GovChime
Notice ID: 2e7601a9bad7496aa8ad08d226235270Sources SoughtArchived

Acquisition of Water Management Plan (Storm Water Pollution Prevention)

Archived on November 27, 2025. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
4:00 PM EST
Posted
October 30, 2025
Notice type
Sources Sought
Set-aside
Local Area Set-Aside (FAR 26.2)
NAICS
924110: Administration of Air and Water Resource and Solid Waste Management Programs
Agency
Department of Energy

Notice details

Office
PRINCETON LAB - DOE CONTRACTOR
Place of performance
New Jersey, 08543
Last updated
Nov 6, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
SS-25-072R
Notice ID
2e7601a9bad7496aa8ad08d226235270

Description

The Princeton Plasma Physics Laboratory is seeking qualified sources to draft and certify a SPCC Plan with SWPP and Legionella water management program addendums and provide certification of a permitted LSI through a Subcontractor in full
compliance with US EPA regulations and all federal, state, local, and PPPL environmental rules IAW the attached Statement of Work

Sevices shall include the following tasks:

Task 1: Site Visits and Inspections
To satisfy the USEPA planning requirements, Subcontractor will
conduct one site visit at the facility. The site visit will be conducted to
kick off the project and accomplish the following tasks:
 Consult with PPPL personnel to make sure the information
contained within the current plans coincides with the actual
operations at the facility;
 Gather information on any changes or facility upgrades that have
occurred at the site since the last update of the plans;
 Discuss the existing plans and policies;
 Discuss the new format of the plan and focus on potential
additions and/or removal of information;
 Review and mark-up the existing facility drawings/diagrams; and
 Conduct a site walk.
b. Task 2: Plan Preparation
 Using the information gathered during the site visit, Subcontractor
will update the SPCC Plan with good engineering practices. The
plan will include information for SWPP and Legionella water
management program addendums.
 The cost of this scope assumes that one site visit will be required
and that information from PPPL is provided in a timely fashion.
Should additional technical changes occur at the site during the
preparation of the plan, Subcontractor may need to conduct
additional on-site visits for verification of the change(s) and would
prepare a separate cost estimate to incorporate the site visit(s).
 Subcontractor will professionally certify the combined plan that
satisfies requirements and guidelines per USEPA 40 CFR 112.
 After PPPL’s review and after Subcontractor incorporates
pertinent modifications or changes, Subcontractor will provide two
hard copies of the certified Plan. An electronic version of the final
document will also be provided in PDF format for PPPL’s records.
 Upon notification from PPPL of significant site changes affecting
the Plan, Subcontractor will review and revise the document(s), as
necessary. This may include portions of Tasks 1 and 2.
c. Task 3 Training
 Subcontractor will identify groups to be trained.
 Generate and tailor training materials for each group.
 After PPPL’s review and after Subcontractor incorporates
pertinent modifications or changes Subcontractor will deliver
finalized training materials.
 Subcontractor will review and revise the training materials upon
any changes to the Plan, as necessary.
d. Task 4 LSI Certification
Subcontractor will conduct an inspection, repair, integrity test, and PE
certification of PPPL’s LSI in conformance with the following
requirements:
 Inspection: Identify all rips, torn seams, and any punctures.
PPL-PD-SERV-SOW; REV 0 (3/2017) Page 5
 Repair: Any rips, tears, or punctures must be repaired using a
manufacturer-recommended method that is agreed upon between
the PE and repair technician or similar manufacturerrecommended
method with the same or similar material as the
existing liner.
 Liner integrity test: Subcontractor will need to complete a liner
integrity test upon completion of the repairs. The integrity test will
adhere to ASTM Standard Test Method D 6392 standard, or a
similar manufacturer-recommended method.
 Certification: Subcontractor’s PE will need to certify the patches
were applied correctly and the liner integrity test passed.

This is a local area set-aside for firms physically located within 60 miles of Princeton , NJ

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Documents

Files (1)

  • SOW Water Management_091125 (1) (4).pdf

    270 KBAdded in Sources Sought version 3Posted
    Download

Lifecycle

  1. 3
    Version 3Sources SoughtArchivedCurrent

    Acquisition of Water Management Plan (Storm Water Pollution Prevention)

    Notice 2e7601a9bad7496aa8ad08d226235270 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
IL-Crab Orchard CERCLA Program-Illinois EPA Response Support, Base Period with up to Two Option Years, Subject to the Availability of Funding (SAF)
49%
AwardedOpen

Additional Details

Solicitation Number

SS-25-072R

Archive Date

Nov 27, 2025

Office Address

Princeton, NJ, 08540