GovChime
Notice ID: 2ba8064c9adbf60c3a4ba70468680cccSources Sought

S--Services Sought for Interior Janitorial Services Snow Remeoval, Landscaping and Preventive Maintanence HVAC system

Archived on September 18, 2009. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
12:00 AM UTC−05:00
Posted
September 9, 2009
Notice type
Sources Sought
NAICS
561210: Facilities Support Services
Agency
Department of Veterans Affairs

Notice details

Office
NETWORK CONTRACT OFFICE 19 (36C259)
Place of performance
VA Community Based Outreach Clinic;604 Express Dr.;Gillette, Wyoming;82718 82718 USA
PSC
S: UTILITIES AND HOUSEKEEPING
Last updated
Sep 25, 2026

Identifiers

Solicitation number
VA-259-09-RQ-0424
Notice ID
2ba8064c9adbf60c3a4ba70468680ccc

Description

Services can include interior janitorial of administrative and clinical space including restrooms, exterior snow removal, and exterior grounds maintenance. Internal building square footage is approximately 4,500 square feet and includes bother carpeted and vinyl tiled floor surfaces and laminate counters and working spaces. Exterior space includes grass lawn, shrubbery and planted beds, walkways, and parking for approximately 20 vehicles.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Cindy Kleinholz4100 East Mississipppi AveSuite 1110Glendale Co 80246303-504-3571 cynthia.kleinholz@va.gov

Documents

No documents available.

Lifecycle

Solicitation:VA-259-09-RQ-0424
  1. Market Research

Pre-solicitation or formal solicitation typically follows within 30–180 days. (estimate)

  1. Market ResearchCurrentSep 9, 2009

    S--Services Sought for Interior Janitorial Services Snow Remeoval, Landscaping and Preventive Maintanence HVAC system

    Notice 2ba8064c9adbf60c3a4ba70468680ccc on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
The Mission and Installation Contracting Command-Installation Readiness Center on behalf of the Mission and Installation Contracting Command-Fort Carson, is issuing a solicitation for a contractor to provide Base Operations Support Services at the U.S. Army Fort Carson, CO.Description of Services:The Contractor shall provide all personnel, equipment, supplies, tools, materials, supervision, and other items and non-personal services necessary as defined in this PWS. Work includes all required maintenance, labor, materials and repairs to facilities, structures, buildings, and utilities that are classified as real property, and Army Training and Evaluation Center non-real properties, unless otherwise stated in this contract, to include installed building equipment as defined in Army Regulation (AR) 420-1, Army Facilities Management. The following is a list of Common Level of Services (CLS) that will be included in this acquisition: CLS Service Title 404 Grounds Maintenance 408 Pavement Clearance 411 Facility Maintenance - Vertical 420 Facility Maintenance - Horizontal 501 Heating and Cooling Services 503 Wastewater Services Update as of 11 MAY 2026: The Government is working through Source Selection processes. Please continue to monitor Sam.gov for further updates. __________________________________________________ Update as of APR 2026: The Source Selection Evaluation Board is still in progress. Please continue to monitor Sam.gov for further updates. ____________________________________________________ Update as of MAR 2026: The Source Selection Evaluation Board is still in progress. Please continue to monitor Sam.gov for further updates. _______________________________________________________ Update as of 26 FEB 2026: The Source Selection Evaluation Board is still in progress. Please continue to monitor Sam.gov for further updates. ________________________________________________________ Update as of 22 JAN 2026: The Source Selection Evaluation Board is still in progress. Please continue to monitor Sam.gov for further updates. _________________________________________________________ Update as of 2 DEC 2025: The Source Selection Evaluation Board is still in progress. Please continue to monitor Sam.gov for further updates. __________________________________________________________ Update as of 15 SEP 2025: The Source Selection Evaluation Board is still in progress. Please continue to monitor Sam.gov for further updates. _________________________________________________________ Update as of AUG 2025: The Source Selection Evaluation Board is still in progress. Please continue to monitor Sam.gov for further updates. _________________________________________________________ Update as of 10 JUL 2025: The Source Selection Evaluation Board is still in progress. Please continue to monitor Sam.gov for further updates. __________________________________________________________ Update as of 18 JUN 2025: The Source Selection Evaluation Board is still in progress. Please continue to monitor Sam.gov for further updates. ___________________________________________________________ Update as of 7 APR 2025: The Source Selection Evaluation Board is still in progress. Please continue to monitor Sam.gov for further updates. ___________________________________________________________ Update as of 6 MAR 2025: The Source Selection Evaluation Board is still in progress. Please continue to monitor Sam.gov for further updates. ___________________________________________________________ Update as of 31 JAN 2025: The Source Selection Evaluation Board is still in progress. Please continue to monitor Sam.gov for further updates. ___________________________________________________________ Update as of 17 JAN 2025: The Source Selection Evaluation Board is still in progress. Please continue to monitor Sam.gov for further updates. ___________________________________________________________ Update as of 31 DEC 2024: The Source Selection Evaluation Board is still in progress. Please continue to monitor Sam.gov for further updates. ___________________________________________________________ Update as of 26 NOV 2024: The Source Selection Evaluation Board is still in progress. Please continue to monitor Sam.gov for further updates. ___________________________________________________________ Update as of 5 Nov 2024: The Source Selection Evaluation Board is still in progress. _______________________________________________________________ Update as of 5 Aug 2024: The Government is reviewing proposals and conducting Preaward Debriefs. _______________________________________________________________ Update 17 June 2024: Amendment 0002 is attached along with responses to questions submitted by industry, updated attachments, and updates to Section L. ________________________________________________________________ Update 24 MAY 2024: Amendment 0001 is attached along with responses to questions submitted by industry, updated technical exhibits, and attachments. _________________________________________________________________ Update 23 May 2024: The Government continues to work through the questions submitted by industry. The current proposal due date of 28 May 2024 will be extended via solicitation amendment along with answers to the questions submitted. This solicitation amendment will be posted on or about 28 May 2024. Details regarding the extension to the proposal submission date will be specified in the solicitation amendment when posted to sam.gov. Currently the Government is projecting the solicition due date as being 28 June 2024. _______________________________________________________________ Update 15 May 2024: The Government continues to work through the questions submitted by industry. The current proposal due date of 28 May 2024 will be extended via solicitation amendment along with answers to the questions submitted. This solicitation amendment will be posted on or about 20 May 2024. Details regarding the extension to the proposal submission date will be specified in the solicitation amendment when posted to sam.gov.
-Solicitation06/28/2024
Presolicitation Notice Presolicitation Notice Page 5 of 5 Presolicitation Notice *=Required Field Presolicitation Notice Page 1 of 5 The contractor will provide all material, labor, equipment, and supervision necessary to complete the above-named project at the VA Maryland Health Care System (VAMHCS), Building 1 Community Living Center (CLC) of the Loch Raven Campus. Primary Deliverables and Project Requirements Covid Ward 2nd floor B wing Upgrade exhaust fans Air Handling Unit (AHU-B) located in attic Replace and upgrade EF-1A and EF-1B for higher CFM outputs Install heat tracing for chillers Wiring and junction box located in room G-15. Chiller located outside CLC in the pit behind the service road. Assess current heat tracing for chill water line. Complete and terminate existing heat tracing wiring to an emergency electrical panel in G-17 in coordination with the VA. Panel selection is TBD. Install a 20-amp GFPE circuit breaker for the heat tracing to the panel selected by the VA. Kitchen basement Replace cooling coil(s) AHU-E located in attic. Replace fan motor AHU-E located in attic. AHU has one fan. New motor must be rated for and capable of sustaining a fan speed of 60Hz. Replace Variable Frequency Drive (VFD) VFD located in the attic and attached to the AHU Replace VFD in kind with Manufacturer (ABB) Controls Integration & Coordination VA has an existing contract with Johnson Controls International (JCI). The contractor shall coordinate with the COR and Facility Maintenance to satisfy necessities for the facility s existing Building Automation System (BAS) controls corresponding to all new work. Contractor will replace/reinstall or provide new hardware or connections for BAS monitoring when required to complete BAS programming or integration. This can include control wiring, modulators, switches, routing, existing equipment etc. These requirements are determined on a case-by-case basis. Testing Adjusting & Balancing (TAB) TAB shall occur after HVAC modifications are made. It must be performed by a certified vendor/contractor per TABB and/or other ANAB accredited programs for standard industry HVAC system performance compliance Contractor shall provide notice to and request attendance of the COR and/or other COR-approved VA representation prior to TAB. A report on the TAB results must be delivered to the COR. TAB report will be reviewed and approved by the VA prior to contractual closeout and final payment Warranty, Operations & Manuals (O&Ms) and Shop Drawings Contractor and/or subcontractor shall provide a warranty letter including point of contact, to the VA. Warranty is based on workmanship, material and equipment. Duration of warranty starts after acceptance and use of new equipment & components O&Ms for all new equipment and other components requiring preventative maintenance shall be provided to the VA. All O&M documents must be received by the VA prior to contractual closeout and final payment Contractor shall provide training to the VA. Shop Drawings All layout changes and new equipment shall be updated in as-builts, shop drawings, manufacturer diagrams, details, where applicable. Due to the nature of the contract, this requirement will be determined based on off application by the COR at completion of work. If no applicable documents are required, then the COR will opt for omission. Assumptions Contractor to provide a cost/unit for each of the deliverable items above and use the total amounts provided for their proposal. Contractor to track the quantities used on their pay applications with any amounts left over being returned to the government after final payment. All deliverables must be received by the VA prior to final payment. Line items will be tracked in every pay application. Financial progress for a line item will be cross-referenced with the corresponding item s physical progress and/or completion status. Misrepresentation of a line item s financial progress may result in rejection from the COR and require the contractor to resubmit the pay application with revision(s). Pay applications must be submitted with a total amount not to exceed the Purchase Order (PO) balance. A contract modification from the Contracting Officer (CO) is required for payment application submissions exceeding the PO balance. Additional work outside of the contract and contractual supplement documents (provided drawings, as-builts, details, existing product information, etc) require authorization and written execution from the CO. Any additional work (quantified via labor, material or equipment) performed/provided by the contractor without guidance from the VA or direction from the CO shall not be included in payment applications. The contractor is committed to working at their own expense and risk under this condition. Supplemental contractual and scope of work include existing as-builts, details and compliance for VA guidelines, federal & state guidelines, applicable codes, etc. VA can provide the contractor with additional available drawings and other documentation. These are considered items pertaining to the original contract s scope of work Standard Inclusions & General Compliance Contractor is responsible for cleaning the work area of trash regardless of if it is their trash or not. This includes areas that other entities may have access to like the attic and mechanical spaces. Contractor is responsible for stewardship of work area and compliance with VA medical facility guidelines. Contractor will adhere to VA-granted permitting requirements and industry standard safety practices including but not limited to: Infection Control Risk Assessment (ICRA) Pre-Construction Risk Assessment (PCRA) Hot or burn work Confined space entry work (if applicable) Lock out tag out (LOTO) procedures PPE Parking at the Loch Raven campus is limited and contractors are subject to facility guidelines for locations of contractor vehicles. Guidance for contractor parking is enforced by the COR, Facility Maintenance Supervisor, Campus Manager, and Deputy Medical Director. Parking outside the campus boundary is not in the VA s jurisdiction The contractor shall coordinate with the facility prior to work that impacts patient care such as shutting down A/C, heating, power or other utilities. Utility and HVAC shutdowns require at least a 14-day written request to the facility per the VA s internal Standard Operating Procedure. Period of performance is 90 calendar days.
-Solicitation11/30/2026
The contractor will provide all material, labor, equipment, and supervision necessary to complete the above-named project at the VA Maryland Health Care System (VAMHCS), Building 1 Community Living Center (CLC) of the Loch Raven Campus. Primary Deliverables and Project Requirements Covid Ward 2nd floor B wing Upgrade exhaust fans Air Handling Unit (AHU-B) located in attic Replace and upgrade EF-1A and EF-1B for higher CFM outputs Install heat tracing for chillers Wiring and junction box located in room G-15. Chiller located outside CLC in the pit behind the service road. Assess current heat tracing for chill water line. Complete and terminate existing heat tracing wiring to an emergency electrical panel in G-17 in coordination with the VA. Panel selection is TBD. Install a 20-amp GFPE circuit breaker for the heat tracing to the panel selected by the VA. Kitchen basement Replace cooling coil(s) AHU-E located in attic. Replace fan motor AHU-E located in attic. AHU has one fan. New motor must be rated for and capable of sustaining a fan speed of 60Hz. Replace Variable Frequency Drive (VFD) VFD located in the attic and attached to the AHU Replace VFD in kind with Manufacturer (ABB) Controls Integration & Coordination VA has an existing contract with Johnson Controls International (JCI). The contractor shall coordinate with the COR and Facility Maintenance to satisfy necessities for the facility s existing Building Automation System (BAS) controls corresponding to all new work. Contractor will replace/reinstall or provide new hardware or connections for BAS monitoring when required to complete BAS programming or integration. This can include control wiring, modulators, switches, routing, existing equipment etc. These requirements are determined on a case-by-case basis. Testing Adjusting & Balancing (TAB) TAB shall occur after HVAC modifications are made. It must be performed by a certified vendor/contractor per TABB and/or other ANAB accredited programs for standard industry HVAC system performance compliance Contractor shall provide notice to and request attendance of the COR and/or other COR-approved VA representation prior to TAB. A report on the TAB results must be delivered to the COR. TAB report will be reviewed and approved by the VA prior to contractual closeout and final payment Warranty, Operations & Manuals (O&Ms) and Shop Drawings Contractor and/or subcontractor shall provide a warranty letter including point of contact, to the VA. Warranty is based on workmanship, material and equipment. Duration of warranty starts after acceptance and use of new equipment & components O&Ms for all new equipment and other components requiring preventative maintenance shall be provided to the VA. All O&M documents must be received by the VA prior to contractual closeout and final payment Contractor shall provide training to the VA. Shop Drawings All layout changes and new equipment shall be updated in as-builts, shop drawings, manufacturer diagrams, details, where applicable. Due to the nature of the contract, this requirement will be determined based on off application by the COR at completion of work. If no applicable documents are required, then the COR will opt for omission. Assumptions Contractor to provide a cost/unit for each of the deliverable items above and use the total amounts provided for their proposal. Contractor to track the quantities used on their pay applications with any amounts left over being returned to the government after final payment. All deliverables must be received by the VA prior to final payment. Line items will be tracked in every pay application. Financial progress for a line item will be cross-referenced with the corresponding item s physical progress and/or completion status. Misrepresentation of a line item s financial progress may result in rejection from the COR and require the contractor to resubmit the pay application with revision(s). Pay applications must be submitted with a total amount not to exceed the Purchase Order (PO) balance. A contract modification from the Contracting Officer (CO) is required for payment application submissions exceeding the PO balance. Additional work outside of the contract and contractual supplement documents (provided drawings, as-builts, details, existing product information, etc) require authorization and written execution from the CO. Any additional work (quantified via labor, material or equipment) performed/provided by the contractor without guidance from the VA or direction from the CO shall not be included in payment applications. The contractor is committed to working at their own expense and risk under this condition. Supplemental contractual and scope of work include existing as-builts, details and compliance for VA guidelines, federal & state guidelines, applicable codes, etc. VA can provide the contractor with additional available drawings and other documentation. These are considered items pertaining to the original contract s scope of work Standard Inclusions & General Compliance Contractor is responsible for cleaning the work area of trash regardless of if it is their trash or not. This includes areas that other entities may have access to like the attic and mechanical spaces. Contractor is responsible for stewardship of work area and compliance with VA medical facility guidelines. Contractor will adhere to VA-granted permitting requirements and industry standard safety practices including but not limited to: Infection Control Risk Assessment (ICRA) Pre-Construction Risk Assessment (PCRA) Hot or burn work Confined space entry work (if applicable) Lock out tag out (LOTO) procedures PPE Parking at the Loch Raven campus is limited and contractors are subject to facility guidelines for locations of contractor vehicles. Guidance for contractor parking is enforced by the COR, Facility Maintenance Supervisor, Campus Manager, and Deputy Medical Director. Parking outside the campus boundary is not in the VA s jurisdiction The contractor shall coordinate with the facility prior to work that impacts patient care such as shutting down A/C, heating, power or other utilities. Utility and HVAC shutdowns require at least a 14-day written request to the facility per the VA s internal Standard Operating Procedure. Period of performance is 90 calendar days.
-Pre-Solicitation12/14/2026
-Solicitation11/20/2026
The Department of Veterans Affairs will be soliciting for vendors that can provide Steam Quality Testing Services for the Hampton VA Medical Center located in Hampton, VA. This will be performed in accordance with the Performance Work Statement included in the solicitation.  A Request for Quotation will be issued on or about November 6, 2026.  This is a Small Business Set-Aside. To be eligible for award, the contractor must be registered in in the SAM database at http://www.sam.gov. The applicable North American Industry Classification System (NAICS) Code is 561210, Facilities Support Services, the Size Standard is $47.0 Million, and the Product Service (PSC) Code is H144, Quality Control Furnace, Steam Plant and Drying Equipment; Nuclear Reactors. Contractors interested in providing this service should monitor Contract Opportunities for the solicitation #36C24627Q0084.  Point of Contact: Yanique WilliamsChin    Email: Yanique.WilliamsChin@va.govÂ
-Pre-Solicitation11/20/2026

Additional Details

Solicitation Number

VA-259-09-RQ-0424

Archive Date

Sep 18, 2009

Office Address

Greenwood Village, CO, 80111