Notice ID: 33ef325661c1bd9b73e7e7e8e9cff64eAward NoticeAwarded
RECOVERY Y--Recovery Act - Recovery Act Project 648-08-134 Add MATV and Radio in Patient Rooms
Awarded on September 30, 2009. Full description on SAM.gov.
Awarded tounder VA260-RA-0718 (source: SAM.gov award notice)• $72.5K
Overview
- Posted
- September 30, 2009
- Notice type
- Award Notice
- NAICS
- 236220: Commercial and Institutional Building Construction
Notice details
- Place of performance
- Vancouver VA Medical Center;1601 E 4th Plain Blvd;Vancouver, WA 98662 US
- PSC
- Y: CONSTRUCT OF STRUCTURES/FACILITIES
- Last updated
- Sep 25, 2026
- Award date
- Sep 30, 2009
- Award amount (SAM.gov award notice)
- $72.5K
Identifiers
- Solicitation number
- VA-260-09-RA-0522
- Notice ID
- 33ef325661c1bd9b73e7e7e8e9cff64e
- Award number (PIID)
- VA260-RA-0718
Description
RECOVERY, Department of Veterans Affairs, Portland VA Medical Center, 1601 E 4th Plain Blvd, Vancouver, WA anticipates soliciting offers and subsequently awarding a contract for the construction of general construction, alterations, and improvements to construct Master Antennae Television ( MATV ) and Radio, including equipment, and electrical work for the installation of headend equipment, cabling, and work necessary to support and encompass a viable, working system to be available at each patient/resident bed located at its Vancouver Campus in Vancouver, Washington. This notice is advertised as "information only" and is limited to Service-Disabled Veteran-Owned Small Businesses (SDVOSB's) pursuant to the authority set forth in 38 USC 8127. The contractor shall furnish all labor, materials, equipment, supplies, and travel necessary to perform this contract. A full set of plans and specifications will be provided in the RFP when issued. The completion of this project shall not exceed 180 days from Notice to Proceed. The solicitation will be issued as an "Request for Proposal" conducted in accordance with FAR Parts 15, 19, and 36 under NAICS 236220, Commercial and Institutional Building Construction, with a size standard of $33.5M. In accordance with the Instructions to Offerors - Competitive Acquisition provision of this solicitation (FAR 52.215-1 Instruction to Offerors-Competitive Acquisition), the Government intends to evaluate proposals and award a contract without discussions with offerors. Therefore, the offeror's initial proposal should contain the offeror's best proposal. The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. Only one award will be made as a result of this solicitation. In accordance with FAR 15.101-2(b)(1) award will be made on the basis of the lowest evaluated price of proposals meeting or exceeding the acceptability standards for non-cost factors. The solicitation will be issued on or about August 6, 2009. Bids will be due thirty calendar days thereafter, they will be delivered by e-mail address listed in the solicitation. The Government intends to award a firm-fixed-price contract. Magnitude of Construction is expected to be between $100,000 and $250,000 for this project. After solicitation issuance, contractors may view and/or download this solicitation and all amendments at the Federal Business Opportunities (FBO) website. The primary point of contact for this project is Robert Kolln Jr. who can be reached at robert.kolln@va.gov. The Government reserves the right to use only the internet as notification of any amendments to this solicitation. It is the offeror's responsibility to view the FBO website daily for any amendments to the solicitation. Telephone questions will not be accepted. Questions will not be accepted until after the site visit established in the solicitation.
Award Overview
Award Number
VA260-RA-0718
Award Amount (SAM.gov award notice)
$72.5K
Award Date
Sep 30, 2009
Awardee
Original Solicitation
Notice ID: 33ef325661c1bd9b73e7e7e8e9cff64e
Posted Date: Sep 30, 2009
Original Response Deadline: Not specified
Contract Details
No FPDS record matches this award number at the same department yet
Contract details typically appear within 2-4 weeks after award; DoD awards are published about 90 days after signature.
Contacts
Contracting Officer
Primary Contact
Robert KollnContract Specialist 360-852-9862 Contract Specialist
Documents
No documents available.
Lifecycle
Solicitation:
VA-260-09-RA-0522- Pre-Solicitation
- Solicitation
- Awarded
This opportunity has been awarded.
- 2×Pre-SolicitationJul 22, 2009
RECOVERY Y--RECOVERY Recovery Act Repair/Install TV and Radio in Patient Rooms
- SolicitationSep 3, 2009
RECOVERY Y--RECOVERY Recovery Act Repair/Install TV and Radio in Patient Rooms
- AwardedCurrentSep 30, 2009
RECOVERY Y--Recovery Act - Recovery Act Project 648-08-134 Add MATV and Radio in Patient Rooms
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
561-26-104 Repair OR & Bathroom | 67% | Solicitation | 11/20/2026 |
Amendment 2 - New Site Visit# 2 scheduled, updating Questions Close date, updating RFP Close date -New Site Visit# 2 is now scheduled for Wednesday, November 18, 2026 at 8:30 am CST. Please meet up at the Fermilab Badge Office and then the site visit at Wilson Hall. Everyone is required to meet up at the Fermilab Badge Office for the pre-brief of the project. Follow the instructions in Exhibit O to apply for access to the site. Please email the Procurement Specialist at ginakern@fnal.gov with the information listed in the RFP regarding the Site Visit prior to attending. This includes if you already have site access. Please arrive at least 5-10 minutes early as the Site Visit will start on time. -New Questions Close Date is now November 24, 2026 at 5:00 pm CST. All questions must be submitted in writing only. Send all questions, referencing the RFP# in the subject line to ginakern@fnal.gov. -New Closing Date for the Request for Proposal (RFP) is now December 9, 2026 at 3:00 pm CST. Please submit your proposal with all required documents to ginakern@fnal.gov. ************************************************************************************************************************* Fermilab has a new requirement for Wilson Hall Floor 16 Electric and Elevator Machine Rooms Fire Rating and Mechanical Upgrade located at Batavia, IL. Site visit is scheduled for November 4, 2026 at 8:30 am CST. Request for Proposal Closes on November 17, 2026 at 3:00 pm CST. | 64% | Solicitation | 12/09/2026 |
Sources Sought Response Form Renovate Mission Support Facility (B145) & Repair/Renovate Conference Room (LRSO), Alert Facility (B1085) Minot Air Force Base (MAFB), North Dakota Sources Sought Notice # W9128F27SM005 NOTICE TYPE: Market Research / Sources Sought ACQUISITION AUTHORITY: 10 USC 2808a (Other Transaction Authority for Military Construction Projects) PROJECT TITLES: FY27 Renovate Mission Support B145, MAFB, ND FY27 RENOVATE CONFERENCE ROOM (LRSO) BUILDING 1085, MINOT AFB, ND NAICS CODE: 236220 – Commercial and Institutional Building Construction ESTIMATED VALUE: Firm Construction Cost Limitation (CCL): Renovate Mission Support Building 145 (CCL): $ 31,923,000 Renovate Conference Room (LRSO) Building 1085 (CCL): $ 3,503,000 PURPOSE By way of this Industry Outreach Questionnaire, the USACE-Omaha District intends to gauge Industry’s interest and capabilities in providing the requirement described hereunder. The Government welcomes qualifications and capability statements from all qualified entities regardless of federal construction experience or business size. The responses to this notice will be used for planning purposes for the upcoming procurement(s). This notice does not constitute a Request for Qualifications (RFQ), Request for Proposal (RFP), Request for Quotes, or Invitation for Bids (IFB). It does not guarantee the future issuance of an opportunity notice, nor does it commit the government to execute an agreement or pay for any information or administrative costs incurred in responding to this notice. This Agency will not accept unsolicited submissions in response to this notice. All costs associated with responding will be solely at the responding party's expense. Responding parties are requested to refrain from submitting proprietary information. Responses are to be sent via email to (POC) Phillip Wickham at Phillip.L. Wickham@usace.army.mil and (POC) Jessica Beckman at Jessica.L. Beckman@usace.army.mil not later than 11 December 2026 by 2:00 pm (MST)). Narratives shall be no longer than 5 pages. Email responses are required. PROBLEM AND BACKGROUND STATEMENT: The U.S. Army Corps of Engineers (USACE) is conducting market research on behalf Minot Air Force Base which has a requirement to address two distinct, but critical facility needs. The first is a full-scale renovation of the Mission Support Facility (Building 145), which requires significant interior, exterior, and systems modernization to continue supporting its operational function. The Mission Support Facility has a project timeline for award of the phase 1 agreement of FY26 Q3. The second is the need to convert an existing conference room (Building 1085) into a high-security Special Access Facility (SAF) accredited to Intelligence Community Directive (ICD) 705 standards. To streamline execution and foster innovation, the Government intends to address this suite of projects programmatically under a single Other Transaction Agreement (OTA). This approach seeks a capable partner or consortium to deliver a comprehensive design-build solution for both projects, potentially on a concurrent or closely phased schedule. The Special Access Facility (SAF) has a project timeline for award of the phase 1 agreement of FY26 Q3 The U.S. Army Corps of Engineers (USACE), Omaha District, is conducting market research on behalf of the Department of the Air Force (5th Bomb Wing / Air Force Global Strike Command) at Minot Air Force Base (AFB), North Dakota. The existing Minot AFB Alert Facility (Building 1085) requires critical renovation and spatial reconfiguration of its existing briefing, projector, and office spaces (Offices 225, 226, 227, Projector/Briefing Room 228, and a new Entry Control Vestibule, totaling approximately 2,660 SF) to establish a state-of-the-art Special Access Facility (SAF) supporting the Long-Range Stand-Off (LRSO) mission. CurrRntly, the existing spaces fail to meet the operational, acoustic, and physical security requirements of the mission users. Furthermore, the space requires extensive modernization to achieve full compliance with Intelligence Community Directive / Intelligence Community Standard (ICD/ICS 705) for Classified Open Discussion (OD) up to the Top Secret (TS) level. To resolve these operational shortfalls within an accelerated timeline, USACE intends to execute this project utilizing an innovative Construction Manager at Risk (CM@Risk) acquisition approach authorized under Other Transaction Authority (OTA) pursuant to 10 U.S.C. § 2808a. The Government's in-house USACE Design Team serves as the 100% Designer of Record (DOR) for both projects. The Government will advance the design for project 1 and 2 to an approximate 95% completion level, which will serve as the technical Requirements Package. The objective of this acquisition strategy is to select the single "best-suited" construction partner based on qualifications. The selected partner will collaborate with the USACE in-house DOR during Phase 1 to validate constructability, refine trade pricing, mitigate specialized supply-chain risks, and establish an open-book Guaranteed Maximum Price (GMP) prior to transitioning into Phase 2 physical construction execution. PROJECT DESCRIPTION AND OBJECTIVES: Project 1: Renovate Mission Support Center, Building 145 This project involves complete renovation and conversion of roughly 28,000 SF of the 45,236 SF facility into a centralized point for mission support functions for all airman, families, and retirees. General Demolition & Hazardous Abatement: Wall to wall, as required to implement the new layout and update dated systems. This includes but is not limited to the following: masonry and/or steel-studs walls; flooring, interior doors, and abandoned equipment; water, sewer and venting lines; electrical conductors and panels; HVAC distribution and equipment systems; and exterior doors & windows. All abandoned construction debris and equipment be to be recycled and/or disposed of off-site. Removal and disposal asbestos and other hazardous materials. Entry Control Vestibules: as required, replace entry/exit flow and ADA compliance, to accommodate fire alarm panels, and to account for any loading/unloading requirements. Mechanical: Update water lines and PIV to ensure they can independently support the fire suppression system, building conversion, and increased occupant load. Update all restroom plumbing, fixtures, exhaust system, and below grade plumbing, as required to support the new building occupant loads and revised layouts. Electrical Utility Systems: Update electrical, including subpanels, transformer(s), MDP, and switch gear. Demo existing electrical conductors, conduit, and grounding system on the Power Distribution System as required. Install emergency LED lighting in compliance with UFC 3-600-01.) Demolish interior and exterior lighting and replace with LED lights per UFC 3-530-01. Provide electrical load analysis to ensure maximum flexibility for future system changes. Civil: Replace/evaluate the exterior utility connections and site conditions. This includes but is not limited to the following: sanitary sewer, water supply, electrical feeds, site lighting, site drainage, and communications. Provide new communications feeds into separate and new COMM rooms. Update parking requirements are needed to serve the new workforce and guest occupant loads. Additional site work, including paving and utilities, is also required. Project 2: Convert Conference Room to Special Access Facility (SAF), Building 1085 This project provides for the complete architectural, structural, mechanical, electrical, and physical security renovation of approximately 2,660 SF on the second floor of Building 1085 (Area #1) at Minot AFB, North Dakota. The project will convert existing non-compliant spaces into an accredited, modern Special Access Facility (SAF) / Sensitive Compartmented Information Facility (SCIF) with an integrated Entry Control Vestibule, Briefing Room, Projector Room, and secure administrative offices. The scope of this acquisition includes: Demolition & Hazardous Abatement: Comprehensive selective demolition of existing interior wall framing, floor finishes, and ceiling systems down to the original structural substrate, along with required asbestos and lead-based paint testing and abatement. Radio Frequency (RF) Shielding & Acoustics: Application of continuous Radio Frequency (RF) foil barrier shielding across all outside perimeter structural surfaces—including the structural concrete floor, exterior/perimeter walls, and true concrete/corrugated metal ceiling deck. All electrical conduit, junction boxes, and fixtures on RF-treated surfaces must be surface mounted. All perimeter partitions, assemblies, and penetrations must be acoustically engineered and sound-baffled to satisfy Sound Transmission Class (STC) ratings for Top Secret Open Discussion per ICD/ICS 705 and AFGSC standards. Entry Control Vestibule: Construction of a secure entry control vestibule positioned between the existing restroom entry and Office 225. The vestibule will feature dual acoustical security doors (the outer door incorporating an RF foil barrier), an internal 6-inch step transition to the raised flooring, a visitor sign-in desk, and rough-in infrastructure for security cameras. Raised Access Flooring & Interior Systems: Installation of a new 6-inch accessible panel raised flooring system throughout the SAF footprint to accommodate concealed under-floor power, signal, and secure telecommunications raceways; new suspended acoustical ceiling systems at a minimum height of 9’-0” AFF; and Structural Interior Design (SID) / Furniture, Fixtures & Equipment (FF&E) integration. Specialized Mechanical (HVAC) Systems: Provision of a brand-new, self-contained, standalone HVAC system serving exclusively the SAF area, fully compliant with ICD 705 (disconnecting, blanking, and sealing all existing supply/return ducts originating from adjacent building zones). Fresh air intake shall be routed through internal mechanical space and equipped with physical security bars, anti-listening mesh, and acoustic sound baffles. The system will tie into the base Energy Management Control System (EMCS) VLAN. In strict accordance with Minot AFB Roofing Standards, no mechanical equipment, ducting, or penetrations are permitted on the roof; all equipment must be housed internally. Electrical, Fire Protection & Life Safety: Upgraded electrical service including an updated building one-line electrical diagram complying with NFPA six-switch disconnect requirements; interior LED lighting compliant with UFC 3-530-01; a fully addressable fire alarm system capable of direct, point-to-point reporting to the base D-21 system without the use of intermediate relays; and tie-ins to the building's Mass Notification System (MNS). Security Infrastructure (IDS / CCTV / Intercom): Complete raceway, electrical rough-in, conduit, and box installations for a new Security Alarm System (Advantor IDS), internal and external surveillance cameras, and intercom speakers. All security wiring will be homerun back to Room 209 for final component integration Exterior & Installation Compliance: Full compliance with Minot AFB exterior siding, trim, and roofing standards, as well as DoD Minimum Antiterrorism Standards for Buildings (UFC 4-010-01) and applicable Facility-Related Control Systems (FRCS) cybersecurity standards. PROPOSED ACQUISITION METHODOLOGY AND SCHEDULE, DESIGN STATUS: To maximize collaboration, schedule speed, cost certainty, and industry innovation while maintaining a firm Construction Cost Limitation, USACE Omaha intends to utilize an Other Transaction (OT) Agreement under the authority of 10 USC 2808a, rather than a traditional FAR-based contract. This collaborative framework will be structured in a multi-phase Construction Management at Risk (CM@Risk) the design is at/near 95% completion: The builder is hired during Phase 1 to act as an expert consultant, helping the Designer of Record (DOR) push the design from 95% to 100% using real-time market data and MII (MCACES 2nd Generation) cost comparisons. Once the design hits 100% and the MII estimate validates the open-book pricing, the agreement transitions to Phase 2, where the builder goes "At-Risk" to construct the facility under a Guaranteed Maximum Price (GMP). The DOR retains design liability, but the contractor drives constructability and assumes responsibility for layout, schedule, and trade coordination. The Pricing Structure: Pre-Con Fee + Target Fee & GMP Preconstruction Services Fee: A fixed-price amount paid to the contractor strictly to fund their time spent helping the A/E finalize the 95% design into a 100% design. The Target Fee: The contractor’s transparent profit margin for managing the actual construction, bid competitively upfront. The GMP: The absolute ceiling for the construction phase (Validated Direct Costs + Target Fee + Shared Contingency). PHASED EXECUTION PLAN Phase 1: Preconstruction Services Agreement (CM@Risk Advisory) Solicitation (White Papers): The Solicitation would likely include the 95% design. The Deliverable is anticipated to be a concise 5-to-10 page White Paper. Evaluation Criteria will likely include corporate capability and CM@Risk past performance; preconstruction approach (how the firm plans to collaborate with the Government's A/E to close the remaining 5% design gap, identify value-engineering opportunities, and mitigate supply-chain risks); proposed Target Fee (for construction) and Preconstruction Services Fee. The Pitch Meeting (Oral Presentations): A 90-minute pitch where the contractor must bring their Project Manager, Site Superintendent, and their Preconstruction Manager. The Government team assesses how well the contractor's team will integrate with the A/E during the critical final design push. The OT will initially be awarded and funded only for the Preconstruction Services Fee. Design Finalization (Bridging the 5% Gap): The contractor’s Preconstruction team sits with the Government and the DOR. Because the design is not locked, they can actively change it. They perform value engineering, finalize equipment selections, and ensure the drawings are 100% constructible. Open Book Pricing vs. MII: As the design reaches 100%, the contractor conducts open-book market outreach. The Government and contractor review actual sub-bids together. USACE cost estimators finalize the Independent Government Estimate (IGE) using the MII software to validate costs and establish the GMP base. Phase 2: Construction Execution Agreement (Going "At-Risk") Execution: The Agreements Officer (AO) executes a bilateral modification to the OT Agreement, incorporating the GMP and funding the physical construction. Risk Allocation: Under CM@Risk, the contractor is now "At-Risk." While the DOR still owns fundamental engineering failures, the contractor loses the ability to claim "defective design" for constructability issues, material delays, or coordination errors, because they were explicitly paid to help finalize those exact decisions using market and MII data during Phase 1. REQUIRED INFORMATION TO BE SUBMITTED IN RESPONSE TO THIS NOTICE: Company Name, address, phone number, point of contract, email, web address: CAGE Code and Unique Entity Identifier (UEI), if available: Single and aggregate bonding levels: Current CMMC level reported in SPRS (if applicable): SUBMISSION REQUIREMENTS: What standard industry administrative practices, terms, or conditions should the Government adopt within this OTA to make it highly effective for a CM@Risk project? What are the most critical market constraints you currently anticipate for this scope of work (e.g., labor shortages, material lead times, equipment availability, specialized trade capacity? Provide 2–3 examples of projects completed in the last 10 years that involve new construction and/or major renovation on an active DoD installation. For each project, specify its final construction cost and the acquisition method used. Describe your experience working in and around mission-critical, semi-occupied facilities. What specific measures does your firm implement to ensure zero disruption to ongoing client operations? Provide any feedback, concerns, or recommendations your company has regarding the Government’s proposed hybrid approach (utilizing OTA authority to execute a CM@Risk for this project. Other Transaction Authority (OTA) & Statutory Compliance: Innovative Technologies: Describe any innovative materials, methods, or technologies your firm could propose for a project of this scale that could lead to cost savings, schedule acceleration, or enhanced facility performance and resilience. Barriers to Innovation: What commercial or Government-imposed barriers currently make it difficult to propose or implement innovative construction technologies? How could the flexibility of an OTA help overcome these barriers? CM@Risk & Design-Assist Involvement: 95% Design Entry: The Government plans to bring the CM@Risk contractor on board when the design is at 95%. Based on your experience, is a 5% design gap sufficient to add meaningful constructability and value-engineering input, or are the most critical decisions already locked in? Collaborative Framework: What collaborative mechanisms do you recommend the Government implement to rapidly close the 5% design gap and transition to a validated GMP? Describe your experience executing Construction Manager at Risk (CM@Risk) or other highly collaborative delivery methods, particularly where you served as a consultant before going "at-risk". Guaranteed Maximum Price (GMP), Risk Allocation & Compensation: Preconstruction Compensation: What specific compensation structures (e.g., fixed stipends, time-and-materials) would best compensate your firm for the pre-construction effort and design-assist phase? Open Book Pricing: How do you approach "open-book" pricing and transparency during Phase 1 to build trust and ensure the Government is receiving fair market value before locking in the GMP? Phase 1 Off-Ramp Risk: If the Government and the contractor cannot reach an agreement on the final GMP, what specific off-ramp conditions are critical to your firm? Teaming & Subcontractor Integration: Under a CM@Risk model starting at a 95% design, how and when do you plan to on-board your critical subcontractors (e.g., structural steel, MEP, fire protection)? Will you compete these subcontracts openly during Phase 1 to build the open-book GMP, or do you prefer bringing in established partners from day one? Feedback on the Acquisition Strategy & Alternatives: Would your organization be interested in competing for a single, consolidated Other Transaction Authority (OTA) agreement that incorporates Project 1 and Project 2 as distinct scopes of work at the same installation? Please identify any anticipated benefits, risks, or challenges associated with consolidating these requirements under one OTA. Does the proposed CM@Risk-OTA strategy incentivize your firm to participate? Why or why not? Are there alternative acquisition strategies, phasing approaches, or commercial practices the Government has not considered that would result in a more efficient process, faster delivery, or lower cost? COMMENTS: Provide comments or identify any concerns your company has regarding the planned approach. Note that the Government will not be responding to inquiries about the action at this time. Your responses and comments will be used by Government personnel to assess the viability and scope of the proposed approach and will be kept in the strictest confidence. Telephone inquiries will not be accepted. ACRONYMS AND DEFINITIONS: CUI (Controlled Unclassified Information): Information that requires safeguarding or dissemination controls pursuant to and consistent with applicable law, regulations, and government-wide policies, but is not classified under Executive Order 13526 or the Atomic Energy Act, as amended. GMP (Guaranteed Maximum Price): A pricing structure commonly used in Progressive Design-Build where the parties collaboratively develop the design, scope, and pricing prior to establishing a final construction price. Once negotiated and incorporated into the Agreement through a modification, the GMP functions as a Firm-Fixed-Price (FFP) commitment for the defined scope of work. The Design-Builder assumes the risk for completing the work within the negotiated GMP and is generally responsible for cost overruns, except for Government-directed changes, differing site conditions, or other authorized modifications that formally adjust the GMP. ICD/ICS (Intelligence Community Directive/Intelligence Community Standard): A system of policy documents that govern the U.S. Intelligence Community. ICD/ICS 705 specifically provides the standards for the secure design, construction, and operation of Sensitive Compartmented Information Facilities (SCIFs). Off-Ramp: Refers to a contractual mechanism that allows the Government to discontinue the Progressive Design-Build relationship if a fair and reasonable GMP or FFP for construction cannot be achieved. Upon off-ramp, the Government retains rights to the completed design to continue the project through another delivery method or design-builder. OT (Other Transaction) Agreement: A legally binding instrument other than a standard contract, grant, or cooperative agreement. OTs are not subject to the Federal Acquisition Regulation (FAR) and provide significant flexibility in tailoring the procurement process and terms to the needs of a project. Construction Manager at Risk (CM@Risk): Integrated project delivery method where the owner contracts a construction manager to provide advisory, estimating, and scheduling services during the design phase and then act as the general contractor during construction. Under this model, the construction manager commits to delivering the project within a Guaranteed Maximum Price (GMP), legally assuming the financial risk for any allowable cost overruns beyond that established ceiling. SAM (System for Award Management): The official U.S. government website where all entities must be registered to do business with the federal government. SCIF (Sensitive Compartmented Information Facility): An accredited area, room, group of rooms, or installation where sensitive, compartmented information (SCI) may be stored, used, discussed, and/or electronically processed. UEI (Unique Entity Identifier): The 12-character alphanumeric identifier assigned to all entities (public and private companies, individuals, institutions, or organizations) who register to do business with the federal government in the System for Award Management (SAM). USACE (U.S. Army Corps of Engineers): The federal agency, acting as the engineering and construction agent for the Department of Defense, responsible for managing this solicitation and the resulting OT. | 62% | Market Research | 12/11/2026 |
This is an Indefinite Deliver, Indefinite Quantity contract for construction efforts at Hill AFB, UT (Davis County); the Carter Creek Recreational Property at Evanston WY; Utah Test and Training Range (UTTR); Little Mountain Test Annex, UT. NV Boulder Seismic Site, WY. Each construction project will be awarded by individual task order) TO) issued against the basic contract and specifying work in support of real property maintenance, repair, alteration, and new construction. | 55% | Solicitation | 11/16/2026 |
DESCRIPTION: The U.S. Army Corps of Engineers (USACE), Louisville District intends to issue Request for Proposal (RFP) W912QR27RA005. This project will utilize a Design-Build-to-Budget delivery method to provide a new Soldier Fitness Training and Testing Facility to contain a 54,600 SF multipurpose athletic field via an enclosed structure at Fort McCoy, WI. The Design-Build Contractor shall design and construct the multipurpose facility housing the athletic field to result in a complete and usable facility including all permitting, sitework, and utilities. The facility will consist of an indoor 200-meter rubberized running track and turf infield sized according to Army Techniques Publication (ATP) 7-22.01 Holistic Health and Fitness Training requirements for completing the annual Army Combat Fitness Testing (ACFT). The 200-meter rubberized track will consist of three 4-foot lanes with the lanes striped. Once this project is completed it will be recognized as a permanent facility on Fort McCoy. Supporting facilities include site development, modification to existing improvements, utilities and connections, lighting, paving, sidewalks, storm drainage, information systems, landscaping and signage. Consistent temperature control inside the facility shall be provided by self-contained systems. ATFP measures in accordance with the Department of Defense (DoD) Antiterrorism for Buildings will be provided. A life safety analysis of the facility shall be conducted to determine compliance with UFC, IBC, and NFPA codes and standards. A new addressable fire alarm system shall be installed in the facility that is compatible with the existing base fire alarm reporting system. Comprehensive building design services shall be required. Accessibility for individuals with disabilities shall be required. The multipurpose athletic facility will be periodically occupied and shall require adequate clearance and circulation for personnel, maintenance and operations. This is not a continuously used facility, and during periods of non-use utilities will be reduced or disconnected to conserve energy. The facility shall be designed to a minimum life of 40 years and in accordance with DoD’s Unified Facilities Criteria (UFC) 1-200-02 High Performance and Sustainable Building Requirements including energy efficiencies, building envelope, and integrated systems performance. Contract duration is currently estimated at 730 calendar days. Funds are not presently available for this acquisition. No contract award will be made until appropriated funds are made available. TYPE OF CONTRACT AND NAICS: This RFP will be for one (1) Firm-Fixed-Price (FFP) contract. The North American Industrial Classification System Code (NAICS) for this effort is 236220 – Commercial and Institutional Building Construction. TYPE OF SET-ASIDE: This acquisition will be an Unrestricted (Full and Open) Procurement. SELECTION PROCESS: This is a two-phase Design-Build to Budget procurement. The proposals will be evaluated using a Best Value Trade-Off (BVTO) source selection process. The technical information contained in each offeror's proposal will be reviewed, evaluated, and rated by the Government. Potential offerors are invited to submit their information as will be described in Section 00 22 16 of the Solicitation for Phase I and Section 00 22 18 of the Solicitation Phase II amendment for review and consideration by the Government. The selection process for Phase I will focus on past performance, qualifications, and integrated Design-Build experience of each offeror’s proposed Design-Build team. Pro-Forma Information such as bonding and financial capability will also be required to meet the minimum requirements of the solicitation. Following the completion of the evaluation of Phase I proposals, a maximum of three (3) of the most highly qualified offerors will be invited to proceed to Phase II and be issued a Draft RFP. The Government’s technical team will hold a series of confidential, 1-on-1 proprietary meetings with each Phase II offeror to review preliminary design concepts; provide feedback; ensure continuous alignment on scope, schedule, and budget; and course-correct misunderstandings to ensure that solutions maximize the value of the fixed budget. After the meetings conclude, the Government will issue the Final Phase II RFP exclusively to the down-selected offerors. The Final RFP will include any needed changes resulting from the proprietary meetings and additional program documents to support final proposal submissions. The Phase II proposals will be evaluated by the Government for each offeror’s innovative and optimized design/technical solutions that meets all the project’s performance requirements (baseline compliance) and betterments within the fixed budget ($14,676,000) to maximize the utility of the full budget to deliver the highest quality, most durable facility. The Small Business Participation Plan will also be evaluated. The Standard Form (SF) 1442 and Subcontracting Plan (for Other than Small Businesses) will also be required to meet the minimum requirements of the solicitation. All evaluation factors are considered significantly more important than price. CONSTRUCTION COST LIMITATION (CCL): $14,676,000 (Hard Contractual Budget Ceiling) ANTICIPATED SOLICITATION RELEASE DATE: The Government anticipates releasing the solicitation on or about 02 December 2026 (subject to change). Details such as the actual date, time, and location regarding the Site Visit to be held during the first Proprietary Meeting will be provided to Phase II down-selected offerors. SOLICITATION WEBSITE: The official solicitation, when posted, will be available free of charge by electronic posting only and may be found at the Contract Opportunities website (https://www.sam.gov) and the Procurement Integrated Enterprise Environment (PIEE) Solicitation Module (https://piee.eb.mil/sol/xhtml/unauth/index.xhtml). Paper copies of the solicitation will not be issued. Telephone, email, and fax requests for this solicitation will not be honored. Project files are Portable Document Format (PDF) files and can be viewed, navigated, or printed using Adobe Acrobat Reader. To be able to download the solicitation for this project, contractors are required to register at the System for Award Management (SAM) at http://www.sam.gov. Amendments, if/when issued, will be posted. REGISTRATIONS: Offerors shall have and shall maintain an active registration in the following database: System for Award Management (SAM): Offerors shall have and shall maintain an active registration in the SAM database at https://www.sam.gov to be eligible for a Government contract award. If the Offeror is a Joint Venture (JV), the JV entity shall have a valid SAM registration in the SAM database representing the JV as one business/firm/entity. If at the time of award an Offeror is not actively and successfully registered in the SAM database, the Government reserves the right to award to the next prospective Offeror. POINT-OF-CONTACT: The point-of-contact for this procurement is the Contract Specialist, Bonny Dylewski, at Bonny.C.Dylewski@usace.army.mil. This announcement serves as the Advance Notice for this project. Responses to this synopsis are not required. PARTNERING WITH US: https://www.usace.army.mil/Business-WithUs/Partnering/ | 55% | Pre-Solicitation | 12/02/2026 |
Additional Details
Solicitation Number
VA-260-09-RA-0522
Archive Date
Nov 29, 2009