Notice ID: 566a7071572ddcc2de0c319fa309df92Solicitation
Y--Project No. 644-221 ACC SPECIALTY CARE & MRI
Archived on September 30, 2010. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 7:00 AM UTC+02:00
- Posted
- May 7, 2010
- Notice type
- Solicitation
- Set-aside
- Service-Disabled Veteran-Owned Small Business Set Aside
- NAICS
- 236220: Commercial and Institutional Building Construction
- Agency
- Department of Veterans Affairs
Notice details
- Office
- 258-NETWORK CNTRCT OFF 22G (36C258)
- Place of performance
- Phoenix VA Health Care;650 E. Indian School Rd.;Phoenix, AZ 85012 USA
- PSC
- Y: CONSTRUCT OF STRUCTURES/FACILITIES
- Last updated
- Dec 5, 2025
Identifiers
- Solicitation number
- VA-258-10-IB-0070
- Notice ID
- 566a7071572ddcc2de0c319fa309df92
Description
THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO CONTRACTORS UNDER PUBLIC LAW 109-461 SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS (SDVOSB) SET-ASIDE. CONSTRUCTION PROJECT NO. 644-221. The Phoenix VA Healthcare System (PVAHCS), Phoenix, Arizona, intends to issue a solicitation on or about March 1st, 2010 requesting sealed bids in accordance with FAR Part 14(SEALED BIDDING) and FAR Part 36 (CONSTRUCTION) and shall remain open for approximately 45 days. Performance Period is 365 days after issuance of the Notice to Proceed. The Contractor shall provide a Firm Fixed Price bid for work listed below. Work includes, but is not limited to: A. The scope of work is to build-out approximately 23,255 square feet of unfinished floor space in the basement of Building Number 8 of the Carl T. Hayden VA Medical Center; the Ambulatory Care Center (ACC). The new finished spaces will be used for; a PET/CT, Nuclear Medicine Cameras, Psychology Clinics, Mental Health and compensation and Pension department. This build-out also requires construction of new exterior emergency stairway, mechanical shaft, and equipment install on the roof. B. The solicitation documents including all specifications and drawings will be issued on or about March 1st, 2010 and will be posted on the Federal Business Opportunities website. This date is subject to change. Hard copy documents including drawing will not be available all documents for bidding purposes will be posted at the website for download. Site visit information will be provided upon issuance of solicitation. Only one site visit is planned. Bids will be due 45 days after issuance of solicitation. This notice is for informational purposes only and is not a request for submission of offers. No other information is available until issuance of the solicitation. No bidder list is maintained. All potential bidders should register with Federal Business Opportunities if interested in this acquisition. C. All bidders shall be registered and verified in the www.ccr.gov, www.vetbiz.gov, and https://orca.bpn.gov/ websites. This procurement is 100% set aside for Service-Disabled, Veteran-Owned, Small Business (SDVOSB). The NAICS Code is 236220. The associated size standard for this procurement is $33.5 million. Project Magnitude: Between $2,000,000 and $5,000,000. A site visit will be scheduled and the date is TBD and will be provided upon issuance of the solicitation. Only one site visit is planned. The site visit is mandatory.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Kelly DodsonPhone: 602-604-3939 Contracting Specialist
Documents
No documents available.
Lifecycle
Solicitation:
VA-258-10-IB-0070- Pre-Solicitation
- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- 9×Pre-SolicitationFeb 1, 2010
Y--Project No. 644-221 ACC SPECIALTY CARE & MRI
- SolicitationCurrentMay 7, 2010
Y--Project No. 644-221 ACC SPECIALTY CARE & MRI
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product.. | - | Awarded | Open |
Correct FCA Deficiencies Construction - Solicitation The contractor shall be responsible for all aspects of the project and each phase shall be subject to VA approval at designated project milestones. This project includes (but not limited to) all labor, materials, supplies, equipment, services, training, lighting, communications, security, operation and maintenance manuals, as built drawings, permits (if necessary), construction, installation, and commissioning. | - | Solicitation | 09/03/2026 |
Amendment 0002: The purpose of this amendment is to extend the solicitation closing date from November 19, 2026 to December 1, 2026 at 1:00 PM PST. The Government needs additional time to address the RFIs. ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Amendment 0001: This amendment provides the attendees list for the pre-solicitation site visit conducted on October 27, 2026 at Palo Alto VA Medical Center - Menlo Park. The attendees are listed on the attached document named "Site Visit Log 10-27-2026 B-347 Roof Replacement." ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- This is a combined synopsis/solicitation for commercial construction prepared in accordance with part 12. This announcement constitutes the only solicitation. Offers are being requested and a separate written solicitation will not be issued. Solicitation No. 36C26127Q0082, Project No. 640A0-27-104, Replace Roof at Building 347 – Menlo Park at Palo Alto VA Medical Center – Menlo Park is issued as a request for quotation. This acquisition is a total SDVOSB set-aside. The closing date of this solicitation is November 19, 2026, 2:00 P.M. PDT. This is a fire-fixed-price construction requirement. The period of performance is 180 calendar days after NTP. The place of performance is Palo Alto VA Medical Center – Menlo Park, 795 Willow Road, Menlo Park, CA 94025-2539. All requests for information (RFI) regarding this RFQ must be submitted in writing and receive no later than November 3, 2026 at 2:00 PM PDT. All RFIs must be submitted via email to Daniel Jhun at daniel.jhun@va.gov. Offerors are encouraged to submit RFIs as early as possible to allow sufficient time for Government review and response. Late RFIs may not be answered by the Government. This procurement is a total service-disabled veteran-owned small business (SDVOSB) set-aside. NAICS Code is 236220 – Commercial and Institutional Building Construction; Small Business Size Standard: $45M. Bid bonds, payment and performance bonds are required under this solicitation and resultant contract. A bid guarantee in the form of a bid bond must be submitted with the proposal before the deadline. Offerors are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of performing these services. In no event shall failure to inspect the site constitute grounds for a claim after contract award. A site visit has been scheduled on Tuesday, October 27, 2026 at 09:00 A.M. PDT at the front of Building 347, Palo Alto VA Medical Center – Menlo Park, 795 Willow Road, Menlo Park, CA 94025-2539. A comparative analysis approach will be used by a team of Government Technical personnel in accordance with Revolutionary FAR Overhaul (RFO) FAR 12. 203(c)(2) The Government intends to award one (1) contract as a result of this solicitation. In using the comparative analysis approach, the Government will employ business judgement and a comparative evaluation of quotations to determine which quotation represents the best value and the best overall offer to the Government. In accordance with RFO FAR 12.203(c)(2), quotation will be evaluated through a direct comparison of one quotation against another in a uniform manner to determine which quotation best satisfies the Government’s requirements as identified in the RFQ. Award may be made to an offeror other than the lowest-priced offeror or the highest-rated offeror under the non-priced factors when the Government determines that the benefits of a higher-rated quotation warrant any associated price premium. The Government reserves the right to select a quotation that exceeds the minimum requirements of the RFQ when the additional value provided is determined to be beneficial to the Government. DBA Wage Determination No. CA20260018 dated 20260917 is applicable to this solicitation and project. | - | Combined Synopsis | 12/01/2026 |
THIS IS A PRE-SOLICITATION ANNOUNCEMENT. Project No.: 612A4-27-004 Project Title: Correct Mather Loop Road and Install Speed Bumps at Sacramento VA Medical Center, Veterans Health Administration, Regional Procurement Office West, Network Contracting Office 21 (NCO 21) on behalf of VA Northern California Health Care System. Description: The Department of Veterans Affairs Sacramento campus has a requirement to correct Mather Loop Road and Install Speed Bumps in accordance with the draft statement of work (SOW) and specifications. Contractors must demonstrate their ability to meet all requirements listed in this notice. See attached draft document for additional information. All information in this pre-solicitation announcement is a draft and subject to amendment(s) and is in no way binding to the Government. In consideration of time, a draft copy of the SOW is being posted along with the specifications and drawings for review ahead of a site visit. A request for proposal will be issued as a total SDVOSB set-aside. The applicable North American Industry Classification System (NAICS) Code is 236220 Commercail and Institutional Building Construction, and the small business size standard is $45M. PSC Code is Z1DA Maintenance of Hospitals and Infirmaries. The magnitude of construction projects is between $800,000 and $1,000,000. Potential Offerors must be registered in the System for Award Management (SAM) to be eligible for an award (See Internet Site https://www.sam.gov/portal/public/SAM/). Potential Offerors must also have a current Online Representations and Certification Application on file with SAM. This is a pre-solicitation announcement only. Solicitation documents will be available on or around mid November 2026. The solicitation will be a request for quote (RFQ), which will contain quotation instructions, a scope of work (SOW) and specifications. Questions regarding this announcement must be sent in writing to Contract Specialist, Kayla Haruguchi at kayla.haruguchi@va.gov and Contracting Officer, Daniel Jhun at daniel.jhun@va.gov. | - | Pre-Solicitation | 12/16/2026 |
See attached for details. Amendment 0001 - 10/29/2026 - Change Site visit date Amendment 0002 - 11/03/2026 - RFI Answer #1 Amendment 0003 - 11/04/2026 - RFI Answer #2 Amendment 0004 - 11/12/2026 - Site Visit Sign in sheet posting | - | Solicitation | 11/30/2026 |
Additional Details
Solicitation Number
VA-258-10-IB-0070
Archive Date
Sep 30, 2010