD REQUESTS) MUST BE SUBMITTED THROUGH THE NAVSUP WSS VENDOR PORTAL. PLEASE SEE CLAUSE WSSTERMHZ17 FOR DETAILED INSTRUCTIONS. PROCEDURES FOR CONTRACTORS TO REQUEST ACCESS TO WORKFLOW PRO (WFP) MOD ASSIST Please use the following address to open the NAVSUP WSS Workflow Pro (WFP) Mod Assist Vendor page: https://mynavsup.nag.navy.mil/apps/ops$workflow_pro.home To request an account, navigate to the bottom of the page and click Request Account. Fill in the information to create the user profile, you must select Robyn Grinarml as the POC from the drop-down menu. Select Privacy Act Agreement; after reading the statement, click Agree. When all data has been entered on the form, click the blue Submit button. Notification will be sent when the account is established. Should the Contractor experience concerns with the use of Mod Assist, the Contractor must contact Robyn Grinarml, robyn.grinarml@dla.mil \ 1. SCOPE 1.1 . Markings shall be in accordance with MIL-STD-130. 1.2 PRE-AWARD / POST AWARD REQUIREMENTS: Due to the critical use of this item and its quality history, a pre-award survey and post-award conference may be required for all new manufacturers. For all previous sources, a post-award conference may be recommended. 1.3 The components being acquired under this solicitation have been classified as Flight Critical requiring engineering source approval by the Naval Air Systems Command. Only those companies who have submitted requests for source approval and been approved will be eligible for award under this solicitation. Any company not previously approved may submit a Source Approval Request to the contracting officer, Naval Inventory Control Point, (See Block 10 of the SF33 for name and code). The Source Approval Request shall contain the following documentation and shall be submitted by the closing date of this solicitation: (A) Copy of complete configuration drawings for a similar item(s) which your company has produced within the past three years, including test procedures for which your company (1) has been qualified to manufacture and (2) which is similar, i.e., requires the same materials, manufacturing processes, inspections, tolerances and similar application as the item(s) for which you are seeking approval. (B) Copy of the complete process/operation sheets used to manufacuture the similar item, including but not limited to, detailed shop sketches. These plans must note those operations and processes performed by subcontractors/ vendors. (C) Complete copies of purchase orders, shipping documents, etc. that document delivery of production quantities of the part to the Original Equipment Manufacturer or Military service. Provide the most recent copies of the documents. (D) A detailed comparative analysis of the differences/similarities between the similar part and the part(s) for which you are seeking approval. This analysis should include materials, configuration, tolerances, process requirements, dimensions, castings, forgings, etc. (E) Copy of inspection method sheets used in the manufacturing and at final inspection. These sheets should include actual tolerance, print requirements, inspection devices, sources performing the operation and level of inspection. Critical characteristics should be discernible from all other characteristics. The above requirements are a subset of requirements specified in the ASO Source Approval Information Brochure dated January 1995. The submission of this data subset is contingent upon and in consideration of the submitting contractor meeting all other requirements specified in this solicitation to include a bilateral agreement with MDA which includes availability of complete data, MRB disposition, etc. Any company not having such agreement, but desiring to seek engineering source approval, will be required to submit data meeting all requirements of the ASO/NAVICP Source Approval Brochure. 1.4 Sampling rates (AQLs) indicated below shall be used in accordance with ANSI Z1.4 for Single Sampling and a General Inspection Level of II. 1.5 In addition to the 100% PCO Mandatory, critical and major characteristics, attributes for plating, hardness and non-destructive testing will be inspected one hundred percent. 1.6 Contractor shall develop a system for identification of individual piece parts for traceability purposes. Markings shall not be permanent. 1.7 An AQL of 1.5 will be used for Class 3 threads and dimensions, and geometric feature controls with a tolerance range of .010 or less. 1.8 For minor characteristics, a sampling rate determined by the contractor and subject to QAR approval will be used. 1.9 The material covered in this contract/purchase order will be used in a crucial shipboard system enabling the launch and/or recovery of aircraft. The use of incorrect or defective material would create a high probability of failure resulting in a serious personnel injury, loss of life, loss of vital shipboard systems or loss of aircraft. Therefore,the material has been designated as Critical material and special control procedures are invoked to ensure receipt of correct material. 1.10 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;3429AS6920; drawing number ( ;(30003); ) ;REVSION NONE; , Revision ;NAWC LAKEHURST; and all details and specifications referenced therein. 1.11 Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.12 If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C. 2. APPLICABLE DOCUMENTS DRAWING DATA=NAWCADLKE-MISC-482300-0480 |30003| D| |D| | | | DRAWING DATA=NAWCADLKE-MISC-482300-0546 |30003| -| |D| | | | DRAWING DATA=3429AS4108 |30003| C| |D| | | | DRAWING DATA=3429AS4900 |30003| D| |D| | | | DRAWING DATA=3429AS4914 |30003| C| |D| | | | DRAWING DATA=3429AS4918 |30003| C| |D| | | | DRAWING DATA=3429AS4960 |30003| A| |D| | | | DRAWING DATA=3429AS4961 |30003| B| |D| | | | DRAWING DATA=3429AS6920 |30003| -| |D| | | | DRAWING DATA=3429AS6924 |30003| -| |D| | | | DRAWING DATA=3429AS6926 |30003| -| |D| | | | DRAWING DATA=3429AS6927 |30003| -| |D| | | | DRAWING DATA=3429AS6928 |30003| -| |D| | | | 3. REQUIREMENTS - NOT APPLICABLE 4. QUALITY ASSURANCE QUALITY ASSURANCE REQUIREMENTS 1.The contractor shall perform Quality Conformance and Lot Sampling Inspection for all associated features that are present in the drawings and specifications: a. Features/attributes/requirements classified as Critical and Major on the drawing(s) or within the technical specification shall be inspected and shall have the actual dimensions documented 100%; b. Attributes for plating, hardness, and non-destructive testing shall be inspected 100%; c. Class 3 Threads, dimensions, and geometric feature controls with a tolerance range of .010 or less shall be inspected using an AQL of 1.5 and the General Inspection Level II as defined by ANSI Z1.4 d. Minor Characteristics: Sampling shall be inspected using an AQL of 4.0 and the General Inspection Level II as de-fined by ANSI Z1.4. 2. First Article Testing: The contractor shall conduct First Article testing on this item of ALRE/SE and must address all elements listed below and prepare a First Article Test Report documenting the outcome. Unless otherwise specified, the report and its acceptance shall be per the provisions of the applicable Contract Data Requirements List (CDRL). a. Requirements: i. First Article quantity is one (1); in uncoated condition. ii. The First Article shall be available for Government evaluation per the contract schedule. The Evaluation shall be conducted in the presence of the Government personnel. iii. The contractor shall provide facilities and personnel sufficient to conduct all necessary tests to establish conformance; iv. The contractor shall have available for review all certifications, test reports, in-process inspection documents needed to substantiate product quality; this same documentation shall also be included in the First Article test report; v. The contractor shall, at the time of First Article, have corrected any problem areas deemed significant and documented as deficient by the Government within his/her Quality Assurance system not previously identified during prior evaluations and/or surveys; any problems identified during the conduct of the test will also require correction. b. Testing and evaluation: i. The contractor shall accomplish 100% inspection and/or testing of all critical, major, and minor dimensions and/or requirements identified in the drawings, drawing notes, and process and fabrication specifications. Results shall consist of actual dimensions, measurements, and test outcomes and shall be recorded and included in the First Article test report. c. Acceptance/reject criteria: i. Satisfactorily meeting all requirements cited in the First Article Testing "Requirements" paragraph above and satisfactorily demonstrating100% conformance to the test and evaluation elements cited in the First Article Testing "Testing and evaluation" paragraph above shall constitute acceptance of the First Article: ii. Failure to meet any of the conditions in the First Article Testing "Requirements" paragraph above or the First Article Testing "Testing and evaluation" paragraph above shall be cause for rejection. d. Delivery: i. The accepted First Article exhibit may be delivered and counted along with the contract production quantities providing the item has not been damaged during testing, and has been found to be conforming; ii. The contractor is responsible for preparing the First Article Test Report in accordance with CDRL's. 3.Production Lot Special Tests: N/A 4.N/A 5.N/A 4.1 Review documentation as provided under DD 1423 requirements. 4.2 The test to be performed under the First Article approval clause (FAR 52.209-3) of the contract are listed below 4.2.1 Dimensional test (special) ;APPLIES; 4.2.2 Requirements of: ;NAWC LAKEHURST; 4.2.3 Form ;APPLIES; 4.2.4 Fit ;N/A; 4.2.5 Function ;N/A; 4.2.6 Compliance with drawing ( ;(30003); ) ;3429AS6920; , Revision ;REVISION NONE; and specifications referenced therein. 4.3 In addition to the above tests, the First Article(s) to be inspected hereunder shall also be subjected to those tests which will demonstrate that the article(s) comply with the contract requirements 4.4 The contractor shall be responsible for providing the necessary parts and repair of the First Article Sample(s) during inspection 4.5 The contractor shall notify the PCO, ACO, and QAR fourteen (14) days prior to conducting the First Article test so that the Government may witness such testing. 4.5.1 The QAR shall be present to witness all First Article Testing. 4.5.2 The following additional personnel shall witness the First Article Testing: ;DCMA QAR; 4.6 Disposition of FAT samples 4.6.1 ; ; Sample(s) may be destroyed during testing. 4.6.2 ;APPLIES; Unless otherwise provided for in the contract, sample(s) shall remain at the contractor and may be considered as production items under the contract provided the sample(s) can be refurbished to ready for issue condition and provided the sample(s) have inspection approval of the cognizant DCMC QAR. Sample(s) may be shipped as production items only after all other units required under the contract have been produced and are ready for shipment. 4.7 Test Sample Coating Instructions 4.7.1 Samples are to be unpainted. Corrosive areas are to be coated with a light preservative if required. 4.8 Notice to Government of Testing at the contractors facility. 4.8.1 FAR 52.209-3 applies (A) The contractor shall present ;ONE; ; unit(s) of the following CAGE( ;(30003); ; ), Part Number ;3429AS6920-1; ; , Revision ;REVISION NONE; ; as specified in this contract. At least fourteen (14) calendar days before the beginning of the First Article testing, the contractor shall notify the contracting officer, in writing, of the time and location of the testing so that the Government may witness the tests. (B) The contractor shall submit the First Article Test Report within 15 calendar days from the date of testing to: ;P.C.O; ; The contractor shall mark the report "First Article Test Report" and cite the contract number and lot/item number. Review documentation as provided under the DD1423 requirements. (C) Within 45 calendar days after the Government inspects the First Article, the contracting officer shall notify the contractor, in writing, of the approval, conditional approval, or disapproval of the First Article. The notice of approval, conditional approval, or disapproval shall not relieve the contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the contractor. A notice of disapproval shall cite reasons for disapproval. (D) If the First Article is disapproved, the contractor, upon Government request shall repeat any or all First Article Tests. After each request for additional tests, the contractor shall make any necessary changes, modifications, or repairs to the First Article or select another First Article for testing. All costs related to these tests are to be borne by the contractor, including any and all costs for additional tests following a disapproval. The contractor shall then conduct the tests and deliver another report to the Government under the terms and conditions and within the time specified in paragraph B above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule or for any additional costs to the Government related to these tests. (E) If the contractor fails to present any First Article on time, or the contracting officer disapproves any First Article, the contractor shall be deemed to have failed to make delivery within the meaning of the default clause of this contract. (F) Unless otherwise provided in the contract, and if the approved First Article is not consumed or destroyed in testing, the contractor may deliver the approved First Article as part of the contract quantity if it meets all contract requirements for acceptance. (G) If the Government does not act within the time specified in paragraph (C) above the contracting officer, shall, upon timely written request from the contractor, equitably adjust under the Changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay. (H) Before First Article Approval, the acquisition of materials or components for, or the commencement of production or, the balance of the contract quantity is at the sole risk of the contractor. Before First Article approval, the costs thereof shall not be allocated to this contract for 1) progress payments, or 2) termination settlements if the contract is terminated for the convenience of the Government. The contractor is responsible for providing operating and maintenance instructions, spare parts, and repair of the First Article during any First Article test. (I) The contractor shall produce both the First Article and the production quantity at the same facility and shall submit a certification to the effect with each First Article. (J) The test report (2 copies) shall be in accordance with MIL-STD-831, unless otherwise specified on the DD1423, and shall be submitted via the cognizant DCMC to NAVSUP, ATTN: (Cite name and code in Block 10.a of the SF33). The DCMC shall provide comments on Form DD1222 (2 copies) which shall be forwarded with the test report. Approval of the test report is the PCO's responsibility. Upon notification of approval, condition approval, the ACO shall execute the DD250 to indicate Government acceptance of the test report. 4.9 Alternate Offers - Waiver of First Article Approval Requirements. (The following provisions supersede any waiver of First Article Approval Requirements terms set forth in clause 52.209-3 or 52.209-4 as appropriate) (A) Unless otherwise specified in the solicitation, NAVSUP WSS reserves the right to waive the First Article Approval Requirements specified herein for offerors who have previously furnished identical production articles accepted by the Government or the Original Equipment Manufacturer/Prime Manufacturer. An offeror requesting waiver of First Article Requirements shall submit evidence with its offer establishing that: (I) the last production unit was delivered within three (3) years of the issue date of this solicitation, and (II) the production location to be used for this requirement is the same as used for the previous production run. Additionally, the offeror shall submit a certification, to be executed by the officer or employee for the offer, stating that: (I) the articles to be provided will be produced using the same facilities, processes, sequences of operations and approved subcontractors as those previously delivered and accepted by the Government or the Original Equipment Manufacturer/Prime Manufacturer, and (II) the previous production units were manufactured without Material Review Board disposition or waiver/deviation request or rejection of pre-production samples for cause. (NOTE: This certification concerns a matter within the jurisdiction of an agency of the United States and the making of a false, fictitious, or fraudulent certification may render the maker subject to prosecution under Title 18, United States Code, Section 1001.) (B) Offerors requesting waiver of First Article Approval Requirements under the provisions of this clause are cautioned to submit two prices for articles required herein - one that is based on compliance with the First Article Approval Requirements and one that is based on a waiver of such requirements. Where an offeror submits only one price and fails to clearly state that the price is based on waiver of the First Article Approval Requirements it will be deemed to be based on compliance with the First Article Approval Requirements (C) In the event of the First Article Approval Requirement is granted, the delivery schedule for the production items shall be reduced by the number of days designated for delivery of First Article Test unit plus the number of calendar days indicated for the government notification of conditional approval or approval. These requirements are specified in the quality assurance section of this solicitation. If the offeror is unable to meet the desired schedule, he shall insert below the alternate delivery schedule he offers to the government. Offeror's Proposed Alternate Delivery Schedule (Based on waiver of First Article Approval Requirements) Within Days: Item No. _____________ Quantity:_______ After Date of Contract:_________ 4.10 . Mandatory Inspection Requirements: 100% Procurement Contracting Officer (PCO) mandatory inspection is required and shall be accomplished at source under the surveillance and final approval of the cognizant DCMAO Quality Assurance Representative (QAR). During production, mandatory inspection is required to be accomplished by the contractor as follows: A. Level of Inspection (LOI). 1. Critical characteristics: 100% inspection shall apply. 2. Major and Minor characteristics: LOI shall be in accordance with a sampling plan acceptable to the QAR. B. Critical characteristics: ;DCMA QAR; C. Major and Minor characteristics 1. Shall be defined by the contractor subject to QAR concurrence, unless defined on applicable drawings and associated specifications. 4.11 FINAL INSPECTION REQUIREMENT:Due to the critical nature of this item, representatives of the buying office/and the cognizant field activity, NAWC Lakehurst, shall be notified by the successful contractor at least 14 days prior to presentation to the DCM QAR of the items for final inspection so that they may have the option of witnessing the final inspection. The contractor shall notify by email or TELEFAX PCO and NAWC Lakehurst QA ;DCMA QAR; to arrange for the final inspection.The authority of the QAR shall not be abrogated. If the notification is not given to both sites then the QAR shall not accept the units. 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE THIS IS AN ALRE CRITICAL APPLICATION ITEM. FOR DRAWING UPDATES, SEE ATTACHED NAWC LKE DRAWING UPDATE SHEET. NAVSUP REFERENCE ONLY: PROCUREMENT TDR (25-10143): THE COMPONENTS BEING ACQUIRED UNDER THIS SOLICITATION HAVE BEEN CLASSIFIED AS "CRITICAL" REQUIRING ENGINEERING SOURCE APPROVAL BY NAVAL AIR SYSTEMS COMMAND ONLY THOSE COMPANIES WHO HAVE SUBMITTED AND BEEN APPROVED WILL BE ELIGIBLE FORAWARD UNDER THIS SOLICITATION. ANY COMPANY MAY SUBMIT A SOURCE APPROVAL REQUEST AS OUTLINED IN THIS SOLICITATION. All records pertaining to ALRE CSI/CAI manufacture and inspection/test shall be provided to the ALRE Cognizant Technical Authority. All records shall be maintained by LKE QA and by the manufacturer for a period of seven years. DATE OF FIRST SUBMISSION=ASREQ 16. REMARKS: (Block 12) DATE OF FIRST SUBMISSION: Concurrently with delivery of FAT Items Inspection/Certification data needed to substantiate the Quality of the First Article Test unit shall be included in First Article unit packaging. The outside of the package that contains the data shall be clearly marked "INSPECTION/CERTIFICATION DATA INCLUDED". Data Requirements: a. Copies of all approved requests for variations. b. Material properties per Drawing 3429AS6920. c. Identification, including photos of all identifiers on the part, per Drawing 3429AS6920, 3429AS4108, 3429AS4900, 3429AS4918, 3429AS4960, 3429AS4961, 3429AS6924, 3429AS6926, 3429AS6927, 3429AS6928. d. Assembly/installation per Drawing 3429AS6920, 3429AS4900, 3429AS4914, 3429AS4960, 3429AS4961. e. Software installation per Drawing 3429AS6920. f. Testing per Drawing 3429AS6920. g. Dimensional inspection per Drawing 3429AS6920, 3429AS4961. h. Handling and storage per Drawing 3429AS4918. i. Environmental requirements per Drawing 3429AS4918. DATE OF FIRST SUBMISSION=ASREQ 16. REMARKS: (Block 12) DATE OF FIRST SUBMISSION: Concurrently with Final Inspection Data Requirements a. Copies of all approved requests for variations. b. Material properties per Drawing 3429AS6920. c. Identification, including photos of all identifiers on the part, per Drawing 3429AS6920, 3429AS4108, 3429AS4900, 3429AS4918, 3429AS4960, 3429AS4961, 3429AS6924, 3429AS6926, 3429AS6927, 3429AS6928. d. Assembly/installation per Drawing 3429AS6920, 3429AS4900, 3429AS4914, 3429AS4960, 3429AS4961. e. Software installation per Drawing 3429AS6920. f. Testing per Drawing 3429AS6920. g. Dimensional inspection per Drawing 3429AS6920, 3429AS4961. h. Handling and storage per Drawing 3429AS4918. i. Environmental requirements per Drawing 3429AS4918. j. Plating per Drawing 3429AS4918.
Solicitation334111No Set-Aside10/09/202610/19/2026-

Additional Details

Solicitation Number

SPRMM126RGE20

Archive Date

Aug 16, 2026

Office Address

MECHANICSBURG, PA, 17055-0788