Notice ID: 359cb3dc9cd92b196f1ccc610b208988Solicitation
RECOVERY Z--Recovery Act - Replace Boiler #3 Project No: 557-09-107
Archived on June 7, 2010. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 7:00 AM UTC+02:00
- Posted
- April 6, 2010
- Notice type
- Solicitation
- Set-aside
- Service-Disabled Veteran-Owned Small Business Set Aside
Notice details
- Office
- 247-NETWORK CONTRACT OFFICE 7 (36C247)
- Place of performance
- Carl Vinson VA Medical Center;1826 Veterans Blvd.;Dublin, GA 31021 us
- PSC
- Z: MAINT, REPAIR, ALTER REAL PROPERTY
- Last updated
- Dec 5, 2025
Identifiers
- Solicitation number
- VA-247-10-RA-0066
- Notice ID
- 359cb3dc9cd92b196f1ccc610b208988
Description
Provide all labor, materials, tools, equipment and supervision to Replace Boiler #3, Project 557-09-107, at the Carl Vinson VA Medical Center, Dublin, GA, in accordance with drawings and specifications. Work includes general construction, alterations, mechanical and electrical work as described per drawings and specifications to replace Boiler Number 3 with new dual fuel fire tube boiler complete with controls, exhaust-gas economizer, stack, and all required safety and operating controls and accessories at the medical center. Cost range is between $1,000,000 and $2,000,000. NAICS Code 238220 Plumbing Heating and Air Conditioning Contractors and size standard $14 million applies. The solicitation package and drawings should be available for download on or about March 9, 2010. No hard copies of the solicitation or drawings will be provided. All responsible sources may submit a bid which shall be considered by DVA. This is a Service-Disabled Veteran-Owned Small Business Set-Aside.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Angie WhiteContract Specialist 478-277-2710 angie.white1@va.gov
Documents
No documents available.
Lifecycle
Solicitation:
VA-247-10-RA-0066- Pre-Solicitation
- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- 5×Pre-SolicitationFeb 22, 2010
RECOVERY Z--Recovery Act - Replace Boiler #3 Project No: 557-09-107
- SolicitationCurrentApr 6, 2010
RECOVERY Z--Recovery Act - Replace Boiler #3 Project No: 557-09-107
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
VA-247-10-RA-0066
Archive Date
Jun 7, 2010