AF TENCAP RFI: PROCUREMENT OF C-130/L-382 NON-PERMANENT ROLL-ON/ROLL-OFF BEYOND LINE-OF-SIGHT (BLOS) DUAL-BAND SATCOM & GPS HATCH SYSTEMS
Archived on September 5, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 8:00 PM UTC+00:00
- Posted
- August 14, 2026
- Notice type
- Sources Sought
- NAICS
- 334511: Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing
- Agency
- Department of WarDepartment of the Air Force
Notice details
- Office
- AIR FORCE MATERIEL COMMAND.AIR FORCE LIFE CYCLE MANAGEMENT CENTER.INTELLIGENCE, SURVEILLANCE, RECONNAISSANCE.FA8691 AFLCMC WINK SENSORS
- Place of performance
- Colorado Springs, Colorado
- Last updated
- Oct 25, 2026
Identifiers
- Solicitation number
- TNCP_26_0001
- Notice ID
- c8bde1235a0e4920b325ad2a5cf1343b
Description
AF TENCAP, through the Air Force Lifecycle Management Center (AFLCMC) Sensors Division (AFLCMC/WIN), is conducting market research to identify vendors who have designed, developed, and delivered a high-bandwidth Beyond-Line-of-Sight (BLOS) 45cm Ku/Ka-Band Satellite Communication (SATCOM) system and associated GPS Hatch assemblies. These SATCOM systems and GPS hatches need to have pre-existing Department of War (DoW) certified airworthiness, or currently in the process of certification, and support operational missions across C-130 / L-382 aircraft variants. The systems must be installed via a Roll-on/Roll-off (Ro/Ro) hatch replacement capability to maintain fleet operational readiness and prevent aircraft down-time. The solution should be network agnostic, not to include any commercial SATCOM modems, and only be compatible with software defined radios for modem functions such as digitization. The system will provide network connectivity for a C-130 variant for future DAF Battle Network integration and communications with various mission partners. Air Force TENCAP is seeking vendors who have recently delivered existing TRL 9 prototypes, ready for small quantity production units to be delivered within the next year.
14 August 2026 Amended RFI Language:
This description supercedes the original description posted on 03 August 2026.
AF TENCAP, through the Air Force Lifecycle Management Center (AFLCMC) Sensors Division (AFLCMC/WIN), is conducting market research to identify vendors who have designed, developed, and delivered a high-bandwidth Beyond-Line-of-Sight (BLOS) 45cm Ku/Ka-Band Satellite Communication (SATCOM) system and associated GPS Hatch assemblies. These SATCOM systems and GPS hatches need to have pre-existing Department of War (DoW) certified airworthiness, or currently in the process of certification, and support operational missions across C-130 / L-382 aircraft variants. The systems must be installed via a Roll-on/Roll-off (Ro/Ro) hatch replacement capability to maintain fleet operational readiness and prevent aircraft down-time. The solution should be network agnostic, not to include any commercial SATCOM modems, and only be compatible with software defined radios for modem functions such as digitization. Specifically, the system will need to be compatible with the x410 modem. The system will provide network connectivity for a C-130 variant for future DAF Battle Network integration and communications with various mission partners. Air Force TENCAP is seeking vendors who have recently delivered existing TRL 9 prototypes, ready for small quantity production units to be delivered within the next year.
Award Overview
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Showing 2 of 2 items
Document | Source | Agency | Posted Date | File Size | Actions | |
|---|---|---|---|---|---|---|
| Sources Sought | DEPT OF THE AIR FORCE | Aug 14, 2026 | 122.57 KB | |||
| Sources Sought | DEPT OF THE AIR FORCE | Aug 14, 2026 | 121.71 KB |
Lifecycle
TNCP_26_0001- Market Research
Pre-solicitation or formal solicitation typically follows within 30–180 days. (estimate)
- Market ResearchCurrentAug 14, 2026
AF TENCAP RFI: PROCUREMENT OF C-130/L-382 NON-PERMANENT ROLL-ON/ROLL-OFF BEYOND LINE-OF-SIGHT (BLOS) DUAL-BAND SATCOM & GPS HATCH SYSTEMS
Similar Opportunities
Additional Details
Solicitation Number
TNCP_26_0001
Archive Date
Sep 5, 2026
Office Address
WPAFB, OH, 45433-7101