GovChime
Notice ID: 40a69dae7f3cc7206a829f409e36a6c0Solicitation

RECOVERY Z--UPGRADE SECURITY SYSTEM - D-B

Archived on April 10, 2010. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
6:00 AM UTC+01:00
Posted
March 11, 2010
Notice type
Solicitation
Set-aside
Service-Disabled Veteran-Owned Small Business Set Aside
NAICS
236220: Commercial and Institutional Building Construction

Notice details

Place of performance
ONE VETERANS DRIVE;MINNEAPOLIS, MN 55417 USA
PSC
Z: MAINT, REPAIR, ALTER REAL PROPERTY
Last updated
Dec 3, 2025

Identifiers

Solicitation number
VA-263-09-RA-0251
Notice ID
40a69dae7f3cc7206a829f409e36a6c0

Description

RECOVERY ACT PROJECT RFP VA263-09-RA-0251 NIACS 236220 Z - CONSTRUCTION PROJECT - SECURITY SYSTEM UPGRADE PHASE I - DESIGN-BUILD 1. Base Bid Items: a. Provide design services to meet the requirements of this Scope of Work. b. Provide engineering support to transfer the existing VAMC security system database to populate the new security system database. c. Install a new main security computer/server in the Biomed server room in BG-111. There is sufficient racking and UPS battery capacity in the existing room for the new system. d. Install a new card access controller for Room BG-111, complete with card access reader, electric strike, wiring, and door exit device hardware. Connect door controls to new security system. Program door to recognize a door held alarm and door forced alarm. e. Install new control wiring in conduit to connect all new equipment to the new head-end security computer in Room BG-111. f. Install new security system monitoring stations (terminals) in the following five locations: Main Police Station (Building 70), Security substation at the Outpatient Entrance, Telephone Operator substation, HR/Photo ID station on 4M, and the Police Unit Control Center in Building 10. Connect these five stations together and to the new head-end security computer in Room BG-111. Include all vendor provided computer hardware (terminals) and software as required. g. The new security system software shall be licensed for a minimum of 256 card readers and any additional licensing for ID management and data exchange shall be provided. The DB Contractor shall provide licensing for additional card readers in the base bid or any of the selected Optional Items, should their design require such. h. Provide the following spare parts at the completion of the project: 1) 5 spare card readers 2) 5 spare door controllers 3) 5 spare electric strikes 4) 5 spare mag locks 5) 5 spare door contacts 6) 5 spare request to exit switches/devices 7) 2 spare power supplies i. Install a new card access controller for three doors into Room BH-111, complete with card access readers, electric strikes, wiring, and door exit device hardware. Connect door controls to new security system. Program door to recognize a door held alarm and door forced alarm. j. Replace existing card access system with a new card access controller for the Doctor's gate at Parking Lot #1, complete with new card access reader, wiring, and gate exit detection device. Connect gate controls to existing gate and new security system. Demo old card reader equipment. k. Connect the existing alarm system for the VA Agent Cashier (1S), First Floor Canteen Retail and Office (1A-113), and Canteen Storage Rooms BF-122 and BM-123j with the new security system. l. Install a new keypad alarm, door contact, and wiring for Canteen Storage Rooms BW-MRI, 1B-103, and 4A-102. Connect the alarm keypad to the new security system. m. Install a new card access control for the following list of IRM data closets, complete with card access reader, electric strike, wiring, and door exit device hardware. Connect door controls to new security system. Program door to recognize a door held alarm and door forced alarm. 1) 1A-107 2) 1C-119 3) 1H-120 4) 1M-101 5) 1N-102 6) 1P-110 7) 1Q-116 8) 1Q-124 9) 1T-102 10) 1T-104 11) 1T-107 12) 1U-152 2. Optional Items: a. Optional Items may be selected by the Government in any order. b. Optional Item #1: Replace existing card access system for the following list of existing doors, complete with new card access reader. Reconnect electric strike, wiring, and door exit device hardware. Connect door controls to new security system. Program door to recognize a door held alarm and door forced alarm. 1) Basement Floor Dock Entrance, CB-86 2) Basement Floor Supply Entrance, BM-123 3) Basement Floor Dock Door, BP-103 4) Basement Floor MRI, BW-127 5) Basement Floor PET Scan, BW-101d 6) First Floor Visitor's Entrance, C1-22 7) First Floor Outpatient Entrance, C1-1 8) First Floor Emergency Entrance, C1-152 9) First Floor Employee's Entrance, C1-110 10) First Floor Employee's Entrance, at Loading Dock Walkway 11) First Floor Psych Entrance, C1-85 12) First Floor ER Entrance, NE in 13) First Floor ER Entrance, NE out 14) First Floor ER Entrance, NW in 15) First Floor ER Entrance, NW out 16) First Floor Urgent Care Entrance, SW in 17) First Floor Urgent Care Entrance, SW out 18) First Floor Wellness Center, 1G-117 c. Optional Item #2: Replace existing card access system for the following list of existing doors, complete with new card access reader. Reconnect electric strike, wiring, and door exit device hardware. Connect door controls to new security system. Program door to recognize a door held alarm and door forced alarm. 1) Third Floor Research Entrance, 3Q 2) Third Floor Research Entrance, 3Q at Stair 12 3) Third Floor Research Entrance, 3P 4) Third Floor Research Entrance, 3P at Stair 10 5) Third Floor Research Entrance, 3P to 3J Entry 6) Third Floor Research, 3P-129 7) Third Floor, 3R-141 8) Fourth Floor Research Entrance, 4Q 9) Fourth Floor Research Entrance, 4Q at Stair 12 10) Fourth Floor Research Entrance, 4P 11) Fourth Floor Research Entrance, 4P at Stair 10 12) Building 68, Daycare Entry 13) Building 68, Rear Door 14) Building 68, three doors on Second Floor 15) Building 73, Front Door 16) Building 73, Rear Door 17) Building 76, Front Vestibule 18) Building 76, Main Entry 19) Building 76, Room 145 20) Building 76, Room 138 (two doors) d. Optional Item #3: Install a new card access control for the following list of IRM data closets, complete with card access reader, electric strike, wiring, and door exit device hardware. Connect door controls to new security system. Program door to recognize a door held alarm and door forced alarm. 1) BT-102 2) BD-101d 3) BA-111 4) BH-105 5) BP-107 6) BN-102 7) BQ-110d 8) BQ-110b 9) BW-124 10) BT-105 11) BD-101a 12) BD-101e 13) BC-101 14) BG-101 15) BA-103 16) BT-104 17) 1K-120a 18) 1F-119d 19) 1F-119b 20) 1D-120c 21) 1E-117c 22) 1Q-117a 23) 1J-121a e. Optional Item #4: Install a new card access control for the following list of IRM data closets, complete with card access reader, electric strike, wiring, and door exit device hardware. Connect door controls to new security system. Program door to recognize a door held alarm and door forced alarm. 1) 2B-105 2) 2T-104 3) 2C-121 4) 2J-132a 5) 2J-132d 6) 2Q-103 7) 2V-153b 8) 2V-153d 9) 2V-153f 10) 2U-155 11) 2D-122a 12) 2E-122b 13) 2F-121b 14) 2F-121d 15) 2K-122a 16) 2H-116 17) 2C-121 18) 2T-101 19) 2T-102 20) 2T-104 21) 2T-105 22) 2A-107 23) 2M-116 f. Optional Item #5: Install a new card access control for the following list of IRM data closets, complete with card access reader, electric strike, wiring, and door exit device hardware. Connect door controls to new security system. Program door to recognize a door held alarm and door forced alarm. 1) 3J-124a 2) 3U-138 3) 3T-101 4) 3D-122b 5) 3E-122b 6) 3F-122a 7) 3F-122d 8) 3K-122a 9) 3H-123 10) 3J-124d 11) 3N-108 12) 3Q-118a 13) 3Q-118f 14) 3Q-118c 15) 3T-108 16) 3T-106 17) 3A-114 18) 3C-121 19) 3M-101 g. Optional Item #6: Install a new card access control for the following list of IRM data closets, complete with card access reader, electric strike, wiring, and door exit device hardware. Connect door controls to new security system. Program door to recognize a door held alarm and door forced alarm. 1) 4M-106 2) 4B-149 3) 4U-108 4) 4D-122a 5) 4E-122b 6) 4F-121a 7) 4F-121d 8) 4K-124a 9) 4J-121a 10) 4J-121d 11) 4N-107 12) 4Q-118c 13) 4P-126 14) 4T-106 15) 4T-104 16) 4T-101 17) 4B-119 18) 4H-122 19) 4Q-118b Building 9, Room 324 20) Building 9 Server Room 21) Building 10, Room 107 22) Building 10, Room 3a 23) Building 49, Room SV03 24) Building 49, Room 124 25) Building 68, Room 200 26) Building 69 - Energy Center, Room 112 27) Building 72 - Maintenance Garage 3. Optional Item #7: Install a new wireless pendant duress/panic device system in the Emergency Room. Provide five pendants with chargers. System must meet the requirements of the Mission Critical Facilities, Physical Security Design Manual for VA Facilities, Section 10.4.3.4. Also provide a cost per pendant and charger for additional pendants. 4. Optional Item #8: Install a new wireless pendant duress/panic device system in the 4E Ward. Provide four pendants with chargers. System must meet the requirements of the Mission Critical Facilities, Physical Security Design Manual for VA Facilities, Section 10.4.3.4. Also provide a cost per pendant and charger for additional pendants. 5. Optional Item #9: Install a new wireless pendant duress/panic device system in the 2K and 2L Wards. Provide four pendants with chargers. System must meet the requirements of the Mission Critical Facilities, Physical Security Design Manual for VA Facilities, Section 10.4.3.4. Also provide a cost per pendant and charger for additional pendants. 6. Optional Item #10: Install 32 new duress (panic) alarms in the following rooms: 4K101, 4K102, 4K103, 4K104, 4K106, 4K108, 4K111, 4K115, 4K118, 4K120, 4K123, 4K125 (2 desks), 4K126, 4K127, 4K128, 4K129, 4K131, 4K132, 4K133, 4K135, 4K136, 4K138, 4K139, 4K140, 4K141, 4K142, 4K142a, 4K143, 4L139 (2 desks). These alarms shall be an under desk hidden panic alarm type similar to the style in current use in the Medical Center. Provide all interface cards/boards, cabling, conduit, etc. to connect the alarms to the new security system. 7. Optional Item #11: Provide video integration of the existing security cameras for Building 70. If a software upgrade of the existing Lenel video security system is required to interface with the new security system, it shall be included. 8. Optional Item #12: Modifications of existing card access and new card access as follows: a. Install a new card access controller for three double-doors into Radiology, complete with card access readers, electric strikes, wiring, and door exit device hardware. Connect door controls to new security system. Program door to recognize a door held alarm and door forced alarm. b. Replace existing card access system with a new card access controller for Room 2B-105, complete with card access reader, electric strike, wiring, and door exit device hardware. Connect door controls to new security system. Program door to recognize a door held alarm and door forced alarm. Demo old card reader equipment. c. Install a new card access controller for one double-door and two single doors into Post Anesthesia Recovery, complete with card access readers, electric strikes, wiring, and door exit device hardware. Install new automatic door opener hardware on one double-door and one single door. Connect door controls to new security system. Program door to recognize a door held alarm and door forced alarm. d. Replace existing card access system for the following existing doors in Building 49. Reconnect electric strike, wiring, and door exit device hardware. Connect door controls to new security system. Program door to recognize a door held alarm and door forced alarm. Connect the existing alarm keypad to the new security system. 1) Building 70 to Building 49 double doors. 2) Front door. 3) Loading dock door. 4) Rear corridor near Scientific Apparatus Shop. 9. Optional Item #13: Replace existing card access system for the following existing doors in the Pharmacy Service. Reconnect electric strike, wiring, and door exit device hardware. Connect door controls to new security system. Program door to recognize a door held alarm and door forced alarm. Connect the existing alarm keypad to the new security system. a. Three doors in the Inpatient Pharmacy (Room BR-113). b. The Narcotics Cage in the Inpatient Pharmacy. c. The Investigational Cage in the Inpatient Pharmacy (Room BR-116). d. Outpatient Pharmacy (Room 1R-101), two hallway entry doors, one door in the Profile Area, one door in the Narcotics Vault, Narcotics Cage, and the Counseling Room. e. Satellite Pharmacy (Room 3T-102). f. Install a new card access controller for one door into the Hem/Onc Inpatient Pharmacy (3F), complete with card access reader, electric strike, wiring, and door exit device hardware. Install a new alarm pin keypad at the card reader to operate the same as the other Pharmacy keypads. Connect door controls and keypads to new security system. Program door to recognize a door held alarm and door forced alarm. The VA has scheduled a site visit for this project on February 22, 2010 at 9:00 am at the VA Medical Center, Facility Engineering Service, Project Section, Room BR-145. Solicitation and scope of work documents are expected to be available at www.fbo.gov on or about February 11, 2010. Tentative Schedule: Request for proposal issued 2/11/2010 Site walks 2/22/2010 Proposal submitted 3/11/2010 Contract award 3/22/2010 Pre-Construction Conference and Notice to Proceed (NTP)- Design 3/31/2010 65% Design package submitted NTP+60 65% VA design review complete NTP+75 65% Design review meeting NTP+77 100% Design complete NTP+105 100% Backcheck complete NTP+115 Notice to proceed - Construction NTP+116 Construction start NTP+116 Construction complete NTP+210 Schedule Objectives - The anticipated completion of this project is 210 calendar days after "Notice to Proceed (NTP) - Design." Note: A construction notice to proceed (NTP) will not be issued until the 100% back check is complete and the COTR has notified the Contracting Officer that the second NTP can be issued. In accordance with the VA Acquisition Regulations (VAAR 836.204) Disclosure of the Magnitude of Construction Projects, the range for this project is between $500,000 and $1,000,000. Liquidated Damages: $200.00 per calendar day, including holidays and weekends. NAICS 236220 - $31.0M applies. In accordance with PL 109-461 this project is 100% set-aside for Service disabled veteran-owned small business (SDVOSB) concerns. All responsible and interested offerors should submit a proposal in accordance with RFP VA263-09-RA-0238. Offerors are to complete and submit their proposals (original and one copy required) not later than Thursday, March 11, 2010 at 4:30 p.m. CT. POC: Michael Owen, Contracting Officer, E-mail: michael.owen@va.gov Facsimile or other electronic methods WILL NOT be acceptable for the purposes of submitting a proposal. If proposal is to be mailed or delivered by third party courier the address is: Department of Veterans Affairs, Minneapolis Contracting and Purchasing Office, 708 South Third Street, Suite 200E, Minneapolis, MN 55415 ATTN: M. Owen. If proposal is to be hand delivered the delivery address is the same as above.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Michael L OwenContract Specialist 612-467-2190 Contracting Officer

Documents

No documents available.

Lifecycle

Solicitation:VA-263-09-RA-0251
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. 4×
    Pre-SolicitationFeb 10, 2010

    RECOVERY Z--UPGRADE SECURITY SYSTEM - D-B

    Notice 76c5675407c74fca2b1ea87ffa05dc40 on SAM.gov

  2. SolicitationCurrentMar 11, 2010

    RECOVERY Z--UPGRADE SECURITY SYSTEM - D-B

    Notice 40a69dae7f3cc7206a829f409e36a6c0 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
Posting Amendment 0006 to provide official RFI Responses, updated Solicitation Documents, extend the Proposal Due Date, and other official information.
-Solicitation11/25/2026
EHRM Infrastructure Upgrades Construction – Dallas CMOP
-Solicitation12/23/2026
Project 619-21-106 - EHRM Infrastructure Upgrades - Construction - Montgomery VAMC located in Montgomery, AL
-Solicitation01/05/2027
INTRODUCTION The Department of Veterans Affairs (VA), Veterans Health Administration (VHA), Program Contracting Activity Central (PCAC) anticipates soliciting bids and subsequently awarding a single firm-fixed-price contract for the design-bid-build EHRM Training and Administrative Space Construction project at the St. Louis VA Health Care System (VAHCS) John Cochran campus located at 915 North Grand BLVD, St. Louis, MO 63106. PROJECT DESCRIPTION The VA Saint Louis Health Care System John Cochran Division requires a construction contractor to perform upgrades in support of the Electronic Health Record Modernization (EHRM) program. The construction area is located on the first floor of Building 2 and includes both training and administrative spaces. This project includes the execution of Phases 2, 3, and 4 of the associated design plans. Phase 2 addresses the North Training Rooms (Rooms 139, 140, 141, 142), totaling approximately 2,000 square feet. Work includes upgraded power and data infrastructure and new flooring and wall finishes. Phase 3 addresses the South Training Rooms (Rooms 126, 127, 128), totaling approximately 1,800 square feet. Work includes upgraded power and data infrastructure and new flooring and wall finishes. Additionally, Phase 3 includes the renovation of a 130-square-foot breakroom, with new floor and wall finishes, casework, a new sink, and a cold-water tie-in for an ice machine. Phase 4 addresses multiple areas: renovation of an approximately 1,400-square-foot corridor with new floor and wall finishes; upgrades to two offices (approximately 150 square feet each) with upgraded power and data infrastructure and new flooring and wall finishes; and upgrades to an existing data closet, including new floor and wall finishes, installation of an additional server rack with associated equipment, and replacement of the existing mini-split HVAC unit. Note: Phase 1 is excluded from this scope, as it was completed under a separate contract. Note: All power and data drops originally indicated as floor-mounted shall now be wall-mounted, as shown on revised drawings EP101 and TN101. Installation must match these updated sheet details; no floor-mounted outlets are permitted. ADMINISTRATIVE The solicitation will be issued as an Invitation for Bids (IFB) conducted in accordance with FAR part 14 and will be evaluated in accordance with the procedures listed in the solicitation. The solicitation will be issued as a total Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside. Offers received from other than SDVOSB concerns will not be considered. The applicable North American Industry Classification System (NAICS) code is 236220 with a size standard of $45.0 million. The solicitation will be issued in early to mid-October 2026. The period of performance is approximately 150 calendar days from the issuance of the notice to proceed. In accordance with VAAR 836.204, the magnitude of construction is between $250,000 and $500,000. This notice is not a request for competitive offers. All questions must be submitted in writing to the issuing office via email to Amanda.Webster@va.gov. Telephone calls will not be accepted.
-Solicitation12/02/2026
Please see the following page for the solicitation 36C24227R0009 Amendment 0001 regarding Replace Chilled Water Pump at the Boiler Plant JJP VAMC Bronx, NY.
-Combined Synopsis11/17/2026

Additional Details

Solicitation Number

VA-263-09-RA-0251

Archive Date

Apr 10, 2010