Notice ID: ea53cfcd6fc2f38818933b340913b7b2Presolicitation
Y--Install Dry Pipe Fire Sprinkler Systemfor Bldg 53 Back Dock
Archived on August 10, 2008. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 12:00 AM UTC−05:00
- Posted
- June 12, 2008
- Notice type
- Presolicitation
- Set-aside
- Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
- NAICS
- 236220: Commercial and Institutional Building Construction
Notice details
- Place of performance
- Department of Veterans Affairs;Jack C. Montgomery VA Medical Center 90C;Muskogee, OK 74401 USA
- PSC
- Y: CONSTRUCT OF STRUCTURES/FACILITIES
- Last updated
- Sep 25, 2026
Identifiers
- Solicitation number
- VA-256-08-RP-0275
- Notice ID
- ea53cfcd6fc2f38818933b340913b7b2
Description
This notice is for Project No. 623-08-055, Install Dry Pipe Fire Sprinkler System Bldg 53 Back Dock, Jack C. Montgomery VA Medical Center, Muskogee, OK. This is a 100% Service Disabled Veteran Owned Small Business Set-Aside (SDVOSB). All SDVOSB's may submit a bid, which will be considered by the agency. If your firm is not legally designated as a Service Disabled Veteran Owned Small Business, you are not eligible to bid on this project. This procurement is classified under NAICS Code 236220 and has a size standard of $31.0 Million. The cost estimate range for this project is between $25,000 and $100,000. The work for this requirement consists of, but is not limited to: Contract construction services for station level project 623-08-055, Install Dry Pipe Fire Sprinkler System B53 Back Dock. Project consists of minor demolition, general construction, & electrical construction. Contractor shall furnish and install air compressor, dry system sprinkler heads, flow switch tied into Bldg #53 Fire Alarm Panel, low point drain, and back flow preventer for approximately 1600 sq ft. Contractor shall provide all labor, material and equipment necessary to perform the required demolition and construction in areas indicated on the contract drawings and specifications in buildings #53 back dock and bldg #52. Contractors shall comply with NFPA 101, VA Standards and all fire and safety criteria. Contractor is responsible for keeping the work area safe and clean daily. All work shall comply with local and state codes. Construction duration is 45 days. Specifications and drawings will be uploaded on or about May 28, 2008. Specs and plans will be available for download from the fedbizopps site http://fbo.gov. Amendments to this solicitation will be posted at the fedbizopps website. In order to receive e-mail notification of amendments, you must register in fedbizopps to Receive Notification of amendments. Bidders are responsible for obtaining and acknowledging all amendments to this solicitation prior to the closing of the response time. Questions concerning drawing or specification should be sent to Jared Cariker at jared.cariker@va.gov.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Jared CarikerContract Specialist 918-577-3616 Contract Specialist
Documents
No documents available.
Lifecycle
Solicitation:
VA-256-08-RP-0275- Pre-Solicitation
Formal solicitation typically follows within 30–60 days. (estimate)
- 4×Pre-SolicitationCurrentMay 27, 2008
Y--Install Dry Pipe Fire Sprinkler Systemfor Bldg 53 Back Dock
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
VA-256-08-RP-0275
Archive Date
Aug 10, 2008