GovChime
Notice ID: d4b5575942ec692d268c4e12684bdc05Solicitation

RECOVERY Z--Replace Heating, Ventilation and Air Conditioning Coils ph. II

Archived on March 24, 2010. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
6:00 AM UTC+01:00
Posted
February 11, 2010
Notice type
Solicitation
Set-aside
Service-Disabled Veteran-Owned Small Business Set Aside
NAICS
236220: Commercial and Institutional Building Construction

Notice details

Place of performance
ONE VETERANS DRIVE;MINNEAPOLIS, MN 55417 USA
PSC
Z: MAINT, REPAIR, ALTER REAL PROPERTY
Last updated
Dec 4, 2025

Identifiers

Solicitation number
VA-263-09-RA-0261
Notice ID
d4b5575942ec692d268c4e12684bdc05

Description

RECOVERY ACT PROJECT RFP VA263-09-RA-0261 NIACS 236220 Z - CONSTRUCTION PROJECT - REPLACE HVAC COILS - PHASE II General Intention: The Contractor shall provide all engineering, labor, materials and equipment to replace the HVAC coils as listed in this scope of work. Statement of Bid Item(s): 1. Isolate existing coil. 2. Drain system, as required, to complete work. 3. Remove existing coil. Demolish reheat coil from first elbow on steam line outside of air handling unit and to steam trap on condensate line. Demolish preheat coil from steam side header (header shall remain in place) to valve fitting on condensate line outside of air handling unit. Dispose of off-site. 4. Remove any auxiliary coils that have been installed in addition to the preheat valve. Contractors to verify locations during pre-proposal site walk. 5. Install new reheat or preheat coil, as required, to either match existing or maintain current heating load. Auxiliary coils on the preheat units shall not be replaced. 6. Ensure all supply and condensate return piping connections are correct. 7. Install new supply and return piping. 8. Repair or replace insulation, as necessary. 9. Label piping, as necessary. 10. Seal penetrations through air handling units. 11. Ensure valves and controls are operating properly. 12. Check, test, and start-up system. 13. If additional repairs are necessary, the contractor shall provide the VA with written documentation describing the necessary repairs and the cost to complete. 14. Work shall be completed during the normal workday. Schedule Objectives - The anticipated completion of this project is 14 calendar days after Notice to Proceed (NTP). In accordance with the VA Acquisition Regulations (VAAR 836.204) Disclosure of the Magnatude of Construction Projects, the range for this project is between $250,000 and $500,000. Liquidated Damages: $100.00 per calendar day, including holidays and weekends. NAICS 236220 - $31.0M applies. In accordance with PL 109-461 this project is 100% set-aside for Service disabled veteran-owned small business (SDVOSB) concerns. All responsible and interested offerors should submit a proposal in accordance with RFP VA263-09-RA-0261. RFP documents will be available on or about January 22, 2010. Offerors are to complete and submit their proposals (original and one copy required) not later than Monday, February 22, 2010 at 4:30 p.m. CT. POC: Michael Owen, Contracting Officer, E-mail: michael.owen@va.gov Facsimile or other electronic methods WILL NOT be acceptable for the purposes of submitting a proposal. If proposal is to be mailed or delivered by third party courier the address is: Department of Veterans Affairs, Minneapolis Contracting and Purchasing Office, 708 South Third Street, Suite 200E, Minneapolis, MN 55415 ATTN: M. Owen. If proposal is to be hand delivered the delivery address is the same as above.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Michael L OwenContract Specialist 612-467-2190 Contracting Officer

Documents

No documents available.

Lifecycle

Solicitation:VA-263-09-RA-0261
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. 4×
    Pre-SolicitationJan 19, 2010

    RECOVERY Z--Replace Heating, Ventilation and Air Conditioning Coils ph. II

    Notice ac32bc44e191a03fc653c3990a8ee781 on SAM.gov

  2. SolicitationCurrentFeb 11, 2010

    RECOVERY Z--Replace Heating, Ventilation and Air Conditioning Coils ph. II

    Notice d4b5575942ec692d268c4e12684bdc05 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

VA-263-09-RA-0261

Archive Date

Mar 24, 2010