Notice ID: 2c2446fec43e36136ae0a162ff8a0c2cAward NoticeAwarded
Y--Psych & Polytrauma Project 405-305
Awarded on April 15, 2009. Full description on SAM.gov.
Awarded tounder VA241-P-1169 (source: SAM.gov award notice)• $655.6K
Overview
- Posted
- May 14, 2009
- Notice type
- Award Notice
- NAICS
- 541310: Architectural Services
Notice details
- PSC
- Y: CONSTRUCT OF STRUCTURES/FACILITIES
- Last updated
- Sep 25, 2026
- Award date
- Apr 15, 2009
- Award amount (SAM.gov award notice)
- $655.6K
Identifiers
- Solicitation number
- VA-241-09-RP-0060
- Notice ID
- 2c2446fec43e36136ae0a162ff8a0c2c
- Award number (PIID)
- VA241-P-1169
Description
THIS IS A SOURCES SOUGHT NOTICE FOR THE FOLLOWING A/E SERVICES RELATED TO THE PROJECT# 405-305, PSYCH AND POLYTRAUMA RURAL RESIDENTIAL CARE CENTER, AT THE VAMC, WHITE RIVER JUNCTION, VT.Provide professional A/E design services, technical specifications, working drawings, cost estimates, as-built drawings, construction period services, and site visits for NRM Project # 405-305, " Psych. & Poly trauma Rural Residential Care Center", at the VA Medical Center in White River Junction, VT. The A/E shall provide a design for a construction contract of a 10,500 GSF addition onto the north side of B-8 at this medical center. Construction cost estimated to be in the range of 5.0 to 10.0 million dollars. The new addition will allow for expansion of services that include new residential based care options. This expansion would include the addition of 14 extended-stay residential care beds and facilities to support patients with Traumatic Brain Injury and Polytrauma, 10 lodger beds, associated support spaces with appropriate adjacencies and offices for 20 mental health care providers outside the bed areas. The new addition will require the full range of new/upgraded building service equipment and services due to the lack of additional capacity for expansion of the current equipment/services in B-8. The new addition shall be designed in form and function consistent with those set forth in VA design guides and VA Space Planning Criteria. The A/E offices must be within a 200 mile radius of the VA Medical Center in White River Junction, VT. All work must be designed within a construction price limit. The following factors will be considered: reputation and standing of the firm and its principal officials with respect to professional performance, general management and cooperativeness/record of significant claims against the firm because of improper or incomplete architectural and engineering services, specific experience and qualifications of personnel proposed for assignment to the project and their record of working together as a team. The A/E will provide a cost estimate at each review and a final cost estimate to perform the above work and will design only those items that can be provided within the cost limitation. Submission requirements are the schematic design submission (25%), a design development submission (50%), two construction document submissions (75% and 95%), and a bid document submission, each with refined cost estimates as required. This requirement is to provide all labor, transportation and supervision necessary to conduct any required field investigations and complete working design drawings. The Medical Center must be able to remain operational throughout the construction period and a detailed sequence of work will be provided by the A/E to minimize impact of the construction. The A/E will provide four sets of documents at each submission including a cost estimate and all information on CD, and will provide a set of AutoCAD drawing files on CD, 2 CD's of final drawings and specs in Microsoft Word at the final submission to enable procurement actions. Estimated duration of design is to be 5 months, with construction period services expected to be 1 year. The time between completed design and construction start is expected to be between 6 months and 13 months. Submissions of SF 330s are due NLT December 5, 2008. All respondents must be registered at www.ccr.gov for bids to be accepted. This notice is subject to availability of funds. Please note that this is not a Request for Proposal and the Government is seeking information for planning purposes only and does not constitute a solicitation or a commitment by the Government to later publish a solicitation. This announcement is not a request for competitive quotations. No solicitation document is available and telephone inquires will not be honored; however interested parties may submit literature detailing how their services meet the VA requirements to the Contracting Officer.
Award Overview
Award Number
VA241-P-1169
Award Amount (SAM.gov award notice)
$655.6K
Award Date
Apr 15, 2009
Awardee
Original Solicitation
Notice ID: 2c2446fec43e36136ae0a162ff8a0c2c
Posted Date: May 14, 2009
Original Response Deadline: Not specified
Contract Details
No FPDS record matches this award number at the same department yet
Contract details typically appear within 2-4 weeks after award; DoD awards are published about 90 days after signature.
Contacts
Contracting Officer
Primary Contact
Michael E OuelletteContract Specialist 802-296-6315 Contract Specialist
Documents
No documents available.
Lifecycle
Solicitation:
VA-241-09-RP-0060- Market Research
- Awarded
This opportunity has been awarded.
- Market ResearchNov 14, 2008
C--Psych & Polytrauma Project 405-305
- AwardedCurrentMay 14, 2009
Y--Psych & Polytrauma Project 405-305
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Please be advised that the submission deadline for SF 330 has been extended from November 20, 2026, to November 25, 2026, at 2:00 PM EST. See responses to RFI s below. VA responses to RFI s are bold below. Could you please clarify which disciplines are anticipated to be required? For example, regarding surveying, would the scope include a building measured survey, utility survey, site topographic survey, or a combination of these? Disciplines expected to be required: Architecture; Structural; Civil; Mechanical (HVAC); Plumbing; Electrical; Fire Protection; Industrial Hygiene; Interior Design; Surveying; Cost Estimating; Certified Physical Security Specialist; and other A/E services as defined by FAR 36.6 as necessary. Must a licensed surveyor be included as a named member of the SF330 team, or may surveying services be provided by a consultant on an as-needed basis? Identify the proposed discipline leads and specialty consultants required by the scope, including architecture, interior design, mechanical, electrical, plumbing/fire protection, and other disciplines as applicable. Describe the firm s and proposed team s experience with project specific technical features (e.g., MEP renovation, electrical distribution, emergency power, HVAC modifications, clinical space systems, fire protection/life safety systems, low voltage/IT coordination, medical gas systems, infection control/occupied facility coordination). Relevant VA experience and comparable non VA healthcare experience will be considered. Given that the primary scope involves renovating the existing second-floor clinic area, is new field surveying anticipated for this project? Building measurement and verification of existing utilities are expressly supported by the SOW. It requires a thorough as-built investigation and independent field verification of dimensions, wall layouts, utilities, material types, and other design conditions. The notice does not expressly require a boundary survey, campus-wide utility survey, or site topographic survey. It also does not define survey limits, accuracy, deliverables, or whether licensed land-surveying services are intended. Therefore: Existing-building measured documentation: required. Verification of utilities affecting the design: required. Please confirm if there is a page limit in addition to the 10MB PDF file size for the SF330 submission. 10MB PDF file size no page limit. For Factor II Specialized Experience and Technical Competence, the solicitation states that "recent experience means projects completed, substantially completed, or actively performed within five years before the response due date." Can the VA clarify whether this requirement is based on completion of the A/E design services? For this factor, recent experience means projects completed, substantially completed, or actively performed within five years before the response due date. Do the requirements outlined under Factor 3 Past Performance pertain to our Section F project examples? Section F project description will not necessarily satisfy Factor III by itself. Add the required performance information and cross-reference the project numbers rather than merely repeating scope descriptions. Are CPARS / PPQs required to be included with our submission? The supplied notice does not require CPARS attachments, completed PPQs nor does it exclude submission. As the Solicitation expects the A/E to collaborate with other A/E firms involved in other projects throughout the facility, can the VA provide the names of the actual other A/E firms and the other projects? No. Is a space program or a list of the specific specialty clinics to be consolidated on the 2nd Floor available and can it be provided at this time? No, not at this time. The anticipated disciplines include Surveying. Given that the project is primarily an interior renovation within Building 1, can the VA clarify the anticipated scope of surveying services required for this project? Building measurement and verification of existing utilities are expressly supported by the SOW. It requires a thorough as-built investigation and independent field verification of dimensions, wall layouts, utilities, material types, and other design conditions. The notice does not expressly require a boundary survey, campus-wide utility survey, or site topographic survey. It also does not define survey limits, accuracy, deliverables, or whether licensed land-surveying services are intended. Therefore: Existing-building measured documentation: required. Verification of utilities affecting the design: required. Can the VA clarify whether replacement of the air handling unit(s) serving the renovated 2nd Floor area is anticipated as part of this project, or whether the design should evaluate and determine HVAC system modifications necessary to support the renovated space? The SOW anticipates significant system upgrades, utility verification, and HVAC design, but it does not identify units to replace or establish replacement as a mandatory solution. The supported interpretation is that the A/E must evaluate existing systems and develop modifications or replacement recommendations needed for the approved renovation. VA architectural guidance likewise calls for investigating whether existing systems have sufficient capacity for renovations. That guidance does not establish that these particular AHUs require replacement Will the 2nd Floor space be vacated during construction or will phased construction be required? Full vacancy is not promised. The SOW expressly requires construction phasing, infection-control planning, outage and temporary-access planning, and a temporary relocation plan if needed. Firms should demonstrate occupied-facility and phasing capability; the actual decanting and construction sequence remain to be determined with VA. The SOW states that "an all-inclusive concept will need to be created" for the approximately 16,530 SF renovation area. Can the VA clarify whether the interior design concept is intended to encompass only the renovated specialty clinic space or also adjacent public and circulation areas on the 2nd Floor? The all-inclusive interior design concept applies to the approximately 16,530-square-foot specialty clinic renovation area identified in the SOW. The A/E shall coordinate the renovated area with directly adjacent public and circulation areas as necessary to provide appropriate transitions and maintain operational continuity. Design of other portions of the second floor is not included unless specifically identified or authorized by the VA. Deadline time zone: Please confirm that 2:00 p.m. Eastern Standard Time for the October 14, 2026 question deadline and October 26, 2026 submission deadline means 2:00 p.m. prevailing Eastern Time on those dates. 2:00 pm EASTERN TIME, NEW YORK, USA Page and formatting limits: Please confirm that there is no page limit, minimum font size, or separate length limit for supplemental qualification statements, provided the complete submission is a single PDF no larger than 10 MB. Submit SF 330 Parts I and II by email to millard.adkins@va.gov as a single Adobe PDF file (no larger than 10 MB). No ZIP files. Receipt must be confirmed. No page limit or minimum font size. Past-performance documentation: Should firms attach Contractor Performance Assessment Reporting System (CPARS) reports or Past Performance Questionnaires (PPQs), or should Factor III be addressed through narrative only unless supporting records are requested? The supplied notice does not require CPARS attachments, completed PPQs nor does it exclude submission. Project examples: May the up to five projects discussed under Factor III be the same projects presented in SF330 Section F? May Section F include more than five projects if the Factor III discussion is limited to five? Yes. The projects discussed under Factor III may be the same projects presented in SF330 Section F. However, the Factor III response must provide the specific past-performance information requested by that factor, including the firm s performance regarding quality, cost control, schedule compliance, coordination, project outcome, and the roles of proposed key personnel, as applicable. Firms may cross-reference the corresponding Section F project number rather than repeat the full project description. The Factor III discussion is limited to no more than five projects. Additional projects may be included in Section F to the extent permitted by the SF330 requirements and the submission size limitation, but only the five projects identified for Factor III will be evaluated under the specific Factor III project-example requirements. Section E resumes: Which disciplines does the Government expect firms to treat as key discipline leads requiring Section E resumes? Please clarify whether resumes are required for every discipline listed under A/E Eligibility and Disciplines, or only the proposed key leads applicable to this project. The notice expressly asks for the PM and proposed key discipline leads, with architecture, interior design, mechanical, electrical, and plumbing/fire protection identified in Factor II. It does not expressly demand a separate resume for every discipline on the broad eligibility list. Include the PM and each proposed key lead, including specialty consultants who meet that definition including but not limited to cost estimator an Quality Manager. Receipt confirmation: The solicitation states that receipt must be confirmed. What form of confirmation is acceptable? If acknowledgment is not received before the submission deadline, whom should the firm contact, and through what method? Receipt will be confirmed by the contracting officer by email once received. The POC is Millard Adkins and can be contacted by email to Millard.Adkins@va.gov Project completion status: For projects presented in Section F and discussed under Factor III, must design be complete, construction be complete, or both? Factor II allows projects completed, substantially completed, or actively performed within the preceding five years; please clarify whether that same eligibility standard applies to Section F and Factor III. For Factor II, a project may be completed, substantially completed, or actively being performed, provided the qualifying work occurred within five years before the response due date. Neither design nor construction must necessarily be fully complete for a project to qualify under Factor II. For Factor III, firms should submit up to five recent and relevant projects that provide sufficient performance information for the Government to evaluate quality, cost control, schedule compliance, coordination, and project outcome. If a project is ongoing, the firm should clearly identify the work completed to date and the performance information available for evaluation. Regarding the subject solicitation, can you please confirm if this effort will require commissioning and life safety and if those roles are required to be third-party? Life safety is expressly required. The SOW requires final drawings addressing life safety and infection control, includes fire-protection drawings, and calls for relevant life-safety expertise in evaluation. It does not establish a separate third-party life-safety consultant requirement. Commissioning is not expressly assigned as a distinct service in the supplied SOW. Nevertheless, the cited requirement to comply with VA design criteria is significant: VA HVAC guidance requires commissioning practices tailored to project size and complexity and compliance with VA s commissioning manual. Civil Engineering and Surveying disciplines: The solicitation's required disciplines list includes Civil Engineering and Surveying, but neither discipline is addressed anywhere in the body of the SOW. Disciplines expected to be required: Architecture; Structural; Civil; Mechanical (HVAC); Plumbing; Electrical; Fire Protection; Industrial Hygiene; Interior Design; Surveying; Cost Estimating; Certified Physical Security Specialist; and other A/E services as defined by FAR 36.6 as necessary. Can you confirm whether Civil Engineering and Surveying services are in fact required for this project? They remain listed as anticipated disciplines Can you provide the anticipated scope of responsibilities for these two disciplines, since the current SOW does not describe any site, civil, or survey work for this second story interior renovation? No significant civil engineering or land surveying effort is currently anticipated for the second-floor renovation itself. However, firms should include civil engineering and surveying capabilities sufficient to support any site-related work that may become necessary as a result of construction phasing, utility modifications, temporary facilities, or continuity-of-operations requirements identified during design development. The VA has not predetermined the temporary relocation strategy. We wanted to clarify, for our SF330 submission if we needed to utilize the GSA SF330 form? Can we utilize a modified form to showcase photographs to reinforce our narrative about project examples provided in Part F. Preserve the SF330 sections, information, project identifiers, and signature certifications. GSA also provides a separate reproducible Section F. use only concise project-relevant images if space permits. | 55% | Market Research | 11/25/2026 |
Request For Information for Request for Qualifications for Title II Architect Engineering Services for Design Build Construction of Aircraft Operations Facility at Grand Forks AFB, ND. Technical Questions DEADLINE 30 November 2026. RESPONSE DUE DATE 03 December 2026. All packages must be submitted electronically via Procurement Integrated Enterprise Environment under Notice ID FA890327R0025. | 55% | Special Notice | 12/03/2026 |
The Contractor shall provide all professional architectural, fire protection engineering, life safety, and code consulting services required to update the facility’s existing life safety drawings, otherwise known as “Statement of Conditions Drawings” (SOC Drawings) for the Carl Vinson VA Medical Center located at 1826 Veterans Blvd. Dublin, GA 31021. | 55% | Pre-Solicitation | 11/24/2026 |
This notice does not constitute a Request for Quote (RFQ), Invitation for Bid (IFB), or Request for Proposal (RFP), nor does it promise to issue any such solicitations in the future. This notice does not commit the U.S. Government to contract for any supply or service. Further, the U.S. Government is not seeking quotes, bids, or proposals at this time and will not accept unsolicited proposals in response to this sources sought notice. This announcement and the related draft Statement of Work (SOW) are published solely to identify interested firms and to solicit industry comments, suggestions, recommendations, and feedback aimed at supporting and improving the Simplified Acquisition of Base Engineering Requirements (SABER) Indefinite Delivery/Indefinite Quantity (IDIQ) contract. The intent of the 374th Contracting Squadron (374 CONS) is to subsequently solicit and award an Indefinite Delivery/Indefinite Quantity (IDIQ) Simplified Acquisition of Base Engineering Requirements (SABER) construction contract. SABER is a single-award, design-build indefinite delivery/indefinite quantity (IDIQ) construction acquisition based on a general statement of work (SOW) further defined with each individual task order. The scope of this contract generally includes non-complex, minor design efforts and multiple construction trades. This includes, but is not limited to, interior renovations and alterations—such as office and restroom renovation and repairs—demolition works, asbestos and hazardous materials (HAZMAT) abatement, as well as general building construction, civil engineering, mechanical, electrical, and telecommunications works. This contract utilizes a Government-furnished Unit Price Guide (UPG) provided in advance. The UPG will be shared with the contractor, who shall prepare all subsequent task order proposals and price quotes based on the established unit prices. The contract maximum amount is $49M. The total Period of Performance of contractual coverage shall not exceed five (5) years and plus optional three (3) years. The anticipated period of performance is 1 June 2027 – 30 May 2034. All companies must be registered within the System for Award Management (SAM) (https://www.sam.gov). DFARS clause 252.225-7042 applies to this procurement. Under this clause, the offeror represents that it is properly authorized to conduct business and commerce in the country or countries where this contract is to be performed, which is a mandatory prerequisite for bidding. This requirement presupposes that the offeror possesses all necessary authority and licenses, including a Construction Business License in Japan, as applicable. In response to this Sources Sought Notice, the Government requests that interested businesses capable of fully supporting this requirement furnish the following information: Name of the firm, Point of Contact (POC), phone number, email address, and CAGE code. Additionally, please indicate whether your company intends to participate in the bidding process for this contract. The U.S. Government will not pay for any information or administrative costs incurred in response to this notice. Submittals will not be returned to the responder. A determination not to compete this requirement, based upon responses to this notice, is solely within the discretion of the Government. However, if a competitive solicitation is released, it will be synopsized on SAM.gov. It is the responsibility of potential offerors to monitor SAM.gov for additional information pertaining to this requirement. Interested parties should provide their written responses via email to Ms. Yuki Kobayashi at yuki.kobayashi.jp@us.af.mil and Ms. Namiko Kaneko at namiko.kaneko.1.jp@us.af.mil. All submissions must be received no later than 20 Nov 2026, 1600 hours, Japan Standard Time (JST). | 55% | Market Research | 11/20/2026 |
JEFF Cooling Tower Replacement Title III | 55% | Awarded | Open |
Additional Details
Solicitation Number
VA-241-09-RP-0060
Archive Date
Jun 14, 2009