GovChime
Notice ID: e95d99f99d7d29bf695b17d22cac41ccPresolicitation

RECOVERY C--RECOVERY ACT: Install new Heating, Ventilation and Air Conditioning System

Archived on September 30, 2009. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
12:00 AM UTC−05:00
Posted
July 31, 2009
Notice type
Presolicitation
NAICS
541310: Architectural Services

Notice details

PSC
C: ARCHITECT/ENGINEER SERVICES
Last updated
Sep 25, 2026

Identifiers

Solicitation number
VA-260-09-RA-0542
Notice ID
e95d99f99d7d29bf695b17d22cac41cc

Description

THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO CONTRACTORS UNDER to the contract awarded to NAC Architecture of Spokane WA, under the facilities ID/IQ contract.RECOVERY ACT HVAC DESIGN SDS: The following requirement for A/E design services Install New Heating Ventilation and Air Conditioning System to service the SDS floor at the VAMC Spokane is advertised as "information only" and is limited to the contract awarded to NAC Architecture of Spokane WA, under the facilities ID/IQ contract. Provide professional AE services to produce a complete design, construction, contract, bid drawings and specification for a complete installation of a HVAC system serving the 6th floor in building 1 per VA requirements. This should include AHU-7, AHU-5N, AHU-17 and coordination with the A/E designing 2 south retrofit project. Complete site survey and capturing (documenting) of the existing building condition such as structural, mechanical, and electrical engineering design and construction work. This will include but not limited to AHU-7, AHU-5N and AHU-17. Remove the existing duct system serving 2 south and old library from 2nd floor to AHU-7 on 9TH. Design development of new or retrofit HVAC systems including all the duct work, all coils, filters, fans, motors, drives, sensors, valves, insulation, humidifiers, and appurtenances associated with AHU-7, AHU-5N and AHU-17 changing all fan coil units served by AHU-7 to VAV boxes having individual room thermostat and removing existing steam fin tubes units, repairing the opening to match existing (new wall, paint, etc). Design development for demolition and removal of the existing systems.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Brian ThomasContract Specialist 509-434-7224 Contract Specialist

Documents

No documents available.

Lifecycle

Solicitation:VA-260-09-RA-0542
  1. Pre-Solicitation

Formal solicitation typically follows within 30–60 days. (estimate)

  1. Pre-SolicitationCurrentJul 31, 2009

    RECOVERY C--RECOVERY ACT: Install new Heating, Ventilation and Air Conditioning System

    Notice e95d99f99d7d29bf695b17d22cac41cc on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

VA-260-09-RA-0542

Archive Date

Sep 30, 2009